Hrvatske ceste d.o.o.
Kroatien · 12 offene Verfahren · 105 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Preparation of concept designs with location permit outcome for Saborsko-Rakovicu, length approx. 12.5 km
270.000 €Frist 25. Aug. · noch 5 Tage
Preparation of conceptual designs with the issuance of a location permit for Saborsko-Rakovicu, length approximately 12.5 km
270.000 €Frist 25. Aug. · noch 5 Tage
Construction of DC12: Vrbovec 2 Junction (D10) - Bjelovar - Virovitica - G.P. Terezino Polje (Gr.R. Hun.), section Bjelovar - Virovitica - G.P. Terezino Polje (Gr.R. Hun.), length 60 km, Stages 1C and 2A, L=11.37 km
61.540.000 €Frist 2. Sept. · noch 13 Tage
Construction of DC12: Vrbovec 2 Junction (D10) - Bjelovar - Virovitica - G.P.Terezino Polje (Gr.R.Hung.), section Bjelovar - Virovitica - G.P. Terezino Polje (Gr.R.Hung.), length 60 km, Stages 1C and 2A, L=11.37 km
61.540.000 €Frist 2. Sept. · noch 13 Tage
Reconstruction of state road DC117, section: Junction for Rukavac-Vis, length approx. 4.9 km
6.200.000 €Frist 3. Sept. · noch 14 Tage
Preparation of main projects with building permit outcome and implementation projects for a bridge over the Sava River on the route of the connecting road (axis 1) from DC232 to DC224 in Kratečko starting at station 0+000.00 to station approximately 0+895.00
300.000 €Frist 4. Sept. · noch 15 Tage
Preparation of main projects with building permit outcome and implementation projects for a bridge over the Sava River on the route of the connecting road (axis 1) from DC232 to DC224 in Kratečko with beginning at station 0+000.00 to station approximately 0+895.00
300.000 €Frist 4. Sept. · noch 15 Tage
Reconstruction of State Road DC 56, Section 004, Phase I, Station from km 0+000 to km 8+100, Section Drniš-Ružić
7.500.000 €Frist 8. Sept. · noch 19 Tage
Construction of DC8, section TTTS - Dugi Rat with connecting roads, Phase 2: from TTTS junction including Stara Podstrana junction with access roads
149.800.000 €Frist 9. Sept. · noch 20 Tage
Construction of DC8, section TTTS - Dugi Rat with connecting roads, Phase 2: from the TTTS junction including Stara Podstrana junction with access roads
149.800.000 €Frist 9. Sept. · noch 20 Tage
Construction of Njivice I and Njivice II junctions on state road D8 in Šibenik
20.000.000 €Frist 15. Sept. · noch 26 Tage
Construction of Njivice I and Njivice II Interchanges on State Road D8 in Šibenik
20.000.000 €Frist 15. Sept. · noch 26 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
2024158
2025209
2026144
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| GEOPROJEKT, d.d. | 7 | 2024–2026 |
| INSTITUT IGH, d.d. | 7 | 2025–2026 |
| COMBIS d.o.o. | 5 | 2024–2025 |
| KING ICT d.o.o. | 4 | 2024–2025 |
| EPTISA ADRIA d.o.o. | 4 | 2024–2025 |
| EPTISA SERVICIOS DE INGENIERIA s.l. | 4 | 2024–2025 |
| AUTO HRVATSKA AUTOMOBILI D.O.O. | 4 | 2025–2026 |
| PAG 91 d.o.o. | 4 | 2024 |
| Pismorad d.o.o. | 3 | 2025 |
| COLAS Hrvatska d.d. | 3 | 2024–2025 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →