Friedrich & ClementBETA

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Romania · 38 open tenders · 2,989 documented awards

Current tenders

Equipment rental services for the Production section - Spraying equipment necessary for priming - Framework agreement 2 years - RELAUNCH
1.200.000 RONDeadline 7 Oct ·
DESIGN AND EXECUTION LOT 1: Bridge on DN 6 km 268+371 at Arginesti LOT 2: Modernization Bridge on DN 15 km 304+680 at Viisoara
127.939.019 RONDeadline 7 Oct ·
Purchase and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONDeadline 7 Oct ·
PICKUP COMMERCIAL VEHICLE, full hybrid (N1)
7.648.350 RONDeadline 7 Oct ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Motorway, km 0+000 – km 100+900, Northern Ring sector km 0+000 - 52+770 (Provision of all traffic relations at the road junction on DN7 (km 9+400) with Motorway A0)
41.037.682 RONDeadline 8 Oct ·
Framework Agreement 48 months – Technical inspection services for main cable, suspenders and metal deck, Suspension Bridge
2.502.000 RONDeadline 9 Oct ·
Framework agreement 48 months – Technical inspection services for main cable, suspenders and steel deck, Suspended bridge
2.502.000 RONDeadline 9 Oct ·
Additives for asphalt mixtures: adhesivity additive for road bitumen, additive for reducing the operating temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
Deadline 12 Oct ·
Design and execution "Pantelimon Road Junction (A0 - km 48) A0 North sector"
162.816.653 RONDeadline 12 Oct ·
Additives for asphalt mixtures: adhesion additive for road bitumen, additive to reduce the laying temperature of asphalt mixture, fluxing additive for the production of storable mixture, polyethylene bags for packaging storable mixture, cleaning/anti-adhesive product for bitumen and bituminous products
2.850.000 RONDeadline 12 Oct ·
Supervision Services Design and Execution "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening at 4 lanes and km 51+041 – km 109+905 road at 2 lanes, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 road at 2 lanes"
20.269.000 RONDeadline 12 Oct ·
Supervision Services "Execution of Arad – Oradea Lot 1 Express Road Works"
18.874.800 RONDeadline 12 Oct ·
Design and Execution "Pantelimon Road Junction (A0 - km 48) A0 North Sector"
162.816.653 RONDeadline 12 Oct ·
DESIGN AND EXECUTION “Autostrada Craiova – Filiasi and Drum Express Filiasi – Targu Jiu – Lot 4”
2.485.975.080 RONDeadline 12 Oct ·
Bright Ensemble to Increase Driving Safety on Dangerous Sectors
74.811.664 RONDeadline 12 Oct ·
Repair and arrangement of lay-by on Highway A2 km 162+620, including earthworks, systems for collecting and evacuating water from the area adjacent to Highway A2 – DRDP Constanta
BELOW THRESHOLDDeadline 13 Oct ·
Design and Execution Road Node A1 (km 326+155) – DJ 704 (Cugir)
149.112.769 RONDeadline 13 Oct ·
Supervision Services "Design and Execution Motorway Târgu Mureș-Târgu Neamț Section II: Miercurea Nirajului-Leghin, Lot 2C: Pipirig-Vânători Neamț (Leghin)"
70.913.357 RONDeadline 15 Oct ·
Maintenance services, inspection/diagnostics, adjustments and repairs, including supply of spare parts and operating materials for UNIMOG-type vehicle equipment
6.498.155 RONDeadline 16 Oct ·
Framework agreement, for a period of 24 months, having as object: ‘Repair and replacement of expansion joints covering devices at bridges, passages, viaducts within the radius of DRDP Bucharest, lot 1-7’
BELOW THRESHOLDDeadline 19 Oct ·
Maintenance and repair services for DACIA vehicles equipped with C.N.A.I.R. S.A. - Central
BELOW THRESHOLDDeadline 19 Oct ·
Supervision Services "Widening to 4 lanes of the ring road of Bucharest Municipality South between A1 (km 55+520) and DN 5 (km 40+000) – LOT II Widening to 4 lanes of the ring road of Bucharest Municipality South between km 54+700 and DN 5 (km 40+000)"
17.673.600 RONDeadline 19 Oct ·
Supervision Services "Modernization DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 widening to 4 traffic lanes and km 51+041 – km 109+905 two-lane road, Sector 1: Baldana – Targoviste km 0+000 – km 44+130 widening to 4 traffic lanes"
15.472.723 RONDeadline 19 Oct ·
Services for preparing cadastral documentation and evaluation reports for the acquisition by the Romanian State, through expropriation/transfer, as applicable, of the properties necessary for the execution of the work "Bypass Road of Botosani Municipality"
1.375.625 RONDeadline 20 Oct ·
Procurement and transport of LED lighting devices for signaling dangerous curves and sectors
97.920.000 RONDeadline 21 Oct ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Road, km 0+000 – km 100+900, North Ring Sector km 0+000 - 52+770 (Ensuring all traffic relations at the road junction on DN7 (km 9+400) with Highway A0)
41.037.682 RONDeadline 22 Oct ·
‘Implementation of works for the objective: ‘Strengthening and restoring the road on DN 73D adjacent to km 46+200’
47.610.842 RONDeadline 22 Oct ·
Execution of works for the objective: "Consolidation and reconstruction of road on DN 73D adjacent km 46+200"
47.610.842 RONDeadline 22 Oct ·
Framework agreement 4 years - Periodic maintenance works - Very thin cold bituminous layers, Year I - Year IV - DRDP Buzau - Lot SDN Braila
Deadline 30 Oct ·
Framework agreement - Purchase of additives for the production of stable asphalt mixture and stabilized asphalt mixture - (24 months)
Deadline 2 Nov ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

20186
20197
20204
2021252
2022529
2023559
20242,241
20251,387
20261,036

Clement What the numbers say about this buyer

  • 56% of this buyer's awards went to companies that had already won here before (4,145 awards since 2018, spread over 652 companies). That is well below the national norm (76%) — this buyer switches suppliers more often than others.n = 4,145 awards since 2018
  • The median procedure drew 3 bids (3,037 procedures with a bid count); 21% ended with a single bidder. Country: median 5.3 bids.n = 3,037
  • The award came in at a median 92% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 82%.n = 66
  • 9% of the bids received came from other countries (1,913 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 1,913
  • 84% of the bids received came from small and medium-sized enterprises (1,913 procedures with a bid mix). Country: 68%.n = 1,913
  • 6% of awards went to companies from abroad (4,145 awards with a known winner country). National average: 1%.n = 4,145
  • Across 90 procedures with structured selection criteria, this buyer most often required: Share of subcontractors (90 of 90), Trade register enrolment (90 of 90), Independent quality certificate (e.g. ISO 9001) (74 of 90), Minimum annual turnover (67 of 90).n = 90

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.

Who has won here before

CompanyAwardsPeriod
LOIAL IMPEX812024–2026
OYL COMPANY HOLDING AG S.R.L.702024–2026
VESTA INVESTMENT662024–2026
SC EDIL CONTRACT SRL652024–2026
TRANSPOL SERVICE602024–2026
GAMIDA EUROMARK482025–2026
DUMAVA SEMNALIZARE422024–2026
PORR CONSTRUCT412024–2026
RAD-TRANS392024–2026
GIROD Semnalizare Rutiera382024–2026

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.