Friedrich & ClementBETA

Construction work: Romania

384 open tenders

Thermoenergetic rehabilitation at GN Sulina headquarters
Garda de Coasta3.078.210 RONBELOW THRESHOLDDeadline 7 Oct ·
Execution of works on investment objectives: LOT 1: "Making viable low pressure natural gas pipeline in Gilau commune, Gilau locality, Paltinilor street, Rastoci street, Trandafirilor street, Pepinierei street, Miraslau street", LOT 2: "MAKING VIABLE LOW PRESSURE NATURAL GAS PIPELINE" and LOT 3: "Extension of medium pressure gas network in Somesul Rece tourist area"
Comuna GilauBELOW THRESHOLDDeadline 7 Oct ·
Execution of works for the objective "Extension of natural gas distribution network in the villages of Cireșeni, Zbereni, Făgat, Hodora, Bahlui, Iosupeni and Cotnari in Cotnari Commune, Iași County"
UAT Comuna CotnariBELOW THRESHOLDDeadline 7 Oct ·
Execution of works within the project Modernization of streets left bank, Prospect area, Sulina city, Tulcea county – remaining work to be executed
ORASUL SULINABELOW THRESHOLDDeadline 7 Oct ·
Execution of works for the deviation of electrical networks according to the coexistence study for the investment objective: "Ensuring traffic mobility through the extension of the road and public transport link between South Station and West Station (Libertății Street), including works for the rehabilitation of the public domain of the station squares-V-26-P014"
DISTRIBUȚIE ENERGIE ELECTRICĂ ROMANIA S.A.BELOW THRESHOLDDeadline 7 Oct ·
Design and Execution of Electrical Connections within the investment objective: "Extension of the domestic wastewater sewerage network in the city of Flămânzi and the villages of Chitoveni and Prisacani, Botoșani County" – Technical documentation and execution of works at connection tariff rate, for electrical power supply to the investment objective –
ORASUL FLAMANZIDeadline 7 Oct ·
Execution of works for the investment objective "Rehabilitation and modernization of school building "School no. 1", Broscăuți commune, Botoșani county"
COMUNA BROSCAUTI (CONSILIUL LOCAL BROSCAUTI BOTOSANI)BELOW THRESHOLDDeadline 7 Oct ·
WORKS CONTRACT: "OIL PRODUCT TANKS R103, R104, R105, R106, R108 and R109 - painting works and waterproofing on tank covers"
Administratia Nationala a Rezervelor de Stat si Probleme Speciale - Unitatea Teritoriala 140BELOW THRESHOLDDeadline 7 Oct ·
Services for the preparation of the technical design and execution details, technical quality check of the technical design, technical assistance and execution of works related to the investment objective ‘GREEN PROMENADA’ – Object No 2 – Renovation, rehabilitation and consolidation of the shores of Lake Grivita
Sector 1 (Sectorul 1 al municipiului Bucuresti)269.090.089 RONDeadline 7 Oct ·
Regional project for the development of water and wastewater infrastructure in Mureș County, Lot 1-3
COMPANIA AQUASERV S.A75.888.633 RONDeadline 7 Oct ·
EXECUTION OF WATER SUPPLY NETWORKS AND SEWERAGE NETWORKS IN THE CITY OF HOREZU -VL -CL- 05
APAVIL SA42.264.490 RONDeadline 7 Oct ·
Intervention works to improve energy efficiency for residential building, block 24 on 8 Martie Street, Petrila city, Hunedoara county, SMIS CODE 354829
ORASUL PETRILA4.007.479 RONDeadline 7 Oct ·
Regional project for the development of water and wastewater infrastructure in Mureș County, Lot 1-3
COMPANIA AQUASERV S.A75.888.633 RONDeadline 7 Oct ·
DESIGN AND EXECUTION LOT 1: Bridge on DN 6 km 268+371 at Arginesti LOT 2: Modernization Bridge on DN 15 km 304+680 at Viisoara
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.127.939.019 RONDeadline 7 Oct ·
