COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Rumänien · 38 laufende Ausschreibungen · 2.989 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Equipment rental services for the Production section - Spraying equipment necessary for priming - Framework agreement 2 years - RELAUNCH
1.200.000 RONFrist 7. Okt. ·
DESIGN AND EXECUTION LOT 1: Bridge on DN 6 km 268+371 at Arginesti LOT 2: Modernization Bridge on DN 15 km 304+680 at Viisoara
127.939.019 RONFrist 7. Okt. ·
Purchase and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONFrist 7. Okt. ·
PICKUP COMMERCIAL VEHICLE, full hybrid (N1)
7.648.350 RONFrist 7. Okt. ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Motorway, km 0+000 – km 100+900, Northern Ring sector km 0+000 - 52+770 (Provision of all traffic relations at the road junction on DN7 (km 9+400) with Motorway A0)
41.037.682 RONFrist 8. Okt. ·
Framework Agreement 48 months – Technical inspection services for main cable, suspenders and metal deck, Suspension Bridge
2.502.000 RONFrist 9. Okt. ·
Framework agreement 48 months – Technical inspection services for main cable, suspenders and steel deck, Suspended bridge
2.502.000 RONFrist 9. Okt. ·
Additives for asphalt mixtures: adhesivity additive for road bitumen, additive for reducing the operating temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
Frist 12. Okt. ·
Design and execution "Pantelimon Road Junction (A0 - km 48) A0 North sector"
162.816.653 RONFrist 12. Okt. ·
Additives for asphalt mixtures: adhesion additive for road bitumen, additive to reduce the laying temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
2.850.000 RONFrist 12. Okt. ·
Supervision Services Design and Execution "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening at 4 lanes and km 51+041 – km 109+905 road at 2 lanes, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 road at 2 lanes"
20.269.000 RONFrist 12. Okt. ·
Supervision Services "Execution of Arad – Oradea Lot 1 Express Road Works"
18.874.800 RONFrist 12. Okt. ·
Design and Execution "Pantelimon Road Junction (A0 - km 48) A0 North Sector"
162.816.653 RONFrist 12. Okt. ·
DESIGN AND EXECUTION “Autostrada Craiova – Filiasi and Drum Express Filiasi – Targu Jiu – Lot 4”
2.485.975.080 RONFrist 12. Okt. ·
Bright Ensemble to Increase Driving Safety on Dangerous Sectors
74.811.664 RONFrist 12. Okt. ·
Repair and arrangement of lay-by on Highway A2 km 162+620, including earthworks, systems for collecting and evacuating water from the area adjacent to Highway A2 – DRDP Constanta
UNTERSCHWELLIGFrist 13. Okt. ·
Design and Execution Road Node A1 (km 326+155) – DJ 704 (Cugir)
149.112.769 RONFrist 13. Okt. ·
Supervision Services "Design and Execution Motorway Târgu Mureș-Târgu Neamț Section II: Miercurea Nirajului-Leghin, Lot 2C: Pipirig-Vânători Neamț (Leghin)"
70.913.357 RONFrist 15. Okt. ·
Maintenance services, inspection/diagnostics, adjustments and repairs, including supply of spare parts and operating materials for UNIMOG-type vehicle equipment
6.498.155 RONFrist 16. Okt. ·
Framework agreement, for a period of 24 months, having as object: ‘Repair and replacement of expansion joints covering devices at bridges, passages, viaducts within the radius of DRDP Bucharest, lot 1-7’
UNTERSCHWELLIGFrist 19. Okt. ·
Maintenance and repair services for DACIA vehicles equipped with C.N.A.I.R. S.A. - Central
UNTERSCHWELLIGFrist 19. Okt. ·
Supervision Services "Widening to 4 lanes of the ring road of Bucharest Municipality South between A1 (km 55+520) and DN 5 (km 40+000) – LOT II Widening to 4 lanes of the ring road of Bucharest Municipality South between km 54+700 and DN 5 (km 40+000)"
17.673.600 RONFrist 19. Okt. ·
Supervision Services "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes"
15.472.723 RONFrist 19. Okt. ·
Services for preparing cadastral documentation and evaluation reports for the acquisition by the Romanian State, through expropriation/transfer, as applicable, of the properties necessary for the execution of the work "Bypass Road of Botosani Municipality"
1.375.625 RONFrist 20. Okt. ·
