Polska Grupa Górnicza S.A.
Polen · 35 offene Verfahren · 664 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Provision of services related to measuring harmful factors to health in the work environment (including hygiene assessment), measurements of concentrations of elements or chemical compounds at workstations of underground and surface crews of PGG S.A. Divisions, divided into two tasks
Frist 21. Aug. · noch 1 Tage
Supply of wooden pallets for the Branches of Polish Mining Group S.A. - group no. 204-1
Frist 21. Aug. · noch 1 Tage
Supply of special steel sheets for Polish Mining Group S.A. Repair and Production Plant Division – group no. 273-4.
Frist 21. Aug. · noch 1 Tage
Supply of pipes and flanged fittings made of plastic materials for the fire protection pipeline for the Polish Mining Group SA KWK Ruda Branch as part of consignment warehouses – group no. 252-12
Frist 24. Aug. · noch 4 Tage
Comprehensive management of storage yards and internal transport on the surface (including mining narrow-gauge railway networks) at Polish Mining Group S.A. KWK Sośnica
Frist 24. Aug. · noch 4 Tage
Lease of sidewalk sweepers with guarantee service provision throughout the lease period for Polish Mining Group S.A. KWK Piast-Ziemowit Division with division into tasks
Frist 24. Aug. · noch 4 Tage
Supply of double-jaw stirrups for connecting sidewalk housing elements for the Divisions of Polish Mining Group S.A. KWK Mysłowice-Wesoła Division as part of consignment warehouses - group no. 288-1
Frist 25. Aug. · noch 5 Tage
Maintenance of railway infrastructure of the PGG S.A. Piast-Ziemowit Department "Ziemowit Traffic" siding divided into two tasks: Task No. 1 - Diagnostics, maintenance and current maintenance of railway infrastructure together with the service and supply of elements necessary for the implementation of current repairs Task No. 2 - Comprehensive repair of railway infrastructure
Frist 25. Aug. · noch 5 Tage
Construction of a temporary LNG regasification station with storage tank and operation as well as delivery of liquefied LNG for Polish Mining Group S.A. KWK ROW Marcel Mine Division.
Frist 25. Aug. · noch 5 Tage
Supply, assembly and commissioning of an installation for the production of pea mixes for PGG S.A. KWK Piast-Ziemowit Ruch Piast
Frist 25. Aug. · noch 5 Tage
Modernization of the main fan stations at shaft V including the supply and replacement of control devices for PGG S.A. KWK Murcki - Staszic Branch
Frist 26. Aug. · noch 6 Tage
Comprehensive handling of storage yards and internal transport on the surface (including narrow-gauge railway networks) for Polish Mining Group S.A. KWK Murcki - Staszic
Frist 26. Aug. · noch 6 Tage
Comprehensive maintenance of storage yards and internal surface transport (including narrow-gauge mining railway networks) at Polish Mining Group S.A. KWK Mysłowice-Wesoła
Frist 27. Aug. · noch 7 Tage
Lease of sidewalk sweepers with guarantee service coverage throughout the lease period for Polish Mining Group S.A. KWK Piast-Ziemowit Division divided into tasks
Frist 28. Aug. · noch 8 Tage
Supply of concrete mine linings for roadway support for the Divisions of Polish Mining Group S.A. - group no. 288-5.
Frist 28. Aug. · noch 8 Tage
Railway siding operation for Polska Grupa Górnicza S.A. Piast-Ziemowit Department Piast Mine with division into two tasks: Task 1 – Diagnostics, maintenance and current upkeep of railway infrastructure together with service and delivery of elements necessary for the implementation of current repairs. Task 2 – Comprehensive repair of railway infrastructure
Frist 31. Aug. · noch 11 Tage
Construction of a temporary LNG regasification station with a storage tank and operation, as well as delivery of liquefied LNG for Polish Mining Group S.A. Coal Mine ROW Marcel Shaft.
Frist 1. Sept. · noch 12 Tage
Provision of comprehensive laundry services for Polish Mining Group S.A. KWK Piast-Ziemowit Division divided into 2 tasks
Frist 1. Sept. · noch 12 Tage
Supply of spare parts for wall casings - KW/ZRP for Polish Mining Group S.A. Repair and Production Plant Division - material group 295-27-17
Frist 1. Sept. · noch 12 Tage
Performance of research, inspection, measurement, regulatory services, extraction and shaft equipment, shaft casings and specialized research for the Divisions of Polska Grupa Górnicza S.A. for 2026-2027
Frist 3. Sept. · noch 14 Tage
Provision of comprehensive laundry services for Polish Mining Group S.A. KWK Piast-Ziemowit Branch divided into 2 tasks
Frist 3. Sept. · noch 14 Tage
Lease of a shearer loader with warranty service coverage throughout the lease period for Polish Mining Group S.A. KWK Mysłowice-Wesoła Branch
Frist 7. Sept. · noch 18 Tage
Lease of two sidewalk sweepers of 150 kW class with guaranteed warranty service maintenance throughout the lease period for Polska Grupa Górnicza S.A. Branch KWK ROW Jankowice Mine with division into tasks
Frist 7. Sept. · noch 18 Tage
Conclusion of a framework agreement for the provision of servicing services of rented shearer loader machines manufactured by GRENEVIA S.A. for the Branches of Polska Grupa Górnicza S.A.
Frist 8. Sept. · noch 19 Tage
Supply of compressed air for PGG S.A. Branch KWK Mysłowice-Wesoła
Frist 8. Sept. · noch 19 Tage
Modernization of 2 belt conveyors in terms of increasing their functionality to include human transport on the upper belt run for PGG S.A. Branch KWK ROW Ruch Marcel
Frist 8. Sept. · noch 19 Tage
Lease of a sidewalk combine harvester with a working unit power of 130 kW together with warranty service support throughout the lease period for Polska Grupa Górnicza S.A. KWK Sośnica Branch
Frist 8. Sept. · noch 19 Tage
Lease of five sidewalk combines of 150 kW class with full warranty and service support throughout the lease period for Polska Grupa Górnicza S.A. KWK Mysłowice-Wesoła Branch
Frist 14. Sept. · noch 25 Tage
Provision of Software Assurance (SA) Services for Microsoft Software Licenses
Frist 14. Sept. · noch 25 Tage
Supply of transformers for Polish Mining Group S.A. branches with division into tasks.
Frist 14. Sept. · noch 25 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
2024707
2025671
2026432
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| GRENEVIA S.A. | 51 | 2023–2026 |
| MAS Sp. z o.o. | 27 | 2023–2026 |
| PMT POLSKA Sp. z o.o. | 18 | 2024–2026 |
| Becker-Warkop Sp. z o.o. | 14 | 2024–2026 |
| DSI Schaum Chemie sp. z o.o. | 13 | 2024–2026 |
| Huta Łabędy S.A. | 12 | 2024–2026 |
| Petek i Wspólnicy Sp. z o.o. Sp. k. | 11 | 2024–2026 |
| Ferrit s.r.o. | 11 | 2023–2026 |
| SAG Sp. z o.o. | 10 | 2024–2026 |
| PMT Polska Sp. z o. o. | 9 | 2023–2025 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →