Електроразпределение Юг ЕАД
Bulgarien · 23 offene Verfahren · 725 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Delivery of miniature circuit breakers
UNTERSCHWELLIGFrist 21. Aug. · noch 2 Tage
Delivery of materials for security systems
2.556.000 €Frist 24. Aug. · noch 4 Tage
Delivery of materials for security systems
Frist 24. Aug. · noch 5 Tage
Delivery, installation and commissioning of a power transformer 40/50MVA – 110/20kV at Substation Tsaratsovo, dismantling and transportation to the warehouse of Electrodistribution South EAD of the existing transformer 25/32.5 MVA
Frist 27. Aug. · noch 8 Tage
362-EP-26-NE-Д-З
1.054.700 €Frist 2. Sept. · noch 13 Tage
Delivery of screw connectors for cable harnesses 1kV
325.400 €Frist 3. Sept. · noch 14 Tage
Delivery of screw connectors for cable harnesses 1kV
Frist 3. Sept. · noch 15 Tage
Delivery of fittings for twisted conductors Al/R 1kV, by separate items
545.910 €Frist 7. Sept. · noch 18 Tage
Carrying out repair, sanitation, reconstruction and demolition activities of the architectural-construction part of transformer substations and hub stations in Network Region Kardzhali
384.024 €Frist 8. Sept. · noch 19 Tage
Supply of electrical distribution boards type size A-mini, made of glass-filled polyester for nominal voltage U0/U 0.6/1 kV.
1.020.000 €Frist 8. Sept. · noch 19 Tage
Delivery and installation of a concrete complete transformer station БKTП-2, with maximum envelope dimensions: width 2600mm and length 4400mm, with gas-insulated switchgear of natural origin, with transformer power 2x800kVA, 20/0.4kV
450.256 €Frist 8. Sept. · noch 19 Tage
Delivery and installation of a concrete complete transformer substation BKTP-2, with maximum enclosure dimensions: width 2600mm and length 4400mm, with gas-insulated switchgear of natural origin, with transformer capacity 2x800kVA, 20/0.4kV
Frist 8. Sept. · noch 20 Tage
Performance of activities for repair, renovation, reconstruction and demolition of the architectural-construction part of substations and nodal stations in Kardjali Network Region
Frist 8. Sept. · noch 20 Tage
Delivery of fittings for twisted conductors Al/R 1kV, by separate items
Frist 8. Sept. · noch 20 Tage
Delivery of electrical metering panels type size A-mini, made from glass-filled polyester for nominal voltage U0/U 0.6/1 kV.
Frist 8. Sept. · noch 20 Tage
Delivery of non-insulated aluminium-steel conductors
Frist 9. Sept. · noch 21 Tage
Delivery of a winch equipment set
UNTERSCHWELLIGFrist 14. Sept. · noch 26 Tage
Execution of cadastral activities and related design and geodetic activities in connection with the implementation of facilities under the investment program, maintenance and connection of new customers in "Electrorazpределение Yug" EAD in Network Region Burgas South, for the territory of municipalities Primorsko, Sozopol, Tsarevo, Malko Turnovo.
96.670 €Frist 18. Sept. · noch 29 Tage
Development of projects under the investment program, maintenance and connection of new customers in Network regions of "Elektroraspredelenie Yug" EAD - Network region Stara Zagora
57.328 €Frist 18. Sept. · noch 29 Tage
Development of projects under the investment program, support and connection of new customers in Network regions of "Elektroraspredelenie Yug" EAD - Network region Stara Zagora
Frist 18. Sept. · noch 30 Tage
Conducting cadastral activities and related design and geodetic activities in connection with the implementation of objects under the investment program, maintenance and connection of new customers in "Elektroraspredelen Yug" EAD in Burgos South Network Region, for the territory of the municipalities of Primorsko, Sozopol, Tsarevo, Malko Tarnovo.
Frist 18. Sept. · noch 30 Tage
Delivery of electrical meter boards with metal casing type TEMOr (for open installation for risk clients), nominal voltage U0/U 0.6/1 kV
308.570 €Frist 21. Sept. · noch 32 Tage
Delivery of electrical distribution boards with metal enclosure type TEMOr (for open mounting for risky customers), nominal voltage U0/U 0.6/1 kV
Frist 21. Sept. · noch 33 Tage
Delivery of single-phase and three-phase electricity meters for direct measurement, compatible with the existing in ER South System for remote meter reading ADDAX IMS
Frist 8. Feb. · noch 173 Tage
Procurement of used distribution transformers
Frist 30. Apr. · noch 620 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
2024719
2025814
2026542
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| ИНТЕРКОМПЛЕКС ООД | 58 | 2024–2026 |
| ИНДЕСК ООД | 44 | 2024–2026 |
| КОНТРАГЕНТ 35 ЕООД | 32 | 2024–2026 |
| СМАРТ ПАУЪР ГРИД ООД | 22 | 2024–2026 |
| ИНЖЕНЕРИНГ ЕАД | 22 | 2024–2026 |
| ПРОДЖЕКТ ПЛАНИНГ ЕНД МЕНИДЖМЪНТ ООД | 21 | 2024–2026 |
| НИКДИМ ООД | 18 | 2024–2026 |
| МАДЖЕСТИК СТРОЙ ЕООД | 18 | 2024–2026 |
| МАКРИС - ГПХ ООД | 18 | 2024–2025 |
| НИКИКА-90 ООД | 18 | 2024–2026 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →