Réalisation de travaux d'investissement et de maintenance sur le patrimoine Régional et autres
France · Basse-Terre · how to bid here →
Your path to submission
- Deadline: 1 October at 00:00 — 22 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 9% of this buyer's awards went to companies that had already won here before (335 awards since 2014, spread over 196 companies). That is well below the sector norm (26%) — this buyer switches suppliers more often than others.n = 335 awards since 2014
- The median procedure drew 4 bids (80 procedures with a bid count); 13% ended with a single bidder. Sector: median 6 bids.n = 80
- 16% of awards went to companies from abroad (335 awards with a known winner country). Sector average: 4%.n = 335
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In France · Construction work, 1,589 contracts went to foreign companies over the last 3 years (of 44,658 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 6 (from 23,732 awards).
What the buyer is looking for
La réalisation de travaux d'investissement et de maintenance, répartie en 17 lots techniques par zone géographique (4). Soit un total de 68 lots
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA, FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SOGETRA | 4 | 2015–2019 |
| SOTRADOM | 3 | 2016 |
| SEM PATRIMONIALE | 3 | 2015–2020 |
| AZUR EQUIPEMENTS | 3 | 2015–2018 |
| INGENI'EAUX | 2 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.