Dostawa i wdrożenie macierzy blokowego systemu składowania danych wraz z Oprogramowaniem i gwarancją.
Poland · Radom · how to bid here →
Your path to submission
- Deadline: 11 September at 00:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 71% of the bids received came from small and medium-sized enterprises (12 procedures with a bid mix). Sector: 270%.n = 12
- In this sector the buyer awards roughly every 3 months (41 awards, most recently July 2026) — the next award is due around September 2026 by that rhythm. The last award went to Wasko S.A..n = 41
- 17% of this buyer's awards went to companies that had already won here before (642 awards since 2018, spread over 161 companies). That is well below the sector norm (35%) — this buyer switches suppliers more often than others.n = 642 awards since 2018
- The median procedure drew 2 bids (491 procedures with a bid count); 36% ended with a single bidder. Sector: median 3 bids.n = 491
- The award came in at a median 94% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 94%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Poland · Office & computing machinery, 92 contracts went to foreign companies over the last 3 years (of 35,081 recorded awards) — mostly from Germany, France, Greece.
Typical field: median 2 (from 25 awards).
What the buyer is looking for
1. The subject of the contract is: delivery and implementation of the Matrix block data storage system together with the Software and warranty The subject of the contract includes: 1) in the scope of the basic contract: delivery of 2 pcs. Disk arrays with a total NET capacity of 1024 TiB or more to locations: OPR in Radom at ul. Local Government 1, 26-601 Radom with Software, Implementation and Warranty; 2) in the scope of the contract carried out under the option: delivery of 2 pcs. Disk arrays with a total NET capacity of 1024 TiB or more to locations: OPR in Radom at ul. Local Government 1, 26-601 Radom with Software, Implementation and Warranty; 2. The basic contract shall include: 1) execution and delivery of the Technical Project, in accordance with the requirements described in Chapter IV of the OPZ; 2) delivery along with unloading of disk arrays along with the Software, in…
Show full description
… accordance with the requirements described in Section II sec. 1 OIP; 3) Implementation consisting in the installation, configuration of the delivered Equipment and integration with the environment of the Ordering Party, commissioning and conducting acceptance tests, in accordance with the requirements described in Section III sec. 2 OIPs; 4) execution and delivery of as-built Documentation, Operational Procedures and Administrative Procedures, in accordance with the requirements described in Chapter IV of the OPZ; 5) conducting training for persons indicated by the Ordering Party in accordance with the requirements described in Chapter V of the OPZ; 6) granting the Contractor's warranty and providing the manufacturer's warranty for the delivered Equipment for a period of not less than 36 months (the warranty period is the criterion for evaluating offers) from the date of signing the Implementation Acceptance Protocol without reservations, in accordance with the requirements described in Chapter VII of the OPZ. 3. The option contract shall include: 1) execution and delivery of the Technical Project, in accordance with the requirements described in Chapter IV of the OPZ; 2) delivery along with unloading of disk arrays in accordance with the requirements described in Section II sec. 1 OIP; provided that the Matrixes must be of the same model and manufacturer as the Matrixes supplied under the basic order; 3) Implementation consisting in the installation, configuration of the delivered Equipment and integration with the environment of the Ordering Party, commissioning and conducting acceptance tests, in accordance with the requirements described in Chapter III, paragraph 2 of the OPZ; 4) Updating the as-built documentation, operational procedures and administrative procedures provided under the basic contract, in accordance with the requirements described in Chapter IV of the OPZ; 5) granting the Contractor's warranty and providing the manufacturer's warranty for the delivered Equipment for a period of not less than 36 months (the warranty period is a criterion for evaluating offers) from the date of signing the Implementation Acceptance Protocol without reservations, in accordance with the requirements described in Chapter VII of the OPZ. 4. the subject of the contract is specified in detail in the FTZ.
What you must prove — eligibility criteria
Wykonawca spełni warunek udziału w postępowaniu w zakresie zdolności technicznej lub zawodowej jeżeli wykaże, że wykonał, a w przypadku świadczeń powtarzających się lub ciągłych wykonuje, w okresie ostatnich 3 lat przed upływem terminu składania ofert, a jeżel… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| IT Solution Factor Sp. z o. o. | 11 | 2024–2026 |
| Comtegra S.A. | 10 | 2024–2026 |
| BIPROGEO Sp. z o.o. | 9 | 2024–2025 |
| Suntar Sp. z o.o. | 8 | 2024–2026 |
| PASSUS S.A. | 7 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.