Renovare integrată - Reabilitare imobil strada Domnească nr.24 – Iluminat Arhitectural – Lucrări suplimentare
Romania · how to bid here →
Your path to submission
- Deadline: 23 September at 12:00 — 15 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.
Clement What the numbers say about this buyer
- 248% of the bids received came from small and medium-sized enterprises (204 procedures with a bid mix). Sector: 168%.n = 204
- In this sector the buyer awards roughly every 2 months (261 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to S.C. DREAMS RIVIERA S.R.L.n = 261
- 52% of this buyer's awards went to companies that had already won here before (867 awards since 2021, spread over 238 companies). 48% went to new names.n = 867 awards since 2021
- The median procedure drew 3 bids (325 procedures with a bid count); 22% ended with a single bidder. Sector: median 4 bids.n = 325
- 5% of awards went to companies from abroad (867 awards with a known winner country). Sector average: 0%.n = 867
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.
Foreign bidders
In Romania · Construction work, 157 contracts went to foreign companies over the last 3 years (of 62,783 recorded awards) — mostly from France, Italy, Germany.
Typical field: median 3 (from 126 awards).
Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.
Contract
BuyerMunicipiul Galati
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published7 September 2026
CategoryConstruction work · CPV 45310000
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SC IZOTERM CONSTRUCT SRL | 19 | 2024–2026 |
| ROVAL PRINT | 18 | 2024 |
| PASSIFLORA GARDEN DESIGN | 15 | 2024 |
| SIMACONS NBA | 15 | 2024–2026 |
| BOGADENT89 SRL | 15 | 2024–2026 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.
How often this buyer tenders this
202497
202579
202639
Who knows the rhythm prepares instead of reacting.
·
days until the deadline — Wednesday 23 September at 12:00
How to bid
Read the full notice — Original + documents
Goes directly to this tender on SICAP / e-licitatie. The full specification and all annexes are there.
Tenders like this, every morning at 7:30 in your inbox.
Register now →