Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Comprehensive renovation of access building, provision of access control and public parking, and improvement of urbanization of the Ministry of Agriculture, Livestock and Natural Environment in Badajoz

Reforma integral de edificio acceso, dotación de control de acceso y aparcamiento público, y mejora de urbanización de la Consejería de Agricultura, Ganadería y Medio Natural en Badajoz — original title

ESSpain · MéridaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 23 November at 15:00 — 22 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated value€131,518
Published23 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45210000

Clement What the numbers say about this buyer

  • 8% of this buyer's awards went to companies that had already won here before (84 awards since 2023, spread over 76 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 84 awards since 2023
  • In this sector the buyer awards roughly every 5 months (6 awards, most recently September 2026) — the next award is due around February 2027 by that rhythm. The last award went to RESTAURACIONES GARCIA ALVAREZ, S.L.n = 6
  • The median procedure drew just one bid (72 procedures with a bid count); 56% ended with a single bidder. Sector: median 3 bids.n = 72
  • 45% of the bids received came from small and medium-sized enterprises (21 procedures with a bid mix). Sector: 68%.n = 21
  • The award came in at a median 86% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 22

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Reforma integral del edificio de acceso y aparcamientos de la Consejería de Agricultura en Badajoz

The input text concerns a Spanish public works tender (Spain is the only specific country referenced) launched by the Consejería de Agricultura, Ganadería y Medio Natural de la Junta de Extremadura for the reform of the access building, access-control facilities, public parking and urbanisation improvements at its headquarters in Badajoz.

The point of view is that of a Spanish regional administration applying the Spanish Public Sector Contracts Law (Ley 9/2017, LCSP) and regional rules (Extremadura).

As background, the procedure is an open electronic tender (“procedimiento abierto exclusivamente electrónico”), with documentation to be submitted via the regional e‑procurement platform in three electronic “sobres/archivos”: (1) administrative documentation, (2) technical offer evaluated by judgment of value, and (3) economic offer and automatically evaluated criteria.

All documents must be submitted as digitally signed PDFs with visible hash by an authorised person.

The tender is not divided into lots and there is no electronic auction.

Financing is national/regional (no EU funds), and invoices must be electronic.

Regarding what the bidder must submit and minimum qualification requirements, the tender requires standard participation conditions (such as: capacity to contract, no prohibitions to contract, no incompatibilities, compliance with tax and Social Security obligations, and, for foreign companies, a declaration of submission to Spanish law).

In terms of solvency, the bidder may either hold contractor classification C4‑1 (Edificaciones – Albañilería, revocos y revestidos, up to 150,000 €) or prove specific solvency: (a) economic‑financial – a declaration of annual turnover where, in the best of the last three years, the volume is at least once the estimated contract value (131,518.41 €), with supporting annual accounts or, for individuals not in the Mercantile Register, tax returns and legalized books; (b) technical – a list of works executed in the last five years with certificates of good execution, indicating amounts, dates, places and confirming proper completion.

For new companies (<5 years), technical solvency may be shown by a declaration of average annual staff and management over the last three years (with requirement of maintaining ±10 %), supported by social security records when requested.

The administrative envelope must also contain any forms required in the PCAP (not fully reproduced here), including declarations on not having been the awardee of previous design/supervision contracts for this work.

Concerning the scope of the contract, the object is clearly defined as the “Reforma integral de edificio acceso, dotación de control de acceso y aparcamiento público, y mejora de urbanización” of the Consejería in Badajoz.

Show all 30 statements

The CPV code is 45210000 (building construction works).

The estimated value is 131,518.41 € and the bid base budget is 159,137.28 € (131,518.41 € without VAT).

The place of execution is Badajoz, sub-entity ES431, Spain.

The execution period is fixed at 8 months, with no extensions (0 prórrogas), justified under regional socially responsible contracting rules (Ley 12/2018).

Execution will be measured by units of work, with monthly investment curves compatible with the project’s funding schedule; the bidder’s programme of work must respect the total term and detail activities, durations (Gantt), critical path, and monthly production percentages.

As to award criteria and weighting, the tender follows the Extremadura Circular 4/2022, applying “best price‑quality ratio” with a dominant price component.

The total is 100 points, broken down as follows: (a) criteria evaluable by formula (automatic): price (Fórmula A) – up to 60 points, using the standard “Fórmula A” that awards maximum points to the highest percentage discount and scales the rest; and extension of guarantee period – up to 10 points, for months offered above the minimum contractual guarantee of 12 months, with a “satiation” threshold of +12 extra months (i.e. 24 months total), beyond which no further points are given nor can more be demanded in execution.

(b) Criteria evaluable by judgment of value – up to 30 points: 15 points for “Memoria descriptiva del proceso de ejecución y programa de trabajo”, 5 points for “Calidad” (Plan de Control de Calidad beyond the minimum legal/project requirements), 5 points for “Memoria de seguridad y salud” (organisation, analysis of the Safety and Health Study, emergency planning and coordination, etc.), and 5 points for “Tecnología en I+D+i” with strict length limits (max. 5 A4 pages, with explicit penalties if exceeded).

Each qualitative sub‑criterion is scored comparatively using scales such as “Excelente”, “Muy bueno”, “Bueno”, “Regular” and “Conforme a pliego”, mapped to percentages of the maximum sub‑score.

On risks and special conditions, the contract requires a definitive guarantee of 5 % of the award price.

There is explicit reference to possible penalties or even termination if the contractor breaches special execution conditions established under article 202 LCSP, especially those related to labour, Social Security and occupational health and safety obligations.

In addition, as a special condition of execution, the contractor must strictly comply with wage payments to staff executing the contract; the administration may require, with each invoice, a certificate by the company’s legal representative confirming that salaries are up to date.

Social and labour obligations from applicable collective agreements must be respected.

The text mentions coordination with subcontractors and autonomous workers in the safety and health plan, but the detailed limits and notifications on subcontracting are likely in the PCAP clauses not fully transcribed; no mandatory site visit is mentioned in the excerpts, nor explicit question deadline beyond the general platform practices.

All submissions must be in electronically signed PDF format, and the procedure to withdraw and re‑submit offers electronically within the deadline is described (including an exceptional email contact if the platform withdrawal is not used).

Finally, regarding contradictions or corrections, the documents explicitly record a rectification notice: where a previous announcement indicated a date “19/11/2026”, it is corrected to “23/11/2026” (this appears to concern the deadline or another relevant procedural date in the announcement).

There was also an error in the link to the PCAP in the pliegos announcement, which has been corrected pursuant to Law 39/2015 and the contracting regulations; after this correction, the PCAP is republished and bidders may withdraw any already-submitted offer and present a new one without it being considered an unjustified withdrawal.

No other substantive contradictions are evident in the provided excerpts; the solvency thresholds, scores and execution term appear consistent across announcements and the internal justification report.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 27/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
PCAP CA005.pdf
Legal document
⤓
›
Security deposit: 2 5

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
FRUTAS Y VERDURAS MASSANASSA, S.L.22026
FRANCISCO JOSE HERNANDEZ ALVIZ22026
RADIO POPULAR, S.A.-COPE22026
CZ Vaccines, S.A.U.22026
INNOCAMPO S.L. · DON BENITO22025–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Monday 23 November at 15:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 4 completed awards — not a statement about this procedure.)

This procedure allows 31 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on PLACSP — Plataforma de Contratación del Sector Público. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via PLACSP — Plataforma de Contratación del Sector Público before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now