Services for the preparation of technical design and execution details, technical quality verification of the technical design, technical assistance and execution of works related to the investment objective "PROMENADA VERDE" – Object no. 2 - Renovation, rehabilitation and consolidation of the shores of Lake Grivița
Sector 1 (Sectorul 1 al municipiului Bucuresti)269.090.089 RONDeadline 7 Oct ·
Modernization of pump stations behind dikes within SH. Rm. Vâlcea: "SP Topolog from CHE Babeni, SP Bratia from CHE Babeni, SP Bistrita from CHE Babeni, SP Olanu from CHE Ionesti, SP Oltet from CHE Ipotesti, SP Poganu from CHE Strejesti, SP Teslui from CHE Arcesti, SP Teslui – Farcasele from CHE Draganesti"
SPEEH HIDROELECTRICA SA43.107.318 RONDeadline 7 Oct ·
Execution of works related to the investment objective "Demolition and construction of Building C2, C3 and C4, Nicolae Simonide Secondary School, 9 Mai Street, no. 50, Pitești Municipality, Argeș County"
MUNICIPIUL PITESTI - CONSILIUL LOCAL AL MUNICIPIULUI PITESTIBELOW THRESHOLDDeadline 8 Oct ·
Execution works for the project: "MODERNIZATION OF PUBLIC LIGHTING IN BATAR COMMUNE, BIHOR COUNTY"
COMUNA BATARBELOW THRESHOLDDeadline 8 Oct ·
Completion of execution of works for the investment objective: Rehabilitation, modernization, expansion and equipping of the cultural establishment in Năsturelu commune, Năsturelu village, Teleorman county - 6787
COMPANIA NATIONALA DE INVESTITII SABELOW THRESHOLDDeadline 8 Oct ·
Design and execution of works for the investment objective "EXTENSION OF WATER SUPPLY SYSTEM AND EXTENSION OF DOMESTIC SEWERAGE SYSTEM, STOLNICENI-PRĂJESCU COMMUNE, IAȘI COUNTY"
Comuna Stolniceni Prajescu IasiBELOW THRESHOLDDeadline 8 Oct ·
ARRANGEMENT OF SIDEWALKS, ACCESS CULVERTS AND CONCRETE DITCHES ON DJ702F (SAULESCU STR.) IN RASCAETI COMMUNE, DAMBOVITA COUNTY
COMUNA RASCAIETI (PRIMARIA RASCAETI DAMBOVITA)BELOW THRESHOLDDeadline 8 Oct ·
"ARRANGEMENT OF THE TÂRNAVA MARE RIVERBANK IN THE CENTRAL PARK AREA-BUDVÁR ZONE, BICYCLE PATH AND PEDESTRIAN ALLEY – SMIS Code 363555"
MUNICIPIUL ODORHEIU SECUIESC (PRIMARIA MUNICIPIULUI ODORHEIU SECUIESC)BELOW THRESHOLDDeadline 8 Oct ·
EXTENSION OF H.M.TEUTSCH ARTS HIGH SCHOOL - rev.1 - DTAC, PT and works execution
MUNICIPIUL BRASOVBELOW THRESHOLDDeadline 8 Oct ·
EXECUTION OF WORKS FOR THE INVESTMENT "MODERNIZATION OF THE PUBLIC STREET LIGHTING SYSTEM IN SANNICOLAU MARE CITY - TIMIS COUNTY"
Orasul Sannicolau MareBELOW THRESHOLDDeadline 8 Oct ·
EXTENSION OF KINDERGARTEN NO.26 - rev.1- DTAC Update, PT and Execution of Works
MUNICIPIUL BRASOVBELOW THRESHOLDDeadline 8 Oct ·
Works for reflooring the machinery room at CHE Scoreiu and CHE Vistea
SPEEH HIDROELECTRICA SABELOW THRESHOLDDeadline 8 Oct ·
ENERGY EFFICIENCY OF PRIMARY SCHOOL AND HOSTEL in Obarsia Closani village, Obarsia Closani commune, Mehedinti county
Comuna Obirsia Closani (Primaria com. Obirsia Closani)BELOW THRESHOLDDeadline 8 Oct ·
Repair works on the cold funnel of the evaporator related to the pressurized system energy group no. 4 ROVINARI
Societatea COMPLEXUL ENERGETIC OLTENIA SABELOW THRESHOLDDeadline 8 Oct ·
Air conditioning system installation for sports hall – High School with Sports Program Iași
Liceul cu Program Sportiv IasiBELOW THRESHOLDDeadline 8 Oct ·
Execution of works for the investment objective "Rehabilitation of fencing, rehabilitation of gardens, compartmentalization and arrangement of showers at Carcea Sports Base and Realization of borehole and Water supply system, pumping station, basin at Carcea Sports Base"
CLUBUL SPORTIV CARCEABELOW THRESHOLDDeadline 8 Oct ·
