Friedrich & ClementBETA

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

Polen · 12 offene Verfahren · 255 dokumentierte Zuschläge

Aktuelle Ausschreibungen

Performing tests and measurements for JSW S.A facilities
Frist 24. Aug. · noch 5 Tage
Deepening in JSW S.A. KWK "Borynia-Zofiówka" "Borynia" Shaft II together with execution of bilateral shaft entrance at elevation 1120 m
Frist 24. Aug. · noch 5 Tage
Supplies of work clothing and underwear for JSW S.A. mines with a 12-month implementation period from the contract date.
Frist 25. Aug. · noch 6 Tage
Hire of longwall shearer with equipment for the needs of JSW S.A. KWK "Borynia-Zofiówka" "Zofiówka" Section
Frist 28. Aug. · noch 9 Tage
Supplies of dust wetting preparations for coal mines JSW S.A. with an implementation period of 12 months from the date of contract conclusion.
Frist 28. Aug. · noch 9 Tage
Periodic inspection of main ventilation fans type WPK 3.9 W-1, W-2 and W-3 at shaft Vz for KWK "Borynia-Zofiówka" Ruch "Zofiówka" together with works related to repair of isolation gates, reversing flaps and air-lock doors
Frist 1. Sept. · noch 13 Tage
Maintenance of main conveyors in JSW S.A. KWK "Knurów–Szczygłowice"
Frist 7. Sept. · noch 19 Tage
Supplies of metallurgical products to JSW S.A. mines with a 12-month delivery period from the date of contract conclusion.
Frist 8. Sept. · noch 20 Tage
Supplies for JSW S.A. mines of electric detonators, explosive materials and detonating cord with a 12-month implementation period from the date of conclusion of the contract.
Frist 10. Sept. · noch 22 Tage
Supply and installation of two new jaw crushers OM–20 L3E and OM–20 P3E at the Coal Mechanical Processing Plant in JSW S.A. KWK "Knurów-Szczygłowice" Knurów Mine
Frist 10. Sept. · noch 22 Tage
Periodic inspection of WPK 3.9 main ventilation fans types W-1, W-2 and W-3 at shaft Vz for KWK "Borynia-Zofiówka" Ruch "Zofiówka" together with work related to the repair of isolation gates, reversing flaps and airlock doors
Frist 11. Sept. · noch 23 Tage
Maintenance and cleaning of sump tanks and settlement tanks of pit water from accumulated material at JSW S.A. KWK "Borynia – Zofiówka"
Frist 15. Sept. · noch 27 Tage

Einkaufsrhythmus

Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.

2024870
2025573
2026177

Wer hier bisher gewonnen hat

UnternehmenZuschlägeZeitraum
GRENEVIA S.A.352024–2026
MAS Sp. z o.o.182024–2026
LINTER S.A.142024–2026
PMT POLSKA Sp. z o.o.132024–2025
Joy Global (Poland) Sp. z o.o.102024–2026
Centrala Zbytu Węgla WĘGLOZBYT S.A.92024–2026
Minova Ekochem Sp. z o.o.92024–2026
Huta Łabędy S.A.82024–2026
Matix Sp. z o.o.82024–2026
Przedsiębiorstwo Robót Specjalistycznych Geo Serwis Sp. z o.o.72024–2026

Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.

Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →