COLLECTIVITE TERRITORIALE DE GUYANE
Frankreich · 19 offene Verfahren · 882 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Rehabilitation of the Georges Theolade Regional Omnisport Palace
UNTERSCHWELLIGFrist 24. Aug. · noch 5 Tage
Careening of Ferry MALANI and GABRIELLE
Frist 25. Aug. · noch 5 Tage
Professionalization Plan for HR Actors in Territorial Public Administration
UNTERSCHWELLIGFrist 25. Aug. · noch 6 Tage
Refurbishment of Bac MALANI and GABRIELLE
Frist 25. Aug. · noch 6 Tage
Structural reinforcement and/or reprofiling and renewal of pavement and shoulder surfacing works and arrangements of the appurtenances of the Departmental Roads of the Territorial Collectivity of Guyana
40.000.000 €Frist 3. Sept. · noch 14 Tage
Works to reinforce the structure and/or reshape and renew the pavement of roads and shoulders and development of the dependencies of the Departmental Roads of the Collec
Frist 3. Sept. · noch 15 Tage
Technical, economic and regulatory feasibility study for the valorization of Guyana mud for cosmetic and therapeutic uses
UNTERSCHWELLIGFrist 8. Sept. · noch 20 Tage
Support for project management for the revision of the diagnosis and development of the strategy for European programs post-2027 by the Territorial Collectivity of Guyana, for the
UNTERSCHWELLIGFrist 10. Sept. · noch 22 Tage
Structural reinforcement work and/or reprofiling and pavement renewal of roadways and shoulders and development of adjacent areas of the Departmental Roads of the Territorial Collectivity of French Guiana
40.000.000 €Frist 11. Sept. · noch 22 Tage
Strengthening of structure and/or reshaping and renewal of road surface and verges and development of appurtenances of Departmental Roads of the Collec
Frist 11. Sept. · noch 23 Tage
Management and operation of the regional market of interest (MIR) in Cayenne
Frist 14. Sept. · noch 25 Tage
Realization of a zoning study of the Palmier Bache (BURITI) and Wassaï in French Guiana
UNTERSCHWELLIGFrist 14. Sept. · noch 26 Tage
Management and operation of the regional market of interest (MIR) of Cayenne
Frist 14. Sept. · noch 26 Tage
Acquisition of reprography equipment
Frist 18. Sept. · noch 29 Tage
Acquisition of reprography equipment
Frist 18. Sept. · noch 30 Tage
Implementation of a supplementary social protection scheme covering provident and health benefits
984.000 €Frist 30. Sept. · noch 41 Tage
Implementation of a supplementary social protection scheme covering life insurance and health insurance
Frist 30. Sept. · noch 42 Tage
Dynamic acquisition system for the execution of maintenance and cleaning services for any place where the Territorial Collectivity of Guyana is called upon to exercise its competencies and missions. (Administrative buildings and premises, and/or any place welcoming the public or users of the Contracting Authority, and/or local public educational establishments (EPLE))
Frist 11. Sept. · noch 753 Tage
Dynamic Acquisition System for the Execution of Maintenance and Cleaning Services for Any Location in which the Territorial Collectivity of French Guiana is Called Upon to Exercise Its Competencies and Mission
Frist 11. Sept. · noch 754 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
2018193
2019321
2020344
2021325
2022332
2023333
2024346
2025352
2026269
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| Apave Guyane | 14 | 2019–2023 |
| COGIT SARL | 13 | 2019–2023 |
| EIFFAGE INFRA GUYANE | 12 | 2019–2023 |
| SOMASCO | 11 | 2022–2025 |
| CEGELEC GUYANE | 11 | 2019–2023 |
| AMAZONIE PAYSAGE | 9 | 2019–2023 |
| GUYANE BATIMENT GENERAL | 8 | 2018–2022 |
| BATI-TECH / BATI-PHONE | 8 | 2019–2023 |
| EQUINOXE FORMATION | 8 | 2021–2026 |
| EIFFAGE ENERGIE GUYANE | 8 | 2019–2022 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →