Friedrich & ClementBETA

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Rumänien · 38 laufende Ausschreibungen · 2.989 dokumentierte Zuschläge

Aktuelle Ausschreibungen

Equipment rental services for the Production section - Spraying equipment necessary for priming - Framework agreement 2 years - RELAUNCH
1.200.000 RONFrist 7. Okt. ·
DESIGN AND EXECUTION LOT 1: Bridge on DN 6 km 268+371 at Arginesti LOT 2: Modernization Bridge on DN 15 km 304+680 at Viisoara
127.939.019 RONFrist 7. Okt. ·
Purchase and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONFrist 7. Okt. ·
PICKUP COMMERCIAL VEHICLE, full hybrid (N1)
7.648.350 RONFrist 7. Okt. ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Motorway, km 0+000 – km 100+900, Northern Ring sector km 0+000 - 52+770 (Provision of all traffic relations at the road junction on DN7 (km 9+400) with Motorway A0)
41.037.682 RONFrist 8. Okt. ·
Framework Agreement 48 months – Technical inspection services for main cable, suspenders and metal deck, Suspension Bridge
2.502.000 RONFrist 9. Okt. ·
Framework agreement 48 months – Technical inspection services for main cable, suspenders and steel deck, Suspended bridge
2.502.000 RONFrist 9. Okt. ·
Additives for asphalt mixtures: adhesivity additive for road bitumen, additive for reducing the operating temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
Frist 12. Okt. ·
Design and execution "Pantelimon Road Junction (A0 - km 48) A0 North sector"
162.816.653 RONFrist 12. Okt. ·
Additives for asphalt mixtures: adhesion additive for road bitumen, additive to reduce the laying temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
2.850.000 RONFrist 12. Okt. ·
Supervision Services Design and Execution "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening at 4 lanes and km 51+041 – km 109+905 road at 2 lanes, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 road at 2 lanes"
20.269.000 RONFrist 12. Okt. ·
Supervision Services "Execution of Arad – Oradea Lot 1 Express Road Works"
18.874.800 RONFrist 12. Okt. ·
Design and Execution "Pantelimon Road Junction (A0 - km 48) A0 North Sector"
162.816.653 RONFrist 12. Okt. ·
DESIGN AND EXECUTION “Autostrada Craiova – Filiasi and Drum Express Filiasi – Targu Jiu – Lot 4”
2.485.975.080 RONFrist 12. Okt. ·
Bright Ensemble to Increase Driving Safety on Dangerous Sectors
74.811.664 RONFrist 12. Okt. ·
Repair and arrangement of lay-by on Highway A2 km 162+620, including earthworks, systems for collecting and evacuating water from the area adjacent to Highway A2 – DRDP Constanta
UNTERSCHWELLIGFrist 13. Okt. ·
Design and Execution Road Node A1 (km 326+155) – DJ 704 (Cugir)
149.112.769 RONFrist 13. Okt. ·
Supervision Services "Design and Execution Motorway Târgu Mureș-Târgu Neamț Section II: Miercurea Nirajului-Leghin, Lot 2C: Pipirig-Vânători Neamț (Leghin)"
70.913.357 RONFrist 15. Okt. ·
Maintenance services, inspection/diagnostics, adjustments and repairs, including supply of spare parts and operating materials for UNIMOG-type vehicle equipment
6.498.155 RONFrist 16. Okt. ·
Framework agreement, for a period of 24 months, having as object: ‘Repair and replacement of expansion joints covering devices at bridges, passages, viaducts within the radius of DRDP Bucharest, lot 1-7’
UNTERSCHWELLIGFrist 19. Okt. ·
Maintenance and repair services for DACIA vehicles equipped with C.N.A.I.R. S.A. - Central
UNTERSCHWELLIGFrist 19. Okt. ·
Supervision Services "Widening to 4 lanes of the ring road of Bucharest Municipality South between A1 (km 55+520) and DN 5 (km 40+000) – LOT II Widening to 4 lanes of the ring road of Bucharest Municipality South between km 54+700 and DN 5 (km 40+000)"
17.673.600 RONFrist 19. Okt. ·
Supervision Services "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes"
15.472.723 RONFrist 19. Okt. ·
Services for preparing cadastral documentation and evaluation reports for the acquisition by the Romanian State, through expropriation/transfer, as applicable, of the properties necessary for the execution of the work "Bypass Road of Botosani Municipality"
1.375.625 RONFrist 20. Okt. ·
Procurement and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONFrist 21. Okt. ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Road, km 0+000 – km 100+900, North Ring Sector km 0+000 - 52+770 (Ensuring all traffic relations at the road junction on DN7 (km 9+400) with Highway A0)
41.037.682 RONFrist 22. Okt. ·
‘Implementation of works for the objective: ‘Strengthening and restoring the road on DN 73D adjacent to km 46+200’
47.610.842 RONFrist 22. Okt. ·
Execution of works for the objective: "Consolidation and reconstruction of road on DN 73D adjacent km 46+200"
47.610.842 RONFrist 22. Okt. ·
Framework agreement 4 years - Periodic maintenance works - Very thin cold bituminous layers, Year I - Year IV - DRDP Buzau - Lot SDN Braila
Frist 30. Okt. ·
Framework agreement - Purchase of additives for the production of stable asphalt mixture and stabilized asphalt mixture - (24 months)
Frist 2. Nov. ·

