Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji
Poland · 14 open tenders · 432 documented awards
Current tenders
Deepening in JSW S.A. KWK "Borynia-Zofiówka" "Borynia" Shaft II together with execution of bilateral shaft entrance at elevation 1120 m
Deadline 24 Aug · 4 days left
Performing tests and measurements for JSW S.A facilities
Deadline 24 Aug · 4 days left
Supplies of work clothing and underwear for JSW S.A. mines with a 12-month implementation period from the contract date.
Deadline 25 Aug · 5 days left
Supplies of dust wetting preparations for coal mines JSW S.A. with an implementation period of 12 months from the date of contract conclusion.
Deadline 28 Aug · 8 days left
Hire of longwall shearer with equipment for the needs of JSW S.A. KWK "Borynia-Zofiówka" "Zofiówka" Section
Deadline 28 Aug · 8 days left
Periodic inspection of main ventilation fans type WPK 3.9 W-1, W-2 and W-3 at shaft Vz for KWK "Borynia-Zofiówka" Ruch "Zofiówka" together with works related to repair of isolation gates, reversing flaps and air-lock doors
Deadline 1 Sept · 12 days left
Maintenance of main conveyors in JSW S.A. KWK "Knurów–Szczygłowice"
Deadline 7 Sept · 18 days left
Supplies of metallurgical products to JSW S.A. mines with a 12-month delivery period from the date of contract conclusion.
Deadline 8 Sept · 19 days left
Supplies of work clothing and underwear for JSW S.A. mines with a 12-month implementation period from the date of contract conclusion.
Deadline 9 Sept · 20 days left
Supply and installation of two new jaw crushers OM–20 L3E and OM–20 P3E at the Coal Mechanical Processing Plant in JSW S.A. KWK "Knurów-Szczygłowice" Knurów Mine
Deadline 10 Sept · 21 days left
Supplies for JSW S.A. mines of electric detonators, explosive materials and detonating cord with a 12-month implementation period from the date of conclusion of the contract.
Deadline 10 Sept · 21 days left
Periodic inspection of WPK 3.9 main ventilation fans types W-1, W-2 and W-3 at shaft Vz for KWK "Borynia-Zofiówka" Ruch "Zofiówka" together with work related to the repair of isolation gates, reversing flaps and airlock doors
Deadline 11 Sept · 22 days left
Maintenance and cleaning of sump tanks and settlement tanks of pit water from accumulated material at JSW S.A. KWK "Borynia – Zofiówka"
Deadline 15 Sept · 26 days left
Supply of two-component adhesives for rock mass consolidation and strengthening to JSW S.A. mines with an implementation period of 12 months from the contract conclusion date.
Deadline 17 Sept · 28 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
2024870
2025573
2026179
Who has won here before
| Company | Awards | Period |
|---|---|---|
| GRENEVIA S.A. | 35 | 2024–2026 |
| MAS Sp. z o.o. | 18 | 2024–2026 |
| LINTER S.A. | 14 | 2024–2026 |
| PMT POLSKA Sp. z o.o. | 13 | 2024–2025 |
| Joy Global (Poland) Sp. z o.o. | 10 | 2024–2026 |
| Minova Ekochem Sp. z o.o. | 9 | 2024–2026 |
| Centrala Zbytu Węgla WĘGLOZBYT S.A. | 9 | 2024–2026 |
| Matix Sp. z o.o. | 8 | 2024–2026 |
| Przedsiębiorstwo Wielobranżowe DREMEX Sp. z o.o. | 8 | 2024–2026 |
| Huta Łabędy S.A. | 8 | 2024–2026 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.