Comprehensive maintenance of railway infrastructure PGG S.A. ROW Hard Coal Mine Branch divided into tasks.
Kompleksowa obsługa infrastruktury kolejowej PGG S.A. Oddział KWK ROW z podziałem na zadania.
Poland · Katowice · how to bid here →
Your path to submission
- Deadline: 9 November at 08:00 — 36 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL, POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (35 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ENTORO Sp. z o.o..n = 35
- 24% of this buyer's awards went to companies that had already won here before (3,674 awards since 2017, spread over 1,034 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 3,674 awards since 2017
- The median procedure drew 3 bids (3,212 procedures with a bid count); 30% ended with a single bidder. Sector: median 2 bids.n = 3,212
- The award came in at a median 85% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 96%.n = 21
- 19% of the bids received came from other countries (321 procedures with a bid mix) — all bidders, not just the winners. Sector: 30%.n = 321
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Poland · Transport services, 25 contracts went to foreign companies over the last 3 years (of 16,916 recorded awards) — mostly from Germany, Denmark, Belgium.
Submission language: POL.
Typical field: median 5 (from 33 awards).
What the buyer is looking for
1. The sectoral procurement procedure is conducted in an open tender procedure on the basis of the provisions of the Act of 11 September 2019 (Journal of Laws 2024, item 1320, as amended), hereinafter referred to as the Public Procurement Act. 2. The subject of the contract is: Comprehensive service of railway infrastructure of PGG S.A. Branch of KWK ROW divided into tasks: Task 1 – Carrying out transport and manoeuvres for PGG S.A. Branch of KWK ROW Ruch Jankowice and Ruch Chwałowice Task 2 – Carrying out transport and manoeuvres for PGG S.A. Branch of KWK ROW Ruch Marcel Task 3 – Managing the railway infrastructure of PGG S.A. Branch of KWK ROW Ruch Jankowice and Ruch Chwałowice Task 4 – Managing the railway infrastructure of PGG S.A. Branch of KWK ROW Ruch Marcel 3. A detailed description of the subject of the contract (hereinafter referred to as SOPZ) is contained in Annex 1 to the ToR.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| GRENEVIA S.A. | 52 | 2023–2026 |
| MAS Sp. z o.o. | 29 | 2023–2026 |
| PMT POLSKA Sp. z o.o. | 22 | 2024–2026 |
| Petek i Wspólnicy Sp. z o.o. Sp. k. | 19 | 2024–2026 |
| Becker-Warkop Sp. z o.o. | 15 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.