Execution of works for the investment objective "REINFORCED CONCRETE BRIDGE AND RIVERBED CALIBRATION ON THE TELEORMAN RIVER, IONEȘTI VILLAGE, BUZOEȘTI COMMUNE, ARGEȘ COUNTY"
COMUNA BUZOIESTIBELOW THRESHOLDDeadline 8 Oct ·
Design and execution services for the project "CREstarea eficieNtei energetice in cadrul Liceului de Arta Marin Sorescu R.E.N.O.V.-ARTa Craiova Corp C1 si Corp C2" SMIS Code 355784
Municipiul Craiova22.405.239 RONDeadline 8 Oct ·
Preparation of Technical Project and Execution of Works for Bucharest Ring Motorway, km 0+000 – km 100+900, Northern Ring sector km 0+000 - 52+770 (Provision of all traffic relations at the road junction on DN7 (km 9+400) with Motorway A0)
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.41.037.682 RONDeadline 8 Oct ·
Execution of works for the objective ‘Energy efficiency of residential buildings in Lupeni Municipality, Block F3, Bucura Street’ SMIS Code 348068
Municipiul Lupeni3.392.320 RONDeadline 8 Oct ·
The subject of the procurement is the execution of construction works related to the project: "PROMOTION OF ENERGY EFFICIENCY AND REDUCTION OF GREENHOUSE GAS EMISSIONS THROUGH INVESTMENTS IN PUBLIC BUILDINGS: "HUMAN DISPENSARY LOCATED IN PETRESTI VILLAGE, CORBII MARI COMMUNE, DAMBOVITA COUNTY"
COMUNA CORBII MARI (PRIMARIA CORBII MARI)BELOW THRESHOLDDeadline 9 Oct ·
DESIGN AND EXECUTION OF A LONG-TERM TECHNOLOGICAL SYSTEM FOR DRAINAGE OF GROUNDWATER FROM THE WESTERN COVER HILL OF TURDA SALT MINE
SOCIETATEA SALINA TURDA SABELOW THRESHOLDDeadline 9 Oct ·
EXECUTION OF WORKS FOR THE INVESTMENT "MODERNIZATION OF THE PUBLIC STREET LIGHTING SYSTEM IN RUGINOASA COMMUNE, IASI COUNTY"
COMUNA RUGINOASA (PRIMARIA RUGINOASA JUD IASI)BELOW THRESHOLDDeadline 9 Oct ·
EXECUTION OF WORKS for the investment objective: BUILDING ANNEX, FENCING, ARRANGEMENTS AND EXTERNAL NETWORKS AT THE INVESTMENT OBJECTIVE "CONSTRUCTION FOR FUNERAL CEREMONIES MOCOD"
COMUNA NIMIGEABELOW THRESHOLDDeadline 9 Oct ·
Increasing the energy efficiency of the Cristuru Secuiesc kindergarten building
ORASUL CRISTURU SECUIESCBELOW THRESHOLDDeadline 9 Oct ·
Design and execution services for electrical network relocation works, necessary for the electrical connection of the new fire department sub-unit in Pecica implemented through the project "Construction of fire department sub-unit Pecica within the Emergency Situations Inspectorate of Arad County"
INSPECTORATUL PENTRU SITUATII DE URGENTA VASILE GOLDIS AL JUDETULUI ARAD191.563 RONDeadline 9 Oct ·
MODERNIZATION OF CITY HALL HEADQUARTERS – ADDITIONAL WORKS
Primaria Orasului ghimbavBELOW THRESHOLDDeadline 9 Oct ·
Execution of works for the implementation of the investment objective regarding "MODERNIZATION OF MOIECIU DE JOS - MĂGURA COMMUNAL ROAD (GODEANU ROAD)"
Primaria Comunei MoieciuBELOW THRESHOLDDeadline 9 Oct ·
Repairs of building in Pârâul Negru district, OS Brodina - dssv
REGIA NATIONALA A PADURILOR - ROMSILVA RABELOW THRESHOLDDeadline 9 Oct ·
INCREASING ENERGY EFFICIENCY OF PUBLIC LIGHTING INFRASTRUCTURE IN UAT PIETROSANI COMMUNE, ARGES COUNTY
PRIMARIA COMUNEI PIETROSANIBELOW THRESHOLDDeadline 9 Oct ·
Restoration, consolidation and enhancement works of the historical monument "RESTORATION OF THE ROMAN-CATHOLIC CHURCH OF SAINT NICHOLAS IN ODORHEIU SECUIESC AND LAND ARRANGEMENT"
Parohia Romano Catolica Odorheiu SecuiescBELOW THRESHOLDDeadline 9 Oct ·
Design services, technical assistance from the designer and execution of works in order to carry out the project ‘Establishment of the natural gas distribution network in the communes of Scheia and Mironeasa in Iasi County’
