ADIF -Consejo de Administración
Spanien · 9 offene Verfahren · 1.165 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Maintenance services for traffic control facilities and complementary systems on the Madrid-Barcelona-Figueres high-speed line. Section: Lleida-Barcelona Sants-Figueres.
42.819.266 €Frist 4. Sept. · noch 16 Tage
Supply and commissioning of remote units and protocol converters for electrification installations. Two lots
13.782.113 €Frist 7. Sept. · noch 19 Tage
Execution of works for the project of construction of security installations affected by duplication of track between La Encina and L'Alcúdia de Crespins, and expansion of the track yard at L'Alcúdia de Crespins station.
17.892.605 €Frist 11. Sept. · noch 23 Tage
Supply of ballast with delivery through Adif warehouses (northern zone). 6 lots
6.409.440 €Frist 14. Sept. · noch 26 Tage
Services for the drafting of renovation projects for infrastructure, roads and electrification of the Miranda de Ebro-Orduña sections (Line 700) and Pamplona-Altsasu (Line 710).
7.192.629 €Frist 22. Sept. · noch 34 Tage
Execution of works for the construction projects of platform extension, and improvement of accessibility, evacuation and ventilation in case of fire at the underground stations of Laguna and Embajadores (Phase II) and treatment of the platform between km 1+300 and 3+000. Line L920. Atocha-Móstoles tunnel section. Line C5 of Madrid Commuter Rail Network
44.294.455 €Frist 24. Sept. · noch 36 Tage
Execution of works and performance of maintenance of the remote control energy construction project for the Ronda-Algeciras section of the Bobadilla-Algeciras line
8.797.968 €Frist 25. Sept. · noch 37 Tage
Maintenance services, operation of GSM-R core network and systems renewal, telecommunications management and remote control of HV power and GSM-R mobile telecommunications facilities, fixed, VCA, operators' infrastructure and remote control of HV power for the following lines: Madrid–Valladolid, Madrid–Barcelona–French Border, Madrid–Valencia, Madrid–Seville and Córdoba–Málaga
145.014.655 €Frist 2. Okt. · noch 44 Tage
Service for control and elimination of vegetation on high-speed lines managed by the high-speed operations sub-directorate
6.795.800 €Frist 9. Okt. · noch 51 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
20201
2023220
2024278
2025306
2026249
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| ArcelorMittal España, S.A. | 73 | 2021–2026 |
| UTE Miv 2021 Lote 1 · Madrid | 57 | 2021–2025 |
| UTE MANTENIMIENTO ENERGIA NORTE · MADRID | 47 | 2020–2024 |
| UTE Miv Sur Lote 6 · Sevilla | 47 | 2021–2025 |
| UTE MANTENIMIENTO NOROESTE LOTE 2 · ALCOBENDAS | 41 | 2020–2024 |
| UTE Miv Centro 2021-2022 · Madrid | 38 | 2023–2025 |
| UTE Mantenimiento Noreste · Zaragoza | 32 | 2021–2025 |
| UTE Miv Este Lote 4 · Sevilla | 28 | 2021–2025 |
| UTE Lote 2 Norte · Bilbao | 24 | 2021–2025 |
| ENCLAVAMIENTOS Y SEÑALIZACION FERROVIARIA ENYSE SAU | 24 | 2019–2026 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →