78 days from notice to award in Germany — and why most “average durations” you read are wrong

Field Guide14 September 20265 min read

We measured the time between a German contract notice and its award across 131,348 awards from 4,490 buyers. Median: 78 days. Planning contracts take 133. And the first version of our own number was 14 days — here is what went wrong.

If you win a public contract in Germany, how long after the notice does the award arrive? The honest answer is 78 days at the median, with a spread from five weeks for general supplies to more than four months for engineering and planning services.

Petroleum, fuels63 days
Laboratory equipment70 days
Landscaping71 days
Vehicles83 days
Construction works87 days
Cleaning & environment88 days
Medical equipment90 days
Software103 days
IT services106 days
Engineering & planning133 days
Germany, median days from contract notice to award, by CPV division (divisions with ≥ 800 measured awards). Construction: 50,435 awards; planning: 22,076.
F&C award corpus, snapshot 14 Sep 2026

The ordering is intuitive once you see it. Fuels and lab equipment are bought on price from a short list; construction has a fixed statutory rhythm; software and IT services involve negotiation rounds; planning contracts under the HOAI fee scale run through two-stage procedures with design presentations. For a bidder, the number is the length of the bridge between your submission and your first invoice.

Our first version of this number said 14 days. It was wrong, and the reason it was wrong is the reason to distrust most durations you read.

Here is the trap. A contract award notice carries its own publication date — the day the award was announced. If you subtract that from the award date, you get the administrative lag of the announcement (zero to two weeks), not the procedure. Several national portals publish awards only, with no separate contract notice at all. Feed those into a naive “publication to award” calculation and the median collapses to a fortnight. That is what our first nightly build did, across 25,000 buyers. It looked plausible. It was noise.

The corrected measure only counts awards that can be tied to a contract notice published at least seven days earlier. That shrinks the measurable set from 25,000 buyers to 4,490 German buyers and 131,348 awards — and the median moves from 14 to 78 days. Fewer numbers, all of them meaning what they say. We publish the count next to every figure for exactly this reason: a duration without its n is a guess wearing a suit.

Data & method

Sample: German contract awards with an award date and a linked contract notice (TED contract notices and national notices that precede the award), duration = award date minus notice publication, 7–730 days, median per buyer and per CPV division. Award-only publications (TED award notices, BOAMP attribution notices, and the award registers of ES, PT, IT, RO, GR, HR) are excluded from this measure. Spain is not shown: its award register updates the original notice in place, which makes the notice date unreliable for this purpose. Snapshot 14 Sep 2026.