Państwowe Gospodarstwo Wodne Wody Polskie
Polen · 48 offene Verfahren · 4.063 dokumentierte Zuschläge
Aktuelle Ausschreibungen
"Reconstruction of the Motława River flood embankments in Gdańsk from km 4+850 to 7+510"
12.818.140 €Frist 19. Aug. · heute
Post-flood reconstruction of the Miedzianka and Witka watercourses – Part I Miedzianka river and Part II Witka river
Frist 19. Aug. · heute
Purchase of navigation signs for the Water Management Board in Opole
178.670 €Frist 20. Aug. · noch 1 Tage
Flood protection of the Dusznicka Bystrzyca and Kamienny Potok river valleys: Duszniki-Zdrój, Szczytna on the Dusznicka Bystrzyca River
Frist 20. Aug. · noch 1 Tage
Lease of multifunctional devices for RZGW units in Gdańsk for 2026-2029
Frist 20. Aug. · noch 1 Tage
Supply of heating oil for organizational units of the State Water Management Authority Polish Waters divided into parts
Frist 20. Aug. · noch 1 Tage
Supply of office and stationery materials and printing paper for the needs of the State Water Management Enterprise Wody Polskie Regional Water Management Board in Rzeszów
Frist 21. Aug. · noch 2 Tage
Development of a water law report for the Kraków City Drainage Barrier
Frist 21. Aug. · noch 2 Tage
Kłodawa River – bank reinforcement over a length of 4.9 km; Pruszcz Gdański municipality, Gdańsk district, Pomeranian Voivodeship
9.756.098 €Frist 24. Aug. · noch 5 Tage
Reconstruction of flood protection embankments of the Raduni, Kłodawa, Bielawa rivers (Gdańsk city, Pruszcz Gdański city, Pruszcz Gdański municipality, Suchy Dąb municipality, Pszczółki municipality, Gdańsk district)
27.476.848 €Frist 24. Aug. · noch 5 Tage
Maintenance services for floating units belonging to RZGW Szczecin
Frist 24. Aug. · noch 5 Tage
Preparation of water rights documents together with water management instruction for facilities within ZZ Inowrocław
Frist 24. Aug. · noch 5 Tage
"Reconstruction of flood embankments of the Motława River in the area of Gdańsk city from km 4+850 to 7+510"
12.818.140 €Frist 24. Aug. · noch 5 Tage
Supply of cleaning agents and household chemicals for RZGW Gliwice
Frist 25. Aug. · noch 6 Tage
Repair of inlet no. 8 to the Łączany Skawina channel according to technical documentation
UNTERSCHWELLIGFrist 25. Aug. · noch 6 Tage
Flood protection of the Bystrzyca Dusznicka and Kamienny Potok river valleys: Duszniki – Zdrój, Szczytna on the Bystrzyca Dusznicka river
Frist 27. Aug. · noch 8 Tage
Purchase of navigation marking within the area of RZGW Wrocław
Frist 27. Aug. · noch 8 Tage
Repair of shaft 9 L in Cieszów
UNTERSCHWELLIGFrist 27. Aug. · noch 8 Tage
Removal of beaver dams and blockages, overturned trees from channels, trees threatening safety ZZ Zgorzelec, divided into parts Part I Water Supervision in Zgorzelec Part II Water Supervision Lubsko
Frist 28. Aug. · noch 9 Tage
Provision of services for the reservation, purchase and delivery of air, rail and coach tickets for foreign and domestic passenger transport, intermediation in the process of obtaining visas for the State Water Management Authority Wody Polskie, in connection with domestic and foreign business trips.
1.187.001 €Frist 28. Aug. · noch 9 Tage
Supply and implementation of a payroll and personnel management system for the State Water Management Authority Water Poland
25.990.239 €Frist 28. Aug. · noch 9 Tage
Filling of ravines and repair of existing protections on the Czerwonka stream on the territory of Kozy and Wilamowice municipalities
UNTERSCHWELLIGFrist 28. Aug. · noch 9 Tage
Renovation of office premises in the building of the Water Authority headquarters in Słupsk
UNTERSCHWELLIGFrist 28. Aug. · noch 9 Tage
Construction of the left embankment of the Biała River at km 6+600-8+345 of the river in Koszyce, Tarnów – stage III construction works
Frist 31. Aug. · noch 12 Tage
Carrying out periodic technical inspections of hydrotechnical structures in the area of RZGW Warsaw divided into parts
111.420 €Frist 31. Aug. · noch 12 Tage
Supply of tools and power tools with accessories for the organizational units of RZGW in Krakow
Frist 31. Aug. · noch 12 Tage
Supply related to the maintenance of waterways within the scope of RZGW in Gdańsk divided into lots
677.566 €Frist 31. Aug. · noch 12 Tage
Obtaining an environmental decision for task 1B.2 Stage I and Stage II Modernization works on the Border Oder Activity 1: carrying out natural inventory and developing an EIA report.
Frist 31. Aug. · noch 12 Tage
Periodic inspection of the technical condition and suitability for use of selected hydrotechnical structures of the Catchment Management Board in Stargard.
Frist 1. Sept. · noch 13 Tage
Tree and shrub cutting on the ZZ Inowrocław premises
UNTERSCHWELLIGFrist 1. Sept. · noch 13 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
2021520
2022710
2023416
20241.802
20252.233
20261.231
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| DREW-KOS Sp. Z o.o. | 58 | 2024–2026 |
| METALZBYT-HURT SP. Z O.O. | 45 | 2021–2026 |
| ATRA Sp. z o.o. | 44 | 2022–2026 |
| Hydrowodkan Sp. z o.o. | 37 | 2021–2026 |
| Zakład Produkcyjno-Handlowy Zbigniew Furmanik | 31 | 2022–2026 |
| PBM Sułkowscy Sp. J. | 31 | 2021–2025 |
| PBW INŻYNIERIA Sp. z o. o. | 30 | 2021–2026 |
| Przedsiębiorstwo Inżynieryjne "PEKUM" Sp. z o.o. | 25 | 2021–2023 |
| HYDROAGROMEL Bartosz Małolepszy | 24 | 2022–2026 |
| Grzegorz Wojarski Firma Handlowo-Usługowa | 23 | 2025–2026 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →