ADIF -Consejo de Administración
Spain · 9 open tenders · 1,165 documented awards
Current tenders
Maintenance services for traffic control facilities and complementary systems on the Madrid-Barcelona-Figueres high-speed line. Section: Lleida-Barcelona Sants-Figueres.
42.819.266 €Deadline 4 Sept · 15 days left
Supply and commissioning of remote units and protocol converters for electrification installations. Two lots
13.782.113 €Deadline 7 Sept · 18 days left
Execution of works for the project of construction of security installations affected by duplication of track between La Encina and L'Alcúdia de Crespins, and expansion of the track yard at L'Alcúdia de Crespins station.
17.892.605 €Deadline 11 Sept · 22 days left
Supply of ballast with delivery through Adif warehouses (northern zone). 6 lots
6.409.440 €Deadline 14 Sept · 25 days left
Services for the drafting of renovation projects for infrastructure, roads and electrification of the Miranda de Ebro-Orduña sections (Line 700) and Pamplona-Altsasu (Line 710).
7.192.629 €Deadline 22 Sept · 33 days left
Execution of works for the construction projects of platform extension, and improvement of accessibility, evacuation and ventilation in case of fire at the underground stations of Laguna and Embajadores (Phase II) and treatment of the platform between km 1+300 and 3+000. Line L920. Atocha-Móstoles tunnel section. Line C5 of Madrid Commuter Rail Network
44.294.455 €Deadline 24 Sept · 35 days left
Execution of works and performance of maintenance of the remote control energy construction project for the Ronda-Algeciras section of the Bobadilla-Algeciras line
8.797.968 €Deadline 25 Sept · 36 days left
Maintenance services, operation of GSM-R core network and systems renewal, telecommunications management and remote control of HV power and GSM-R mobile telecommunications facilities, fixed, VCA, operators' infrastructure and remote control of HV power for the following lines: Madrid–Valladolid, Madrid–Barcelona–French Border, Madrid–Valencia, Madrid–Seville and Córdoba–Málaga
145.014.655 €Deadline 2 Oct · 43 days left
Service for control and elimination of vegetation on high-speed lines managed by the high-speed operations sub-directorate
6.795.800 €Deadline 9 Oct · 50 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
20201
2023220
2024278
2025306
2026249
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ArcelorMittal España, S.A. | 73 | 2021–2026 |
| UTE Miv 2021 Lote 1 · Madrid | 57 | 2021–2025 |
| UTE MANTENIMIENTO ENERGIA NORTE · MADRID | 47 | 2020–2024 |
| UTE Miv Sur Lote 6 · Sevilla | 47 | 2021–2025 |
| UTE MANTENIMIENTO NOROESTE LOTE 2 · ALCOBENDAS | 41 | 2020–2024 |
| UTE Miv Centro 2021-2022 · Madrid | 38 | 2023–2025 |
| UTE Mantenimiento Noreste · Zaragoza | 32 | 2021–2025 |
| UTE Miv Este Lote 4 · Sevilla | 28 | 2021–2025 |
| UTE Lote 2 Norte · Bilbao | 24 | 2021–2025 |
| ENCLAVAMIENTOS Y SEÑALIZACION FERROVIARIA ENYSE SAU | 24 | 2019–2026 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.