How to bid in this country: portals, deadlines, thresholds →
Construction of a bicycle road along the south side of Al. Pokoju
Budowa drogi dla rowerów wzdłuż południowej strony Al. Pokoju — original title
Your path to submission
- Deadline: 9 November at 10:00 — 8 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Description of the subject of the contract (a) The subject of the contract is a construction work consisting in the construction of a bicycle road on the south side of Al. Peace on the section from Rondo Grzegórzecki to Rondo 308 Squadron. As part of the investment, it is necessary to perform, among others: • construction of a road for bicycles, • construction of sections of footpaths and bicycles, • construction and reconstruction of sections of pavements • reconstruction of existing networks of infrastructure in conflict with the investment, • construction of a technological channel, • felling of existing trees and bushes in conflict with the investment • construction of vertical, horizontal markings and road safety devices, • reconstruction of existing traffic lights in connection with the implementation of bicycle crossings. b) The contracting authority described the subject of the…
Show full description
… contract using the following attachments: • Draft provisions of the contract (PPU) constituting Annex 2 to the tender specifications, • Technical Specifications for the Execution and Acceptance of Construction Works (STWiORB) constituting Annex 6 to the tender specifications, • Design documentation constituting Annex 7 to the tender specifications, • Works gauges constituting Annex 8 to the tender specifications, • Supplement to the design documentation constituting Annex 16 to the tender specifications. (c) Temporary organisation of road traffic – specification of item 59 of the road works gauge: 1) This item should include the costs of two information boards on the co-financing of the project from EU funds under the European Funds for Małopolska programme, referred to in §5 sec. 22 PPU. 2) This item should also include the cost of producing and displaying the banner(s) referred to in §5 sec. 15 PPU. The price offer should separate the above-mentioned costs. d) Delivery and installation of 1 unit of a bicycle traffic meter – specification of item No 60 of the volume of road industry works 1) Cycle traffic meters should consist of the following elements (minimum parameters): a) Sensor with an induction loop ensuring the counting of passing cyclists, without distinguishing the direction of travel, and a data recorder with a power battery (battery) and a modem for remote data transmission, b) An application for data handling, with online access, via the www network, using the http protocol, enabling the review and export of data, as well as enabling the visualization of data on any website, including: reading of the number of cyclists counted on the previous day, broken down by hours; - reading the number of cyclists counted for a given calendar year. Full access to data generated and produced by cyclists' counting sets, along with the ability to export data to digital files in formats: csv. c) Perpetual codes enabling automatic updating (once a day) of sensor data on any website. 2) The recorder should provide the following functionality: • automatic, daily data transmission to the data handling panel, • be adapted to work underground and meet the conditions of water resistance, frost resistance and insensitivity to external factors according to the climatic zone constituting the place of installation. 3) The devices should be powered from a battery (battery) with a service life of at least 24 months (a system consisting of max 2 loops). 4) The Contractor should submit a description of the functionality of the offered data handling panel. e) Planting of excavated trees - specification of item No 1.3.2 of the volume of work in the greenery industry - three-year care of replanted trees should be taken into account. f) The Contracting Authority informs that a contract for co-financing the subject of the contract from EU funds has been concluded under: The project entitled Construction of a bicycle road along the south side of Al. Peace co-financed by the EU under the Operational Programme European Funds for Małopolska 2021-2027. g) Required guarantee period: The minimum warranty period is 48 months. The maximum warranty period is 60 months. Offers with a guarantee period of less than 48 months will be rejected. (h)
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (280 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to NDI Spółka Akcyjna.n = 280
- 68% of this buyer's awards went to companies that had already won here before (910 awards since 2018, spread over 217 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 910 awards since 2018
- The median procedure drew 2 bids (174 procedures with a bid count); 44% ended with a single bidder. Sector: median 5 bids.n = 174
- The award came in at a median 57% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 9
- 52% of the bids received came from small and medium-sized enterprises (42 procedures with a bid mix). Sector: 84%.n = 42
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
1) Posiadają wiedzę i doświadczenie, tj. w okresie ostatnich pięciu lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy - w tym okresie zrealizowali co najmniej jedną robotę budowlaną polegającą na: Branża drogowa i.… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Fdelita Piotr Frosztęga | 64 | 2022–2025 |
| Rafał Matusik BPD | 41 | 2022–2025 |
| Artur Maślanka Zakład Elektroinstalacyjny | 33 | 2021–2025 |
| ELENTECH Daniel Wąsik | 32 | 2021–2026 |
| Marta Mardyła Firma Inżynieryjna TECHMA | 32 | 2021–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 26 completed awards — not a statement about this procedure.)
This procedure allows 11 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now