EU_Machbarkeitsstudie Querverbindung Horrem Erftstadt
Germany · Köln · how to bid here →
Your path to submission
- Deadline: 9 October at 00:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 6 months (7 awards, most recently October 2025) — by that rhythm the next award was due around April 2026. The last award went to quattron GmbH.n = 7
- 53% of this buyer's awards went to companies that had already won here before (18 awards since 2023, spread over 9 companies). 47% went to new names.n = 18 awards since 2023
- The median procedure drew just one bid (14 procedures with a bid count); 71% ended with a single bidder. Sector: median 2 bids.n = 14
- From notice to award takes a median 73 days here (5 procedures). Sector: 117 days.n = 5
- Not one of the 18 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Architecture & engineering, 386 contracts went to foreign companies over the last 3 years (of 108,077 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 1 (from 7 awards).
What the buyer is looking for
Die Auftraggeberin sucht einen Gutachter bzw. mehrere Gutachter im Sinne einer Bieterge-meinschaft, welcher bzw. welche drei räumlich vorgegebenen Varianten eines Trassenverlaufs für die Querverbindung Kerpen-Horrem - Erftstadt untersucht und dabei: A.) Potentialanalysen erstellt, B.) die betriebliche und technische Machbarkeit für die zwei besten Varianten aus der Potenti-alanalyse prüft, C.) eine Nutzen-Kosten-Analyse inklusive standardisierte Bewertung für die beste Variante aus der technischen und betrieblichen Machbarkeitsprüfung erstellt.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DB Engineering & Consulting GmbH · Berlin | 3 | 2025 |
| quattron GmbH · Bamberg | 3 | 2025 |
| Cleverciti Systems | 2 | 2026 |
| ifok GmbH · Bensheim | 2 | 2024 |
| kobra Nahverkehrsservice GmbH · Kassel | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.