ASOCIATIA DE DEZVOLTARE INTERCOMUNITARA PENTRU DEZVOLTAREA RETELELOR DE GAZE NATURALE IN COMUNELE SCHEIA SI MIRONEASA31.723.573 RONDeadline 9 Oct ·
Acquisition of work execution services for the objective "Rehabilitation works at the fuel and lubricant storage depot in barracks 962 Bascov" project code 2020 –C/I – 962 Bascov
MINISTERUL APARARII - U.M. 02517 CRAIOVA102.577.674 RONDeadline 9 Oct ·
Construction of depots and modernization/establishment of passenger stations, SMIS code 337790
MUNICIPIUL ROMAN24.112.972 RONDeadline 9 Oct ·
Execution of Works for the investment objective - "Multifunctional Complex - Multipurpose Hall Brașov Municipality, Brașov County" Additional Works - ID 3840
COMPANIA NATIONALA DE INVESTITII SADeadline 12 Oct ·
Execution of works within the project "Energy efficiency of residential buildings in the city of Petrila - block 10 from December 22 Street", SMIS code 345643
ORASUL PETRILA2.994.782 RONDeadline 12 Oct ·
"ASPHALTING OF STREETS AND SIDE ALLEYS, LEREȘTI COMMUNE, ARGEȘ COUNTY"
COMUNA LERESTI (PRIMARIA COMUNEI LERESTI)BELOW THRESHOLDDeadline 12 Oct ·
Works for carrying out connections at the level of Cluj County
DISTRIBUȚIE ENERGIE ELECTRICĂ ROMANIA S.A.BELOW THRESHOLDDeadline 12 Oct ·
Execution of works within the project "DEMOLITION OF PRIMARY AND PRESCHOOL SCHOOL BUILDING AND CONSTRUCTION OF A KINDERGARTEN IN IEGHERIȘTE NR. 2 LOCALITY, SATU MARE COUNTY"
COMUNA CRUCISORBELOW THRESHOLDDeadline 12 Oct ·
INTEGRATED RENOVATION OF THE KINDERGARTEN IN IZVORU DULCE LOCALITY, MEREI COMMUNE, BUZAU COUNTY
COMUNA MEREIBELOW THRESHOLDDeadline 12 Oct ·
REHABILITATION AND MODERNIZATION OF P+2 BUILDING, CHANGE OF DESTINATION TO DAY CENTER - THERAPEUTIC COMMUNITY FOR CHILDREN IN TĂUȚII MĂGHERĂUȘ CITY, MARAMUREȘ COUNTY within the project "THERAPEUTIC COMMUNITY FOR CHILDREN" SMIS code 335786
ASOCIATIA PROFESIONALA NEGUVERNAMENTALA DE ASISTENTA SOCIALA ASSOCBELOW THRESHOLDDeadline 12 Oct ·
General repair and renovation works, design and installation of ventilation system, fire detection system, lighting installation at hydrogen, oxygen, acetylene storage building
Societatea Nationala de Gaze Naturale Romgaz S.A.1.793.000 RONDeadline 12 Oct ·
Works for the implementation of connections at the level of Galati County
DISTRIBUȚIE ENERGIE ELECTRICĂ ROMANIA S.A.BELOW THRESHOLDDeadline 12 Oct ·
Completion of works – CONSTRUCTION OF NEW ROADS AND ACCESS PATHS, EXTERNAL NETWORKS, PUMPING STATION AND RELATED ELECTRICAL INSTALLATIONS for the investment objective "Modernization, rehabilitation and equipping of the Outpatient Clinic of Pneumology Sections I and II within Drobeta Turnu Severin County Emergency Hospital"
JUDETUL MEHEDINTIBELOW THRESHOLDDeadline 12 Oct ·
Works for MODERNIZATION, EXTENSION AND CONSOLIDATION OF BUILDING within the project "NATIONAL PLATFORM FOR SEMICONDUCTOR TECHNOLOGIES"
INSTITUTUL NATIONAL DE CERCETARE DEZVOLTARE PENTRU TEHNOLOGII IZOTOPICE SI MOLECULARE7.790.273 RONDeadline 12 Oct ·
Design and execution "Pantelimon Road Junction (A0 - km 48) A0 North sector"
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.162.816.653 RONDeadline 12 Oct ·

Frequently asked

How many Construction work tenders are currently open in Romania? 384 open tenders with running deadlines, updated daily — including sub-threshold tenders that never appear on TED.
Can I bid without a limited company? Yes — sole traders and freelancers may bid on any public tender (Art. 19 Dir. 2014/24/EU). More in the guide →
Can a foreign company bid in Romania? Yes, EU-wide — home-country evidence and references count fully.