Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
France · BESANCON · how to bid here →
Your path to submission
- Deadline: 12 October at 00:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA, FRA, FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 65% of the bids received came from small and medium-sized enterprises (46 procedures with a bid mix). Sector: 379%.n = 46
- The median procedure drew 4 bids (213 procedures with a bid count); 8% ended with a single bidder. Sector: median 6 bids.n = 213
- 0% of the bids received came from other countries (46 procedures with a bid mix) — all bidders, not just the winners. Sector: 18%.n = 46
- The award came in at a median 93% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 72%.n = 9
- 17% of this buyer's awards went to companies that had already won here before (321 awards since 2019, spread over 169 companies). 83% went to new names.n = 321 awards since 2019
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In France · Construction work, 1,589 contracts went to foreign companies over the last 3 years (of 44,658 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 5 (from 4 awards).
What the buyer is looking for
Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA, FRA, FRA, FRA, FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BASSIGNY POIDS LOURDS | 3 | 2022–2024 |
| EIFFAGE ENERGIE SYSTEMES | 2 | 2025 |
| ROGER MARTIN | 2 | 2020–2024 |
| ESKA DERICHEBOURG | 2 | 2025 |
| HEINRICH CANALISATION SAS | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.