Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 1 – SPS – Lot 2 – TC – Lot 3 – CSSI

VERSAILLES (78) – SID EPN Satory – Conception, construction, aménagement et maintenance d’un bâtiment de bureaux Lot 1 - SPS - Lot 2 - CT - Lot 3 - CSSI — original title

FRFrance · Dept. 78

Your path to submission

  1. Deadline: 26 November at 11:00 — 25 days left.
  2. The submission point is stated in the notice (link on this page). Submission via the buyer profile named in the notice (e.g. PLACE/Maximilien): free account required; a signature is usually only demanded from the winning bidder. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

VERSAILLES (78) – SID EPN Satory – Design, construction, fitting-out and maintenance of an office building Lot 1 – Safety and health protection (SPS) coordination mission Lot 2 – Technical inspection mission (TC) Lot 3 – Fire safety system coordinator mission (CSSI)

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuevalue not published
Published29 Oct 2026
ProcedureOUVERT
Place of performanceVersailles

Type of service

71 · Architecture & engineering
CPV 71317210 · 71631300 · 71317100
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Part of a larger project

VERSAILLES (78) – SID EPN Satory – Conception
The same buyer is tendering this project in several lots.
  1. construction, aménagement et maintenance d’un bâtiment de bureaux Lot 1 - SPS - Lot 2 - CT - Lot 3 - CSSIDeadline 26 Novthis lot
  2. constructionDeadline 26 Nov
The deadlines differ — if you offer several trades you can work through them one after another. Matched by buyer and the start of the title; differently named lots may be missing.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
BTP CONSULTANTS SAS22025–2026
Services Environnement Assainissement12026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

4
2025
15
2026
19 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 26 November at 11:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 22,978 completed awards — not a statement about this procedure.)

This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 12,234 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In France · Architecture & engineering, 1,026 contracts went to foreign companies over the last 3 years (of 25,498 recorded awards) — mostly from Germany, Spain, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on BOAMP / profil d'acheteur. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via BOAMP / profil d'acheteur before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now