How to bid in this country: portals, deadlines, thresholds →
VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 1 – Safety and health protection (SPS) coordination mission Lot 2 – Technical inspection mission (TC)Lot 3 – Fire safety system coordinator mission (CSSI)
VERSAILLES (78) – SID EPN Satory – Conception, construction, aménagement et maintenance d’un bâtiment de bureaux Lot 1 - Mission de coordination sécurité et de protection de la santé (SPS) Lot 2 - Mission de contrôle technique (CT)Lot 3 - Mission de coordinateur du Système de Sécurité Incendie (CSSI) — original title
Your path to submission
- Deadline: 26 November at 11:00 — 25 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 1 – Safety and health protection (SPS) coordination mission Lot 2 – Technical inspection mission (TC) Lot 3 – Fire safety system coordinator mission (CSSI) – VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 1 – Safety and health protection coordination mission (SPS) – VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 2 – Technical inspection mission (TC) – VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 3 – Fire safety system coordinator mission (CSSI)
Contract
Type of service
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Eligibility analysis from the tender documents
Tender documents — direct download
Part of a larger project
- construction, aménagement et maintenance d’un bâtiment de bureaux Lot 1 - Mission de coordination sécurité et de protection de la santé (SPS) Lot 2 - Mission de contrôle technique (CT)Lot 3 - Mission de coordinateur du Système de Sécurité Incendie (CSSI)Deadline 26 Novthis lot
- constructionDeadline 26 Nov
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| BTP CONSULTANTS SAS | 2 | 2025–2026 |
| Services Environnement Assainissement | 1 | 2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 22,978 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 12,234 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In France · Architecture & engineering, 1,026 contracts went to foreign companies over the last 3 years (of 25,498 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now