Generalna Dyrekcja Dróg Krajowych i Autostrad
Polen · 34 offene Verfahren · 536 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Service and repairs of official vehicles at the disposal of the General Directorate of National Roads and Motorways Branch in Warsaw together with tire replacement and wheel balancing service divided into 3 parts
Frist 21. Aug. · noch 1 Tage
Construction of a road junction at the intersection of national road DK81 with provincial road DW944 – Bielska Street in Skoczów.
Frist 25. Aug. · noch 5 Tage
Construction project together with materials to obtain ZRID decision, executive project and tender materials for the task: "Expansion of Kowale Junction on the S6 expressway route"
Frist 25. Aug. · noch 5 Tage
Construction of sidewalks and bus bays on DK35 divided into tasks:
Task 1: Szczepanów
Task 2: Wojnarowice
UNTERSCHWELLIGFrist 26. Aug. · noch 6 Tage
Supervision of the design and construction of Works and Contract management for: "Design and construction of expressway No. S11 Szczecinek – Piła, section I Turowo – Podgaje junction (with junction)", "Design and construction of expressway No. S11 Szczecinek – Piła, section II Podgaje (without junction) – Jastrowie junction (with junction)".
Frist 27. Aug. · noch 7 Tage
Design and construction of Limanowa bypass on national road DK 28
Frist 27. Aug. · noch 7 Tage
Successive supplies together with distribution of high-methane natural gas (group E) for the needs of the General Directorate of National Roads and Motorways Branch in Warsaw
Frist 27. Aug. · noch 7 Tage
Project and construction of the S12 expressway, section junction Wieniawa (without junction) - junction Radom South (with junction)
Frist 28. Aug. · noch 8 Tage
Performance of basic, extended and detailed inspections of road engineering structures on national roads administered by the General Directorate of National Roads and Motorways Branch in Wrocław in 2026 divided into 11 tasks.
Frist 28. Aug. · noch 8 Tage
Design and construction of the Limanowa bypass on the DK 28 route
Frist 31. Aug. · noch 11 Tage
Supervision of the design and execution of Works and Contract management for: "Design and construction of S17 expressway Piaski – Hrebenne, construction section no. 5: junction "Zamość Sitaniec" without junction - junction "Zamość Wschód" without junction".
Frist 31. Aug. · noch 11 Tage
Supervision of the design and execution of Works and Contract management for: "Design and construction of expressway S17 Piaski – Hrebenne, construction section no. 5: junction "Zamość Sitaniec" without junction - junction "Zamość Wschód" without junction".
Frist 31. Aug. · noch 11 Tage
Geodetic divisions for the purpose of delineating road sections to be transferred to other road administrators. Stage 1 – division of plots for ZZDW in Koszalin.
Frist 1. Sept. · noch 12 Tage
Regulation of legal statuses of roads within the territory of the General Directorate of National Roads and Motorways Branch in Warsaw aimed, among others, at transferring surplus road sections and real properties by the General Director of National Roads and Motorways to appropriate public administration bodies, in accordance with applicable legal provisions, divided into 5 Tasks.
Frist 2. Sept. · noch 13 Tage
Supervision of investor functions for the task titled "Design and construction of distributed modules constituting components of the National Road Traffic Management System on expressway S17 divided into three parts" - implemented in division into two parts of the order
Frist 2. Sept. · noch 13 Tage
Supervision of the performance of Works and Contract management for "Construction of a road junction in Jawornik in the route of DK7"
Frist 4. Sept. · noch 15 Tage
Execution of geological works including the preparation of geological and engineering documentation for the project "Construction of expressway S12 on the section Piotrków Trybunalski (A1) – Kozenin junction (without junction, to km approx. 33+845)"
Frist 7. Sept. · noch 18 Tage
Design, construction and reconstruction of national road no. 60 on the section Gostynin-Płock divided into two sections: Section 1. Design, construction and reconstruction of national road no. 60 on the section Gostynin-Płock from km approx. 52+357 to km approx. 55+737 and from km approx. 59+011 to km approx. 61+900; Section 2. Design and construction of the Łącko bypass.
Frist 7. Sept. · noch 18 Tage
Year-round (current and winter) maintenance of expressway S5 section node Bydgoszcz North (without node) – node Mieleszyn (without node) from km 47+720 to km 130+894 and expressway S10e section node Bydgoszcz Błonie (with node) – node Bydgoszcz South (with node) from km 0+000 to km 8+704 managed by GDDKiA Branch in Bydgoszcz District in Bydgoszcz, together with all its elements
Frist 7. Sept. · noch 18 Tage
Performance of the function of verifier of project documentation and supervision inspector in the implementation of the task: Design and implementation of liquidation of Toll Collection Points located along the Opole section of the A4 motorway along with restoration of the road to standards appropriate for its class.
Frist 8. Sept. · noch 19 Tage
EXPANSION OF EXPRESS ROAD S1 SECTION MYSŁOWICE – LĘDZINY (LEFT AND RIGHT LANES)
Frist 9. Sept. · noch 20 Tage
Maintenance of traffic lights, active signs and lighting on national roads in the Kluczborsk Region of the Opole Branch of GDDKiA
Frist 10. Sept. · noch 21 Tage
Execution of geological works and preparation of geological and engineering documentation for the task "Construction of express road S12 on the section Piotrków Trybunalski (A1) – Kozenin junction (without junction, to km approx. 33+845)"
Frist 11. Sept. · noch 22 Tage
Project and construction of expressway S19 on the section border of Podlaskie Voivodeship – Łosice – border of Lubelskie Voivodeship, construction section no. 2: "Łosice" junction (with junction) – border of Lubelskie Voivodeship
Frist 15. Sept. · noch 26 Tage
Repair of motorway A1 section Pyrzowice-Piekary Śląskie – Task 1: from km 474+349 to km 476+050
Frist 15. Sept. · noch 26 Tage
Project and construction of expressway S19 section border of Podlaskie Voivodeship – Łosice – border of Lublin Voivodeship, construction section no. 1 border of Podlaskie Voivodeship - Łosice junction (without junction)
Frist 15. Sept. · noch 26 Tage
Cleaning services for rooms in buildings of the Kalisz District, Road Department in Kalisz and Road Department in Pleszew.
Frist 15. Sept. · noch 26 Tage
Construction of Lędzin bypass on national road no. 46
Frist 17. Sept. · noch 28 Tage
Delineation and stabilization of road corridor boundaries on selected sections of national roads in the Małopolskie Voivodeship divided into 4 parts
Frist 18. Sept. · noch 29 Tage
Cleaning of rooms, external areas and maintenance services provided in the period from 01.01.2027 to 31.12.2027 in GDDKiA Opole Branch facilities located in the Opole Voivodeship, divided into 5 parts
Frist 21. Sept. · noch 32 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
202144
202276
202370
2024770
2025877
2026602
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| Budimex S.A. | 16 | 2023–2025 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| ZABERD Sp. z o.o. | 14 | 2024–2026 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
| FBSerwis S.A. | 9 | 2024–2026 |
| PORR S.A. | 9 | 2023–2025 |
| ROTOMAT SP. Z O.O. | 8 | 2022–2025 |
| SPIE Stangl Technik sp. z o.o. | 8 | 2021–2025 |
| Ewimap Sp. z o.o. | 8 | 2024 |
| MIRBUD S.A. | 8 | 2024–2026 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →