ADIF - Presidencia
Spanien · 38 offene Verfahren · 10.606 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Cleaning service for the residence of the Technological Training Center of Valencia.
106.848 €UNTERSCHWELLIGFrist 28. Aug. · noch 8 Tage
Consulting and assistance for the control of construction works execution of the new Casilla de los Pinos station project in Dos Hermanas.
1.535.862 €Frist 28. Aug. · noch 8 Tage
Vegetation removal services through felling and clearing and treatment of embankment and cutting slopes within the scope of the railway infrastructure network of the Conventional Central Network Operations Sub-directorate
3.578.902 €Frist 31. Aug. · noch 11 Tage
Repair of modems of the Adif IP multimedia network for maintenance operations
40.000 €UNTERSCHWELLIGFrist 31. Aug. · noch 11 Tage
Evolution of energy remote controls to the new software platform and implementation in the southern energy remote control system of the remote controls of Córdoba and Seville.
5.897.096 €Frist 31. Aug. · noch 11 Tage
Execution of works for the replacement and construction of fencing project. L710 Altsasu – Castejón de Ebro. PP.KK. 202+533 - 203+860 Municipal district of Arakil (Navarra).
1.512.240 €UNTERSCHWELLIGFrist 1. Sept. · noch 12 Tage
Technical assistance for monitoring and control of execution of works for standardization and modernization of locks in the sections Gijón - El Berrón and Oviedo – Infiesto.
1.621.302 €Frist 4. Sept. · noch 15 Tage
Technical assistance services for the control and monitoring of the execution of works corresponding to replacement and execution of fencing projects within the scope of the Southern Conventional Network Operations Sub-directorate. Southern Infrastructure Area Management. Line 400, Line 402, Line 410 and Line 416.
566.404 €Frist 4. Sept. · noch 15 Tage
Renewal of air conditioning equipment in technical rooms of security and telecommunications facilities belonging to the northern operations subdirectorate. 2 lots
3.227.614 €Frist 7. Sept. · noch 18 Tage
Supply of track apparatus for the replacement of switches at the stations of Calancha, Peñalajo and Las Madrigueras
1.258.638 €Frist 7. Sept. · noch 18 Tage
Supply of manageable power supplies for fixed station of the train-ground system
1.722.000 €Frist 7. Sept. · noch 18 Tage
Execution of new track and electrification at Bezana station (Cantabria) on line 770 Santander-Oviedo
2.427.919 €UNTERSCHWELLIGFrist 8. Sept. · noch 19 Tage
Technical Direction and Assistance with Works Control for the Execution Project of Intervention on the Roof of Illescas Station (Toledo)
17.840 €UNTERSCHWELLIGFrist 9. Sept. · noch 20 Tage
Cleaning service for ADIF office buildings in the territorial scope.
3.675.073 €Frist 9. Sept. · noch 20 Tage
Execution of works for the repair project of unstable slopes located between KP 42+000 to 58+000 of the Ferrol-Viveiro section. Line 740- Pravia
2.587.816 €UNTERSCHWELLIGFrist 11. Sept. · noch 22 Tage
Execution of works for the construction project for the elimination of level crossings at pk 25/600 and 25/797 of the General Interest Railway Line 336 El Reguerón - Alacant - Terminal. Municipality of Elche (Alicante)
3.822.620 €UNTERSCHWELLIGFrist 11. Sept. · noch 22 Tage
Drafting of the construction project and execution of the necessary works for the new installation of level crossings at pp.kk. 13/481, 14/142 and 33/268, and the renovation of level crossings at pp.kk. 8/175, 23/864, 80/609, 82/014 and 83/356 belonging to line 204 Canfranc branch-Canfranc in the province of Huesca.
3.857.681 €UNTERSCHWELLIGFrist 11. Sept. · noch 22 Tage
Consulting and technical assistance services for the control and supervision of construction works for the safety installations project of the Vilaseca interchange and new diversions at the Vilaseca bifurcation
661.399 €Frist 11. Sept. · noch 22 Tage
Execution of works for the construction project for renewal of infrastructure and tunnel road section 58. Mora la Nova - Els Guiamets section. Line 210 Miraflores - Sant Vicenç de Calders.
273.466 €UNTERSCHWELLIGFrist 11. Sept. · noch 22 Tage
Supply and transport of sleepers for the new railway access to the Port of Seville.
521.419 €Frist 11. Sept. · noch 22 Tage
Execution of works corresponding to replacement and execution of fencing projects within the scope of the conventional southern network operations sub-directorate. Southern infrastructure area management. Lines 400, 402, 410 and 416.
3.848.124 €UNTERSCHWELLIGFrist 11. Sept. · noch 22 Tage
Services for the environmental assessment and drafting of the construction project for the new L300 bridge over the Jarama River (p.k. 45+800), Aranjuez (Madrid)
1.285.400 €Frist 11. Sept. · noch 22 Tage
Technical assistance service for the supervision of execution works for a new track and electrification at Bezana station (Cantabria) on line 770 Santander - Oviedo
337.310 €Frist 15. Sept. · noch 26 Tage
Execution of works for the projects of expansion of the underpass on Rúa de Ramón Puga, PK 244/881 of the Zamora-La Coruña Line and expansion of the overpass on Rúa de Tarascón, PK 48/241 of the Monforte-Ourense-Vigo Line, in the urban area of the city of Ourense (Galicia).
1.794.193 €UNTERSCHWELLIGFrist 15. Sept. · noch 26 Tage
Technical assistance services for the control of rehabilitation works of conventional network electrical substations in Inoso and Zuazo. Line 700. Intermodal Abando Indalecio Prieto to Casetas.
169.884 €UNTERSCHWELLIGFrist 15. Sept. · noch 26 Tage
Comprehensive maintenance service for the neural center of stations (CNE) in Valdebebas.
253.117 €Frist 16. Sept. · noch 27 Tage
Technical direction and technical assistance for the control of works of the construction project for the modernization of Viladecans station Barcelona
465.896 €Frist 16. Sept. · noch 27 Tage
Service for carrying out topographic surveys to verify clearances at Aranjuez and Soria stations.
21.559 €UNTERSCHWELLIGFrist 16. Sept. · noch 27 Tage
Consulting and technical assistance services for the drafting of the construction project for the duplication of the route and electrification of line 500. Section: Humanes – Illescas and remodeling of Griñón station
2.186.106 €Frist 18. Sept. · noch 29 Tage
Services for the drafting of the construction project for the remodeling of the Córdoba freight transport terminal. Road, electrification, urbanization and accesses
2.504.371 €Frist 18. Sept. · noch 29 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
20181.452
20191.262
20201.133
2021914
2022835
20231.375
20241.399
20251.265
20261.126
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| ELECNOR SERVICIOS Y PROYECTOS,S.A.U. · ALBACETE | 123 | 2021–2026 |
| LOKIMICA S.A. · ALICANTE/ALACANT | 105 | 2018–2026 |
| ECINGEN S.L. · Ciudad Real | 83 | 2017–2024 |
| MULTISERVICIOS GUERRA SL · CASTEJON | 83 | 2018–2026 |
| Coymal SL · Arganda Del Rey | 78 | 2017–2026 |
| ONET IBERIA SOLUCIONES S.A.U | 74 | 2018–2026 |
| SGS TECNOS SA · ALBACETE | 66 | 2018–2025 |
| INGENIERÍA Y PREVENCIÓN DE RIESGOS, S.L. | 65 | 2014–2026 |
| SERVEO SERVICIOS, S.A. | 61 | 2017–2026 |
| ASOCIACION DE ACCION FERROVIARIA (CETREN) | 61 | 2018–2026 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →