Works of the simplified project for the adaptation of the crossings of tracks between platforms of the Mirabel station (Extremadura).
Obras del proyecto simplificado para la adaptación de los cruces de vías entre andenes de la estación de Mirabel (Extremadura). — original title
Your path to submission
- Deadline: 26 October at 10:00 — 7 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (871 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to UTE Ogensa-gicma.n = 871
- 69% of this buyer's awards went to companies that had already won here before (11,003 awards since 2010, spread over 3,121 companies). That is well above the sector norm (52%) — newcomers have a harder time here than elsewhere.n = 11,003 awards since 2010
- The median procedure drew 2 bids (8,008 procedures with a bid count); 38% ended with a single bidder. Sector: median 4 bids.n = 8,008
- The award came in at a median 87% of the estimated value (7,052 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 7,052
- 50% of the bids received came from small and medium-sized enterprises (374 procedures with a bid mix). Sector: 68%.n = 374
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 18/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Contract for adaptation works at Mirabel railway station (Extremadura, Spain)
The input text concerns a public works contract in Spain, specifically an ADIF (Spanish rail infrastructure manager) tender for “Obras del proyecto simplificado para la adaptación de los cruces de vías entre andenes de la estación de Mirabel (Extremadura)”.
The point of view is that of Spanish public procurement under Ley 9/2017 de Contratos del Sector Público, with references to Spanish authorities (ADIF, Tribunal Administrativo Central de Recursos Contractuales) and Spanish locations (Madrid, Extremadura).
The documents describe an open simplified (abierto simplificado abreviado) works procedure with an estimated value of 76,568.06 EUR (excluding VAT) and a tender budget of 92,647.35 EUR (including 21% VAT).
Background information explains that the project’s objective is to reform a non-accessible track crossing between platforms at Mirabel station to comply with current accessibility regulations, including modification of structural elements and installation of deterrent closures and dismantling of existing crossings.
The works are framed within Spanish accessibility and railway construction rules (CPV 45234100 – Trabajos de construcción ferroviaria).
Regarding what the bidder must submit and minimum qualification requirements, the texts state that, in application of article 159.6 LCSP, economic, financial and technical solvency does not need to be formally accredited because the estimated value is under 80,000 EUR.
However, they introduce a specific technical solvency requirement: bidders must commit to assign a qualified “Jefe de Obra” (site manager) with a university degree (at least MECES level 2 / EQF level 6, e.g.
Ingeniero Técnico Industrial, Arquitecto Técnico, Grado en Edificación or similar) and at least 5 years of experience as site manager in similar projects.
Such as: before award, the bidder must provide the CV and a copy of the university degree to prove this.
Additionally, registration in the ROLECSP (national contractor register) is mandatory by the offer submission deadline.
In terms of offer documentation, the “archivo electrónico o sobre” for formula‑evaluated criteria must include the annex indicating the offered price (Anejo nº 1) and the signed commitment to use ADIF’s CDE (Autodesk Construction Cloud).
On the scope of the contract (what, how much, where, when), the texts specify a single works lot (no division into lots is allowed because the project defines a “obra completa”).
Show all 46 statements
Such as: the bill of quantities is broken down into chapters (demolitions, foundations and structure, finishes, locksmithing, signalling, client‑oriented measures, cleaning, waste management, safety and health) with a material execution budget of 64,342.91 EUR, general expenses and industrial benefit of 12,225.15 EUR, and VAT of 16,079.29 EUR.
The place of performance is Mirabel station in Extremadura (sub‑entity code ES432), and the contractual execution period is 5 months.
The procedure is ordinary, with electronic offer presentation through external systems, and the deadline for submitting offers is 26/10/2026 at 10:00, with private opening of economic offers on the same date and time in Madrid.
On award criteria and weighting, the contract is awarded on the basis of the “best quality‑price ratio” with several criteria, but in practice all criteria are evaluable by formulas and there are no non-formula qualitative criteria (POT = 0).
Such as: price is the main criterion with a weighting of 98 points, while a qualitative but formula‑evaluated criterion, “Compromiso de utilización de CDE de Adif”, has 2 points.
There is no minimum threshold for qualitative criteria.
The justification section explains that because the technical specifications are sufficiently detailed in the construction project, other qualitative criteria are not considered to add substantial improvements.
The adjudication does not involve electronic auction (subasta electrónica: No).
As for risks and special conditions, the documents highlight several elements.
Penalties for breaches will be those foreseen in the PCAP (Pliego de Cláusulas Administrativas Particulares), and price revision is not allowed (“Revisión de precios: No”).
Subcontracting is permitted without specific limits (“¿Existen límites a la subcontratación?: No”), and assignment (cesión) of the contract is allowed under LCSP article 214.
Special execution conditions include social considerations (as per PCAP), compliance with data protection rules, and coordination of business activities in ADIF workplaces (POP12 and POP16), plus environmental obligations such as dismantling and certified treatment of all waste from modified installations.
Payments follow LCSP 30-day certification periods, via electronic orders and electronic payments; electronic invoicing is accepted.
On contradictions or corrections, the set of documents appears largely consistent and repetitive, with content from the “Informe sobre inicio de expediente” mirrored in the resolution and platform notices.
