Supply and replacement of projectors in the field of Football 11 of Sant Lluís

Suministro y sustitución de proyectores en el campo de Futbol 11 de Sant Lluís — original title

ESSpain · Sant LluísBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 23:59 — 2 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeSupplies
Estimated value€43,412
Published16 Oct 2026
ProcedureOpen procedure

Type of service

31 · Electrical machinery45 · Construction work
CPV 31518600 · 45316100

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 5 months (3 awards, most recently May 2024) — by that rhythm the next award was due around October 2024. The last award went to XIMVIAM, S.L.n = 3
  • 35% of this buyer's awards went to companies that had already won here before (125 awards since 2020, spread over 79 companies). That is well below the sector norm (55%) — this buyer switches suppliers more often than others.n = 125 awards since 2020
  • The median procedure drew just one bid (8 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 8
  • The award came in at a median 90% of the estimated value (110 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 110
  • 93% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 71%.n = 9

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Contracte de subministrament i instal·lació de projectors LED al camp de futbol 11 de Sant Lluís

The input text concerns a public procurement procedure in Spain (Ajuntament de Sant Lluís, Illes Balears) for a supply contract with accessory installation works: substitution of existing floodlights/projectors by new LED luminaires for a municipal football pitch.

It is drafted under the Spanish Ley 9/2017 de Contratos del Sector Público, with references to Spanish technical and safety regulations (REBT, ITC-EA, UNE standards) and regional environmental law (Llei 3/2005 de protecció del medi nocturn de les Illes Balears, Reglament de protecció del medi nocturn de Menorca).

The point of view is that of a Spanish contracting authority setting out technical, administrative, safety and environmental conditions for bidders.

As background, the documents describe the project’s objective as the replacement of existing luminaires and justification of the luminance values achieved, including detailed technical prescriptions (such as cable characteristics, projector photometry, colour temperature limits, efficiency requirements).

They frame the contract legally as a “contracte de subministrament” whose main object is the acquisition of LED equipment, with installation, orientation, desmuntatge and commissioning treated as accessory operations.

The procedure chosen is an open simplified procedure (procediment obert simplificat ordinari), justified because the estimated value is below EU thresholds but above the minor-contract limit, and because the authority wants to be able to require a definitive guarantee.

Regarding what the bidder must submit and the minimum qualification requirements, the text specifies several elements.

Such as, for economic and financial solvency, the bidder must demonstrate a minimum annual turnover equal to 1.5 times the estimated contract value, i.e. 65.118,47 € in the best of the last three closed financial years (art. 87 LCSP).

For technical solvency, bidders must provide the technical data sheet (“fitxa tècnica”) of the proposed projector and a guarantee certificate, enabling verification of compliance with the technical specifications.

The installer must be authorized in low voltage (Baixa Tensió) according to ITC-BT-03; this habilitation is checked with the Direcció General de Política Industrial.

As an alternative way to prove solvency, companies may present an official empresarial classification certificate: Group I (electrical installations), Subgroup 1 (enllumenats, il·luminacions), Category 1 or A. The manufacturer of the luminaire must hold ISO 9001, ISO 14001, ISO 45001 and ISO 50001 certifications, and the photometric data must be validated under UNE 13032-1 and UNE 13032-4.

Show all 32 statements

Although the detailed administrative forms are not reproduced in the excerpt, the tender configuration in the platform shows a single envelope (“sobre único”) combining administrative documentation and automatically quantifiable criteria.

Concerning the scope of the contract, the documents define what, how much, where and when.

Such as, the scope covers the supply and installation of LED projectors for the municipal “camp de futbol 11” in Sant Lluís, including desmuntatge of old equipment, mechanical mounting at approximately 18 m height on existing towers, electrical connection, precise orientation (including goniometric adjustment with laser tracer), and final photometric verification.

As for time, several references appear: the project memory states an execution period of 2 months from contract signature; the general technical conditions mention that works must start within 15 days of communication of the award and finish within the period indicated in the award notice.

Award criteria and weighting are described as purely price-based.

Such as, the tender configuration (in the electronic procurement system) shows: one envelope containing “Documentación administrativa y criterios cuantificables automáticamente” and a single award criterion “Precio”, with weighting 100.