Procurement and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONFrist 21. Okt. ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Road, km 0+000 – km 100+900, North Ring Sector km 0+000 - 52+770 (Ensuring all traffic relations at the road junction on DN7 (km 9+400) with Highway A0)
41.037.682 RONFrist 22. Okt. ·
‘Implementation of works for the objective: ‘Strengthening and restoring the road on DN 73D adjacent to km 46+200’
47.610.842 RONFrist 22. Okt. ·
Execution of works for the objective: "Consolidation and reconstruction of road on DN 73D adjacent km 46+200"
47.610.842 RONFrist 22. Okt. ·
Framework agreement 4 years - Periodic maintenance works - Very thin cold bituminous layers, Year I - Year IV - DRDP Buzau - Lot SDN Braila
Frist 30. Okt. ·
Framework agreement - Purchase of additives for the production of stable asphalt mixture and stabilized asphalt mixture - (24 months)
Frist 2. Nov. ·
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
20186
20197
20204
2021252
2022529
2023559
20242.241
20251.387
20261.036
Clement Was die Zahlen über diesen Auftraggeber sagen
- 56 % der Zuschläge dieses Auftraggebers gingen an Unternehmen, die hier schon einmal gewonnen hatten (4.145 Zuschläge seit 2018, verteilt auf 652 Unternehmen). Das ist deutlich weniger als im Land üblich (76 %) — dieser Auftraggeber wechselt seine Lieferanten öfter als andere.n = 4.145 Zuschläge seit 2018
- Im Median lagen 3 Angebote je Verfahren auf dem Tisch (3.037 Verfahren mit Bieterzahl); bei 21 % blieb es bei einem einzigen Bieter. Land: 5,3 Angebote im Median.n = 3.037
- Der Zuschlag lag im Median bei 92 % des geschätzten Auftragswerts (66 Zuschläge mit Schätzung und Wert) — wer an der Schätzung kalkuliert, liegt hier meist zu hoch. Land: 82 %.n = 66
- 9 % der eingegangenen Angebote kamen aus anderen Ländern (1.913 Verfahren mit Bietermix) — nicht nur die Gewinner, alle Bieter. Land: 2 %.n = 1.913
- 84 % der eingegangenen Angebote kamen von kleinen und mittleren Unternehmen (1.913 Verfahren mit Bietermix). Land: 68 %.n = 1.913
- 6 % der Zuschläge gingen an Unternehmen aus dem Ausland (4.145 Zuschläge mit bekanntem Gewinnerland). Landesschnitt: 1 %.n = 4.145
- In 90 Verfahren mit strukturierten Eignungskriterien verlangte dieser Auftraggeber am häufigsten: Anteil an Unterauftragnehmern (90 von 90), Eintragung im Handelsregister (90 von 90), Unabhängiges Qualitätszertifikat (z. B. ISO 9001) (74 von 90), Mindestjahresumsatz (67 von 90).n = 90
Aus den dokumentierten Zuschlägen dieses Auftraggebers; Vergleichswerte aus derselben Branche und demselben Land. Keine Prognose, keine Rechtsberatung. Stand 06.10.2026.
Erwartete nächste Vergaben
Aus dem Rhythmus der bisherigen Zuschläge je Branche — eine Erwartung, keine Ankündigung. Bisherige Trefferquote: 26 % der 11.200 abgelaufenen Erwartungsfenster brachten eine Bekanntmachung.
- Aug. 2026Transportdienste
etwa alle 2 Monate · 60 Zuschläge · zuletzt Juli 2026 an LORGER - Sept. 2026Logistik & Transportunterstützung
etwa alle 3 Monate · 8 Zuschläge · zuletzt Juni 2026 an OPERATIONAL AUTOLEASING S.R.L. - Okt. 2026Architektur & Ingenieurwesen
etwa alle 1 Monate · 150 Zuschläge · zuletzt Aug. 2026 an D P CONSULT - Okt. 2026Büro- & IT-Ausstattung
etwa alle 1 Monate · 46 Zuschläge · zuletzt Sept. 2026 an QUARTZ MATRIX - Okt. 2026Reinigung, Umwelt & Entsorgung
etwa alle 1 Monate · 437 Zuschläge · zuletzt Sept. 2026 an IRI COM MARKET - Okt. 2026Bergbau & Rohstoffe
etwa alle 1 Monate · 50 Zuschläge · zuletzt Sept. 2026 an VINCI GROUP AG SRL - Okt. 2026Unternehmensdienste
etwa alle 1 Monate · 162 Zuschläge · zuletzt Sept. 2026 an DIGISIGN - Nov. 2026Bauarbeiten
etwa alle 1 Monate · 982 Zuschläge · zuletzt Sept. 2026 an TRIPOL SISTEM CONSTRUCT
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| LOIAL IMPEX | 81 | 2024–2026 |
| OYL COMPANY HOLDING AG S.R.L. | 70 | 2024–2026 |
| VESTA INVESTMENT | 66 | 2024–2026 |
| SC EDIL CONTRACT SRL | 65 | 2024–2026 |
| TRANSPOL SERVICE | 60 | 2024–2026 |
| GAMIDA EUROMARK | 48 | 2025–2026 |
| DUMAVA SEMNALIZARE | 42 | 2024–2026 |
| PORR CONSTRUCT | 41 | 2024–2026 |
| RAD-TRANS | 39 | 2024–2026 |
| GIROD Semnalizare Rutiera | 38 | 2024–2026 |
Aus 18,0 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Jetzt registrieren →