Apparent “double lists” of exclusion grounds and participation requirements (e.g. fraud, corruption, social and environmental breaches, insolvency, quiebra, conflict of interest, participation in criminal organizations, etc.) are complementary extracts of the standard ESPD/exclusion clauses and not contradictory.
When a question arises as to which statement applies regarding solvency, the governing rule is explicitly stated: article 159.6 LCSP exempts bidders from accrediting general economic/financial/technical solvency, but the specific technical condition on the assignment of qualified personnel in section 8.3 of the Informe/PCAP also applies and must be complied with.
Likewise, where some texts generically refer to “criterios cualitativos” of 2 points, the detailed criteria description clarifies that this is solely the commitment to use ADIF’s CDE, so that interpretation prevails.
Answers on the required criteria
Must securities be provided (bid bond, performance or warranty guarantee)? If so: which, in what amount and by when?
There is no mention of a bid bond or warranty guarantee being required in the excerpts provided; instead, there are template clauses describing when a complementary 5% guarantee could be requested in other cases (such as EU‑funded contracts or abnormally low bids), but in this specific tender those options are not ticked.
Is subcontracting allowed? If so: with which limits and which disclosure duties?
As for subcontracting, the text includes a dedicated section “19.
SUBCONTRATACIÓN” followed by the question “¿Existen límites a la subcontratación a las tareas objeto del contrato?: No.” This indicates that subcontracting is allowed without specific quantitative limits to the portions of work that may be subcontracted.
However, as in all Spanish public contracts, general obligations under the LCSP still apply, such as disclosure and responsibility for subcontractors, even if not detailed here.
For instance, the contractor must comply with ADIF’s procedures for coordination of business activities in its workplaces (POP12 and POP16), which also apply to companies performing activities on ADIF’s sites, including subcontractors.
Any more precise disclosure duties (such as prior communication of subcontractors, thresholds, or form of notification) would appear in the PCAP, which is referenced but not fully shown in the input.
Is there a site visit, and is attendance mandatory? If so: when?
Concerning site visits, language of tender documents, validity of tenders and deadlines for bidder questions, the excerpts do not give explicit answers.
The texts show the submission deadline (“Plazo de Presentación de Oferta Hasta el 26/10/2026 a las 10:00”) and the opening of the economic offers on 26/10/2026 at 10:00 in Madrid, but do not mention any mandatory or optional site visit, nor a date for such a visit.
In which language must the tender and the supporting documents be submitted, and are documents in other languages accepted?
Likewise, they do not specify the language in which tenders must be submitted or whether documents in other languages are accepted; given that this is a Spanish public tender and all documentation and references (PCAP, PPTP, LCSP) are in Spanish, the working assumption is that Spanish is required, but this is not explicitly stated in the text provided.
How long is the bidder bound by the tender (validity period), and is there a deadline for bidder questions? If so: until when?
Finally, there is no information in the excerpts on how long bidders are bound by their offers (validity period) or on a specific deadline for submitting bidder questions; such details are typically regulated in the PCAP, which is referenced (“Según PCAP”) for the presentation of offers and payment regime, and would need to be consulted directly to answer those points with certainty.
Further details
Public works tender for accessibility improvements at Mirabel railway station (Extremadura, Spain)
The input text concerns a Spanish public procurement procedure launched by ADIF (the Spanish rail infrastructure manager) for construction works at Mirabel railway station in Extremadura.
It describes, among other things, the object of the contract, its estimated value, the procedure (open simplified), the execution period and several administrative and technical conditions.
The country perspective is clearly Spain, with references to Spanish law (Ley 9/2017 de Contratos del Sector Público – LCSP), Spanish public platforms (Plataforma de Contratación del Sector Público) and Spanish public bodies (ADIF, Tribunal Administrativo Central de Recursos Contractuales).
As background, the documents describe a works contract with an estimated value of 76,568.06 EUR (before VAT) and a total budget of 92,647.35 EUR (including 21% VAT), with a five‑month execution period.
The object is the simplified project for adapting the track crossings between platforms at Mirabel station to current accessibility regulations, including structural modifications and installation of deterrent closures to cancel existing crossings.
The procedure is “procedimiento abierto simplificado abreviado” with several award criteria, such as price (98 points) and commitment to use ADIF’s Common Data Environment (CDE) (2 points), and is conducted electronically through external systems, as is typical in Spanish public e‑tendering.
Only the contracting authority's tender documents are binding. As of: 18/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ELECNOR SERVICIOS Y PROYECTOS,S.A.U. · ALBACETE | 123 | 2021–2026 |
| LOKIMICA S.A. · ALICANTE/ALACANT | 106 | 2018–2026 |
| MULTISERVICIOS GUERRA SL · CASTEJON | 83 | 2018–2026 |
| ECINGEN S.L. · Ciudad Real | 83 | 2017–2024 |
| Coymal SL · Arganda Del Rey | 78 | 2017–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 71 completed awards — not a statement about this procedure.)
This procedure allows 18 days between publication and deadline — typical in this country is 26 (median of 7,177 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Spain · Construction work, 88 contracts went to foreign companies over the last 3 years (of 99,617 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now