Friedrich & ClementBETA

Polska Grupa Górnicza S.A.

Poland · 22 open tenders · 1,985 awards with a known winner

How to bid in this country: portals, deadlines, thresholds →

Current tenders

Construction of thermal insulation screens using the injection method on the building - the reclamation block Marcel of the KWK ROW Ruch Marcel Branch
Deadline 2 Nov ·
Supply of plastic seals to Branches of Polska Grupa Górnicza SA – Group No 252-11
Deadline 3 Nov ·
Delivery of paints, varnishes and thinners to Branches of Polska Grupa Górnicza S.A., Group No. 243-1
Deadline 3 Nov ·
Production of thermal insulation screens using the injection method on the PGG S.A. heap of the KWK ROW Ruch Rydułtowy Branch.
Deadline 3 Nov ·
Delivery of covers and bags for Branches of Polska Grupa Górnicza S.A. - Group No. 192-2
Deadline 4 Nov ·
Supply of a new shearer loader for Polish Mining Group S.A. Piast-Ziemowit Branch Ziemowit Mine.
Deadline 5 Nov ·
Lease of two longitudinal combine harvesters together with security of warranty and service during the entire lease period for Polska Grupa Górnicza S.A. Branch of KWK ROW Ruch Chwałowice
Deadline 6 Nov ·
Comprehensive maintenance of railway infrastructure PGG S.A. ROW Hard Coal Mine Branch divided into tasks.
Deadline 9 Nov ·
Supply of single and multi-component technical gases and gas mixtures with lease (bottles, bundles, baskets) to Branches of Polska Grupa Górnicza SA – Group No 241-6
Deadline 9 Nov ·
Car transport and processing of mining waste from Polska Grupa Górnicza S.A. Branch of KWK Bolesław Śmiały at the Contractor's disposal
Deadline 9 Nov ·
Provision of maintenance services and periodic inspections of extraction machines of mining shaft lifts together with communication and shaft signaling systems and glazing devices in PGG S.A. Branches divided into 2 tasks
Deadline 9 Nov ·
Delivery of spare parts for SMT SCHARF queues for Branches of Polska Grupa Górnicza S.A. - Group No. 295-22-02
Deadline 10 Nov ·
conclusion of a framework contract for the provision of maintenance services for Grenevia’s own longwall combine harvesters for Polska Grupa Górnicza S.A.
Deadline 10 Nov ·
Provision of services related to the measurement of factors harmful to health in the work environment (including hygienic assessment), measurements of concentrations of elements or chemical compounds at the work stations of the bottom and surface crew of PGG S.A. Branches divided into two tasks.
Deadline 12 Nov ·
Supply of industrial automation elements for Branches of Polska Grupa Górnicza S.A. - Group No. 316-1
Deadline 16 Nov ·
Lease of a longwall combine harvester with a service guarantee during the entire lease period for Polska Grupa Górnicza S.A. Branch of KWK Piast-Ziemowit Ruch Piast.
Deadline 19 Nov ·
Delivery of protective, prophylactic and bathing footwear for Branches of Polska Grupa Górnicza S.A. - Group No. 193-2
Deadline 19 Nov ·
Collection from unloading fronts, transport and incorporation of extractive waste into the area of the former Sośnica reservoir in the manner specified in the construction project entitled ‘Shaping the Sośnica reservoir by raising it to 270m above sea level with development in a recreational direction’ for PGG S.A. Branch of KWK Sośnica
Deadline 20 Nov ·
Delivery of 4 battery bottom locomotives for the needs of PGG S.A. KWK Piast-Ziemowit Ruch Piast
Deadline 25 Nov ·
conclusion of a framework contract for the provision of maintenance services for EICKHOFF's own longwall combine harvesters for Polska Grupa Górnicza S.A.
Deadline 25 Nov ·
Delivery of control hydraulics control units and actuators to mechanized housing sections for Branches of Polska Grupa Górnicza S.A. - Group No. 295-15.
Deadline 27 Nov ·
Collection, transport and processing of extractive waste and management of waste from the combustion of hard coal in grate and dust boilers without flue gas desulphurisation products (slags) – through their use in the construction works of the ‘North’ facility in accordance with the approved construction project for PGG S.A.
Deadline 3 Dec ·

Purchasing rhythm

Tenders published per year — who knows the rhythm prepares before the notice appears.

2018291
2019374
2020273
2021225
2022424
2023363
2024690
2025657
2026562

Clement What the numbers say about this buyer

  • 25% of this buyer's awards went to companies that had already won here before (3,728 awards since 2017, spread over 1,061 companies). That is well below the national norm (39%) — this buyer switches suppliers more often than others.n = 3,728 awards since 2017
  • 16% of the bids received came from other countries (387 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 387
  • The median procedure drew 3 bids (3,278 procedures with a bid count); 30% ended with a single bidder. Country: median 2.2 bids.n = 3,278
  • The award came in at a median 85% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 88%.n = 21
  • 83% of the bids received came from small and medium-sized enterprises (387 procedures with a bid mix). Country: 65%.n = 387
  • 9% of awards went to companies from abroad (3,728 awards with a known winner country). National average: 5%.n = 3,728

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 33% of 25,337 closed expectation windows produced a notice.

  • Sept 2026Other services
    about every 4 months · 19 awards · last May 2026 to KARBON Sp. z o.o.
  • Sept 2026Transport services
    about every 2 months · 35 awards · last Jul 2026 to ENTORO Sp. z o.o.
  • Sept 2026Clothing & footwear
    about every 2 months · 32 awards · last Jul 2026 to Grupa Azoty Zakłady Azotowe PUŁAWY S.A.
  • Oct 2026Mining & construction machinery
    about every month · 351 awards · last Sept 2026 to Becker Warkop Sp. z o. o.
  • Oct 2026Transport equipment
    about every 2 months · 59 awards · last Aug 2026 to TIP-TOPOL Sp. z o.o.
  • Nov 2026Industrial machinery
    about every 2 months · 331 awards · last Sept 2026 to Minova Ekochem Spółka z ograniczoną odpowiedzialnością
  • Nov 2026Petroleum & fuels
    about every 2 months · 22 awards · last Sept 2026 to FLUKAR
  • Nov 2026Construction materials
    about every month · 306 awards · last Oct 2026 to GOPOL Anna Gola

Who has won here before

CompanyAwardsPeriod
GRENEVIA S.A.532023–2026
MAS Sp. z o.o.292023–2026
PMT POLSKA Sp. z o.o.222024–2026
Petek i Wspólnicy Sp. z o.o. Sp. k.202024–2026
Becker-Warkop Sp. z o.o.152024–2026
Huta Łabędy S.A.142024–2026
DSI Schaum Chemie sp. z o.o.132024–2026
SAG Sp. z o.o.122024–2026
Ferrit s.r.o.122023–2026
LINTER S.A.112024–2026

From 18.4M documented awards · regular winners know this buyer's requirements — that is your competition.

New tenders from this buyer — in your inbox at 7:30 every morning.
Register now →