Proiectare si executie „Nod Rutier Pantelimon (A0 - km 48) sectorul A0 Nord”
Romania · how to bid here →
Your path to submission
- Deadline: 12 October at 12:00 — 35 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 79% of this buyer's awards went to companies that had already won here before (2,613 awards since 2024, spread over 542 companies). That is well above the sector norm (55%) — newcomers have a harder time here than elsewhere.n = 2,613 awards since 2024
- The median procedure drew 3 bids (735 procedures with a bid count); 16% ended with a single bidder. Sector: median 4 bids.n = 735
- The award came in at a median 93% of the estimated value (64 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 64
- 11% of the bids received came from other countries (732 procedures with a bid mix) — all bidders, not just the winners. Sector: 6%.n = 732
- Across 59 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (59 of 59), Share of subcontractors (59 of 59), Independent quality certificate (e.g. ISO 9001) (49 of 59), Minimum annual turnover (44 of 59).n = 59
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Romania · Construction work, 157 contracts went to foreign companies over the last 3 years (of 52,838 recorded awards) — mostly from France, Italy, Germany.
Typical field: median 4 (from 257 awards).
What the buyer is looking for
II.1.4 Descrierea succinta a contractului sau a achizitiei/achizitiilor Obiectul contractului il reprezinta proiectarea si executia Nodului Rutier Pantelimon (A0 - km 48) sectorul A0 Nord, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificarile si completarile ulterioare, termenul limita pana la care orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este cu 25 zile inainte de termenul limita de depunere a ofertelor. In conformitate cu prevederile art. 160 alin. (2) din Legea 98/2016 cu modificarile si completarile ulterioare, Autoritatea Contractanta stabileste un singur termen limita in care va raspunde tuturor solicitarilor de clarificare/ informatiilor…
Show full description
… suplimentare, dupa cum urmeaza: cu 12 zile inainte de termenul limita de depunere a ofertelor. Termenul de raspuns la clarificari a fost stabilit astfel incat operatorii economici sa aiba o perioada adecvata pentru analizarea documentatiei de atribuire si, ulterior, pentru elaborarea ofertelor prin prisma raspunsurilor oferite de Autoritatea Contractanta.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Operatorii economici ce depun oferta trebuie sa dovedeasca o forma de inregistrare in conditiile legii din tara de rezidenta, din care sa reiasa ca operatorul economic este legal constituit, ca nu se afla in niciuna din situatiile de anulare a constituirii, pr… ▸▾
Ofertantul trebuie sa demonstreze ca cifra de afaceri anuala totala a fost de minim 35.000.000 Lei in fiecare dintre exercitiile financiare aferente anilor 2023, 2024 si 2025. Nota 1: Daca un grup de operatori economici depune o oferta comuna, cerinta se demon… ▸▾
Ofertantul trebuie sa demonstreze ca a dus la bun sfarsit* in ultimii 5 ani** lucrari de constructie noua si/ sau modernizare si/sau largire de drumuri nationale si/sau drumuri expres si/sau autostrăzi care au inclus cel putin un pod/ pasaj/ viaduct/ intersect… ▸▾
Ofertantul trebuie sa demonstreze ca a dus la bun sfarsit* in ultimii 5 ani** servicii de elaborare si/ sau actualizare si/ sau revizuire de Studii de Fezabilitate si/ sau Proiecte Tehnice si/ sau [Proiecte Tehnice si Detalii de Executie]*** pentru lucrari de … ▸▾
Ofertantul trebuie sa demonstreze ca are la dispozitie/are acces la urmatoarele utilaje, instalatii si echipamente tehnice pentru executia lucrarilor: • Autobasculante – 5 buc; • Autobetoniere – 2 buc; • Excavatoare – 2 buc; • Cilindri compactori straturi fund… ▸▾
Ofertantul va preciza categoriile de servicii/ lucrari din contract pe care intentioneaza sa o/le subcontracteze. In cazul in care Ofertantul va subcontracta o parte din contract, Ofertantul are obligatia de a completa, DUAE- sectiunea "Criteriile de selectie"… ▸▾
Cerinta 1: Ofertantul trebuie sa faca dovada implementarii sistemului de management al calitatii conform SR EN ISO 9001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului. MODALITATI DE INDEPLINIRE Ofertantul/… ▸▾
Cerinta 2: Ofertantul trebuie sa faca dovada implementarii sistemului de management al mediului conform SR EN ISO 14001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului. MODALITATI DE INDEPLINIRE Ofertantul/… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LOIAL IMPEX | 78 | 2024–2026 |
| OYL COMPANY HOLDING AG S.R.L. | 68 | 2024–2026 |
| VESTA INVESTMENT | 63 | 2024–2026 |
| SC EDIL CONTRACT SRL | 62 | 2024–2026 |
| TRANSPOL SERVICE | 60 | 2024–2026 |
How often this buyer tenders this