How to bid in this country: portals, deadlines, thresholds →
Roofing works for courtyard, adaptation of annexed facilities and accessibility of Reyes Católicos School in Melilla. Second procurement procedure
Obras de cubrición de patio, adecuación de dependencias anexas y accesibilidad del Colegio Reyes Católicos de Melilla. Segundo procedimiento de licitación — original title
Your path to submission
- Deadline: 13 November at 15:00 — 13 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (98 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to ANTONIO ESTRADA GARCIA.n = 98
- The median procedure drew just one bid (122 procedures with a bid count); 50% ended with a single bidder. Sector: median 4 bids.n = 122
- 63% of this buyer's awards went to companies that had already won here before (1,141 awards since 2019, spread over 353 companies). 37% went to new names.n = 1,141 awards since 2019
- 92% of the bids received came from small and medium-sized enterprises (118 procedures with a bid mix). Sector: 68%.n = 118
- 0% of the bids received came from other countries (118 procedures with a bid mix) — all bidders, not just the winners. Sector: 9%.n = 118
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Contract notice and DEUC for works at Colegio Reyes Católicos de Melilla
The input text concerns a Spanish public works contract launched by the Ciudad Autónoma de Melilla, through its Consejería de Economía, Comercio, Innovación Tecnológica, Turismo y Fomento and the Dirección General de Arquitectura.
The point of view is that of Spanish contracting authorities applying Spanish procurement law (Ley 9/2017 de Contratos del Sector Público, LCSP) within the EU-law framework (Directive 2014/24/EU), but no other countries than Spain are mentioned as contracting jurisdiction (non‑Spanish EU/EEE bidders are referenced only in general).
As background, the text describes a works contract for “Obras de cubrición de patio, adecuación de dependencias anexas y accesibilidad del Colegio Reyes Católicos de Melilla.
Segundo procedimiento de licitación”.
It explains the justification of the need, the prior technical project (expte. 301/2023/CMA), and the fact that a previous tender (51/2025/CMA) was deserted.
It also sets out the legal basis for using an open procedure with ordinary processing, not subject to EU harmonised regulation because the estimated value does not reach the thresholds of art. 20 LCSP.
References are made to LCSP arts. 13, 77, 88, 89, 99, 101, 145 and 204, showing how solvency, award criteria and contract value are chosen.
Regarding what bidders must submit and minimum qualification, the text states that in the offer phase it is “necesario la aportación del DEUC y del Anexo III” (envelope A – documentación administrativa).
The DEUC content reproduced includes declarations on identification of the economic operator, representation, reliance on other entities, intended subcontracting, and extensive exclusion grounds (criminal convictions, tax/social security defaults, insolvency, professional misconduct, conflicts of interest, etc.).
As such, bidders must declare, for example, that they are not in bankruptcy or insolvency, that they have not been convicted for corruption, fraud, terrorism, money laundering, child labour, and that they meet tax and social security obligations.
Minimum technical/financial requirements are linked to LCSP arts. 88 and 89 and detailed in Clause 2 and Clause 12 of Annex I to the PCAP; additionally, as the estimated value exceeds €500,000, classification is required: “Clasificación como contratista de obras… Grupo C, Subgrupo 3 Estructuras metálicas, Categoría 4”.
Non‑Spanish EU/EEE contractors are exempt from Spanish classification but must still prove solvency by the means foreseen in art. 88–89 LCSP.
Show all 35 statements
The documents also note that capacity to act and solvency will be formally checked only for the proposed awardee, but all bidders must hold them by the end of the offer submission period.
Concerning the scope—what, how much, where, when—the text sets: CPV 45214200 (school building construction); works of roof covering of a patio, adaptation of annex spaces and accessibility improvements in an existing school (Reyes Católicos).
The contract is classified as “obra de reforma” under art. 232 LCSP.
The place of performance is Melilla (Subentidad Nacional Melilla, ES640, Spain, postal address Melilla).
Financially, the Presupuesto base de licitación is 2.601.527,00 € (IPSI included), with 2.365.024,54/56 € excluding taxes as “Presupuesto de Ejecución por Contrata”.
The Valor Estimado del Contrato is justified and set at 2.838.029,47 € (IPSI excluded), including a potential modification of up to 20 % of the initial price (473.004,91 €) under art. 204 LCSP.
The execution period is 12 months.
The text explicitly justifies not dividing the contract into lots under art. 99.3 LCSP because, such as in this project, splitting would technically hinder proper execution and coordination of the different works.
On award criteria and weighting, the contract uses a best price‑quality ratio approach with multiple criteria, in line with art. 145 LCSP.
The documentation states that the adjudication will be based on a numerical score: “Puntuación del Licitador = [(45 / 100) x JdV] + [(55 / 100) x EmF]”, where JdV are criteria evaluable mediante juicios de valor (qualitative/technical aspects gathered in envelope B – “Memoria”) weighted 45 %, and EmF are criteria evaluable mediante fórmulas (including economic offer OE and any objectively quantifiable improvements OT in envelope C) weighted 55 %.
It is emphasised that price cannot be the sole factor; qualitative aspects must be objectively formulated, linked to the contract, and verifiable to ensure effective competition.
The tender notice restates that “Oferta económica: Precio” is the formula‑evaluated criterion with 55 points, and “Memoria” is the value‑judgement criterion with 45 points.
Offers must remain valid for 2 months (“Plazo de Validez de la Oferta 2 Mes(es)”).
As for risks and special conditions, the text mentions several elements.
Such as guarantees: a definitive guarantee of 5 % of the contract price and an additional complementary guarantee of 5 % is required (details of form are in the PCAP).
Subcontracting is allowed but subject to the conditions of point 17 of Annex I of the PCAP; if the bidder relies on capacities of other entities, separate DEUC forms are needed and those entities’ technical personnel, especially quality control and works staff, must be identified.
The DEUC content shows the risk of exclusion where there are insolvency procedures, liquidation, convenios con acreedores, assets under a liquidator or court, suspension of business activities, anti‑competitive agreements, serious professional misconduct, early termination or sanctions in prior contracts, or attempts to distort the current procedure (false declarations, concealment of information, undue influence).
There are also obligations for the contractor to allow the contracting authority to access supporting documents; signing the DEUC implies consent for such access.
Execution‑related risks (penalties, detailed guarantees, potential contract modifications) and any site visit or question deadlines are not explicitly quoted in this excerpt; they are indicated as being regulated in the main PCAP and technical specifications (PPTP), which are referenced but not reproduced.
The classification requirement (Grupo C, Subgrupo 3, categoría 4) is consistently stated, as is the exemption for non‑Spanish EU/EEE firms.
The award criteria weights (55 % formulas/price, 45 % judgement/memoria) and the formula are consistently reproduced.
There is no explicit correction that alters a substantive term; where slightly different figures appear, the more detailed justification (two decimal places, 2.838.029,47 €) should be considered the precise value, with the shorter version (2.838.029,4 €) a rounded representation in the notice.
Other operational details (penalties, insurance sums, exact reference requirements, question deadlines, site visit rules) must be taken from the PCAP and PPTP referenced by CSV and expediente numbers, as they are not detailed in the provided text.
Only the contracting authority's tender documents are binding. As of: 19/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SERGLOBIN SLU | 49 | 2020–2026 |
| ALVALOP SERVICIOS XXI, S.L. | 37 | 2023–2026 |
| LOGISTICA INTEGRAL PARA EL AULA, S.L. · PONTE CALDELAS | 32 | 2023–2026 |
| IDIC Consulting, S.L. | 29 | 2021–2026 |
| CARMELO MARTINEZ LÁZARO SLU | 26 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 6 completed awards — not a statement about this procedure.)
This procedure allows 46 days between publication and deadline — typical in this country is 27 (median of 7,300 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,713 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now