The evaluation formula indicated is X = (precio licitación – oferta solicitante)/(precio licitación – oferta más baja), giving a normalized score between a minimum and maximum (the text lists “Cantidad mínima: 100 Cantidad máxima” but is partially truncated).

Supporting narrative in the contracting report explains that price is the only criterion because (i) the technical prescriptions are exhaustively and standardly defined ex ante, leaving no relevant qualitative variability between offers, and (ii) technical quality is contractually guaranteed via an external certification by an Organisme de Control Autoritzat (OCA) as a condition for reception and payment.

Risks and special conditions are discussed extensively, especially safety, guarantees and subcontracting.

Such as, there is a requirement to constitute a definitive guarantee of 5% of the award amount (excluding VAT), described both in the project memory (“garantia definitiva equivalent al 5%”) and in the contracting report (art. 107 LCSP).

The project specifies a 10-year product/equipment guarantee up to 90.000 operating hours, covering LED modules and drivers, with conditions on acceptable wear (0,3% per 1.000 h) and failure thresholds (5% of LEDs).

In contrast, the generic technical conditions chapter 5.5 speaks of a 12-month guarantee period for conservation and proper functioning of the “obres”, suggesting that the 10-year term is specific to the luminaires while the 12-month term applies to construction/installation aspects.

Subcontracting is explicitly prohibited: both the electronic tender configuration and the contracting report state that “no se permite la subcontratación”, justified under art. 75.4 LCSP because all installation tasks (supply, mechanical mounting at height, electrical connection, precision orientation) are defined as critical and must be executed entirely by the main contractor to avoid dilution of responsibilities and to minimize coordination and safety risks.

The safety and health basic study (Estudi Bàsic de Seguretat i Salut) elaborates on risk assessment (falls, electrical contacts, fires, glare), mandatory training records, emergency measures, and legal obligations under Ley 31/1995, RD 1627/1997, RD 39/1997, and older safety ordinances.

Penalties are not spelled out in the excerpts, but the emphasis on guarantees, photometric certification by OCA, and measurement-based payment suggests that failure to achieve required light levels or environmental constraints would affect reception and payment rather than through separate penalty clauses; the risk of “dilució de responsabilitats” is explicitly mentioned to justify both non-division into lots and non-subcontracting.

Such as, on the nature of the contract and procedure, all sources are consistent: it is a supply contract with accessory installation, procured by open simplified procedure, non-divided in lots, with principal CPV 31527260-6 and accessory 45316100-6.

On subcontracting, both the tender platform and the INF-045-26 report state “no se permite la subcontratación”, so this is clear.

On guarantees, however, there is a dual regime: the project memory sets a 10-year guarantee for LED products/components, while the generic technical conditions refer to a 12-month guarantee period for the works in general; given the more specific and later justification in the project memory, the 10-year term should be understood as a special condition for the luminaires, coexisting with the standard 12-month work guarantee.

Similarly, the technical chapters refer to a formal reception act within one month of delivery or as defined in the administrative clauses, while the contracting report emphasizes that reception and payment are conditional on an OCA certifying achievement of required photometric levels; the latter is a specific condition that would prevail regarding the acceptance of the lighting system.

No explicit information is provided in the excerpt about question deadlines or mandatory site visits; the general safety documents contemplate coordination, signalling and meetings during execution but do not mention a pre-bid site visit requirement, so bidders would rely on the advertised terms in the formal announcement and platform rather than on any implicit obligation here.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 19/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex I.docx
Further document
⤓
Annex II.docx
Further document
⤓
Annex III.docx
Further document
›
Security deposit: 2 5

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Alberto Correa Rodríguez de la Torre92024–2025
INMEX MENORCA 2023, S.L.92024–2026
INESPRO, S.L52024–2025
SA XARANGA SC42023–2026
JORDI GORDILLO MONFONTE32024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2023
2
2024
1
2026
4 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 23:59

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 2,677 completed awards — not a statement about this procedure.)

This procedure allows 18 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Spain · Electrical machinery, 78 contracts went to foreign companies over the last 3 years (of 11,640 recorded awards) — mostly from Italy, Germany, Finland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on PLACSP — Plataforma de Contratación del Sector Público. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via PLACSP — Plataforma de Contratación del Sector Público before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now