Einkaufsrhythmus

Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.

20186
20197
20204
2021252
2022529
2023559
20242.241
20251.387
20261.036

Clement Was die Zahlen über diesen Auftraggeber sagen

  • 56 % der Zuschläge dieses Auftraggebers gingen an Unternehmen, die hier schon einmal gewonnen hatten (4.145 Zuschläge seit 2018, verteilt auf 652 Unternehmen). Das ist deutlich weniger als im Land üblich (76 %) — dieser Auftraggeber wechselt seine Lieferanten öfter als andere.n = 4.145 Zuschläge seit 2018
  • Im Median lagen 3 Angebote je Verfahren auf dem Tisch (3.037 Verfahren mit Bieterzahl); bei 21 % blieb es bei einem einzigen Bieter. Land: 5,3 Angebote im Median.n = 3.037
  • Der Zuschlag lag im Median bei 92 % des geschätzten Auftragswerts (66 Zuschläge mit Schätzung und Wert) — wer an der Schätzung kalkuliert, liegt hier meist zu hoch. Land: 82 %.n = 66
  • 9 % der eingegangenen Angebote kamen aus anderen Ländern (1.913 Verfahren mit Bietermix) — nicht nur die Gewinner, alle Bieter. Land: 2 %.n = 1.913
  • 84 % der eingegangenen Angebote kamen von kleinen und mittleren Unternehmen (1.913 Verfahren mit Bietermix). Land: 68 %.n = 1.913
  • 6 % der Zuschläge gingen an Unternehmen aus dem Ausland (4.145 Zuschläge mit bekanntem Gewinnerland). Landesschnitt: 1 %.n = 4.145
  • In 90 Verfahren mit strukturierten Eignungskriterien verlangte dieser Auftraggeber am häufigsten: Anteil an Unterauftragnehmern (90 von 90), Eintragung im Handelsregister (90 von 90), Unabhängiges Qualitätszertifikat (z. B. ISO 9001) (74 von 90), Mindestjahresumsatz (67 von 90).n = 90

Aus den dokumentierten Zuschlägen dieses Auftraggebers; Vergleichswerte aus derselben Branche und demselben Land. Keine Prognose, keine Rechtsberatung. Stand 06.10.2026.

Erwartete nächste Vergaben

Aus dem Rhythmus der bisherigen Zuschläge je Branche — eine Erwartung, keine Ankündigung. Bisherige Trefferquote: 26 % der 11.200 abgelaufenen Erwartungsfenster brachten eine Bekanntmachung.

Wer hier bisher gewonnen hat

UnternehmenZuschlägeZeitraum
LOIAL IMPEX812024–2026
OYL COMPANY HOLDING AG S.R.L.702024–2026
VESTA INVESTMENT662024–2026
SC EDIL CONTRACT SRL652024–2026
TRANSPOL SERVICE602024–2026
GAMIDA EUROMARK482025–2026
DUMAVA SEMNALIZARE422024–2026
PORR CONSTRUCT412024–2026
RAD-TRANS392024–2026
GIROD Semnalizare Rutiera382024–2026

Aus 18,0 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.

Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Jetzt registrieren →