PGE Dystrybucja S.A.
Polen · 13 offene Verfahren · 197 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Tree, shrub, undergrowth and branch felling service and restoration of the technological corridor near selected active high-voltage and medium-voltage power lines in the area of the Białystok Branch and Warsaw Branch of PGE Dystrybucja S.A. divided into 67 lots
Frist 21. Aug. · noch 1 Tage
Service of reading measurement and settlement devices installed at customers qualified for tariff groups C1xx and Gxxx divided into 12 parts.
Frist 21. Aug. · noch 1 Tage
Expansion of matrix infrastructure for OT environments (SZUMIT and CSORB) for PGE Dystrybucja S.A.
Frist 21. Aug. · noch 1 Tage
Performance of tree, shrub, undergrowth and branch cutting service and restoration of the technological strip near active medium and high voltage power lines in the area of operation of PGE Dystrybucja S.A. Branch Rzeszów, Branch Lublin and Branch Zamość.
Frist 21. Aug. · noch 1 Tage
Performance of tree, shrub, undergrowth and branch cutting service and restoration of the technological corridor near active high and medium voltage power lines in the area of operation of PGE Dystrybucja S.A. Łódź Branch and Skarżysko-Kamienna Branch divided into 74 parts
Frist 21. Aug. · noch 1 Tage
Execution of tree, shrub, undergrowth and branch cutting service and restoration of the technological corridor near active medium-voltage and high-voltage power lines in the operational area of PGE Dystrybucja S.A. Rzeszów Branch, Lublin Branch and Zamość Branch.
Frist 28. Aug. · noch 8 Tage
Expansion of matrix infrastructure for OT environments (SZUMIT and CSORB) for PGE Dystrybucja S.A.
Frist 28. Aug. · noch 8 Tage
Execution of tree, shrub, undergrowth and branch cutting service and restoration of the technological corridor near active high and medium voltage power lines in the operational area of PGE Dystrybucja S.A. Łódź Branch and Skarżysko-Kamienna Branch divided into 74 parts
Frist 28. Aug. · noch 8 Tage
Supply of off-road Pick-up vehicles with custom bodywork for the needs of the Energy Emergency Service of PGE Dystrybucja S.A. branches in 2027 divided into 7 parts / tasks.
Frist 2. Sept. · noch 13 Tage
Supply of 85 units of automatic voltage regulators 400/230V with rated power 100kVA together with network voltage monitors and 44 units of portable local monitor of measurement and configuration parameters for PGE Dystrybucja S.A. divided into 7 parts
Frist 8. Sept. · noch 19 Tage
Conversion of overhead power lines to underground cable lines MV and LV in Oleśnica, Oleśnica municipality – RE Busko (PK30%)
Frist 16. Sept. · noch 27 Tage
Supply in 2026 of utility vehicles type UTV together with trailers for the needs of PGE Dystrybucja S.A. branches
Frist 17. Sept. · noch 28 Tage
Reconstruction of the overhead medium voltage power network into a cable network on the Stopnica – Szydłów route, stage II (from pole no. 48 to pole 89) in the area of Stopnica and Tuczępy municipalities – RE Busko (PK30%)
Frist 22. Sept. · noch 33 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
20222
20233
2024174
2025296
2026206
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| Sygnity S.A. | 9 | 2021–2026 |
| ENERGO ZET Sp. z o.o. | 8 | 2024–2026 |
| Fabryka Transformatorów w Żychlinie Sp. z o.o. | 7 | 2015–2026 |
| Chmielecka Agata - AGATBUD | 6 | 2024–2025 |
| SOEN Sp. z o.o. | 6 | 2025 |
| Innsoft Sp. z o.o. | 6 | 2023–2026 |
| Maciej Osieleniec Zakład Zadrzewień Zieleni i Rekultywacji ABIES | 6 | 2024–2026 |
| NMG S.A. | 5 | 2022–2025 |
| GAMUZA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 5 | 2024–2025 |
| Najmilsza Sp. z o.o. | 5 | 2024–2025 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →