Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Conversion of archive room to offices in the administration building Haus II, Friedrich-Ebert-Ring 92b,...

Umbau Archivraum zu Büros im Verwaltungsgebäude Haus II, Friedrich-Ebert-Ring 92b,... — original title

DEGermanyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 20 November at 11:00 — 19 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published22 Oct 2026
ProcedureÖffentliche Ausschreibung
Place of performance14712 Rathenow

Type of service

45 · Construction work
CPV 45311200

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (22 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to objekt + raum ausbausysteme GmbH.n = 22
  • 56% of this buyer's awards went to companies that had already won here before (82 awards since 2017, spread over 37 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 82 awards since 2017
  • The median procedure drew 3 bids (82 procedures with a bid count); 21% ended with a single bidder. Sector: median 4 bids.n = 82
  • 100% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 87%.n = 5
  • Across 12 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (12 of 12), Professional register enrolment (12 of 12), Special authorisation or membership required (12 of 12), Share of subcontractors (11 of 12).n = 12

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Public tender: Elektroarbeiten Umbau Archivraum zu Büros, Landkreis Havelland (DI-ZVSt-LH-10/2026)

The input text concerns a German public construction tender under VOB/A for electrical works in the Landkreis Havelland (Brandenburg, Germany).

It reflects the point of view of a German public contracting authority applying the Brandenburgisches Vergabegesetz (BbgVergG), the VOB/B and VOB/C, and German tax and labour law (e.g.

Mindestlohngesetz, Schwarzarbeitsbekämpfungsgesetz).

The documents define what must be submitted with the bid, how the contract is structured and performed, what legal and contractual obligations apply, and how bidders and their subcontractors must demonstrate compliance and suitability.

Such as regarding bidder submissions, the “Verzeichnis vorzulegender Unterlagen” (1.02) and the list of “Anlagen – Dokumente mit dem Angebot einzureichen” specify the core offer components.

With the offer, bidders must submit at minimum: the Angebotsschreiben (2.01), the priced Leistungsverzeichnis/Angebotsdatei (pdf or d.84/x.84), FB‑2‑02 Eigenerklärung zur Eignung (or PQ number instead), FB‑3‑06 Vereinbarung Einhaltung Mindestanforderungen BbgVergG, and—if applicable—FB‑3‑03 Bietergemeinschaftserklärung, FB‑3‑04 Eigenerklärung Unterauftragnehmerleistungen, FB‑3‑05 Eigenerklärung Eignungsleihe.

Price calculation must be documented via Formblatt 221 (Zuschlagskalkulation) or 222 (Kalkulation über die Endsumme) plus Formblatt 223 Aufgliederung der Einheitspreise and the Urkalkulation.

On request, further forms are required: FB‑4‑03 Eigenerklärung zur Eignung_Unterauftragnehmer, FB‑4‑04 Verpflichtungserklärung Unterauftragnehmereinsatz, FB‑4‑05 Verpflichtungserklärung Eignungsleihe, FB‑4‑06 Vereinbarung Einhaltung Mindestanforderungen BbgVergG_Unterauftragnehmer.

Under “unternehmensbezogene Unterlagen”, the authority can demand at least: reference list (min. 3 comparable works in last 5 years), proof of registration (Gewerbeanmeldung, Handelsregister, Handwerksrolle/IHK), current (age-limited) certificates from Sozialkasse/Krankenkasse, Berufsgenossenschaft, Finanzamt, Freistellungsbescheinigung §48b EStG, and, where relevant, self-cleaning documentation, insolvency plan, and Eignungsnachweise for Nachunternehmer.

Eigenerklärungen also require information on exclusion grounds (§6e EU VOB/A), insolvency status, tax/social payment compliance, turnover (last 3 years) and workforce (on request).

Such as regarding the scope of the contract, the documents define the project as “Umbau Archivraum zu Büros im Verwaltungsgebäude Haus II, Friedrich‑Ebert‑Ring 92b, 14712 Rathenow – Elektroarbeiten/Elektrotechnik”.

Show all 37 statements

The place of performance is clearly the administrative building “Haus II” of Landkreis Havelland in Rathenow.

The special conditions specify the execution period: start of works on 18.01.2027 and completion (abnahmereife Fertigstellung) by 14.05.2027; these dates are contractual (Vertragsfristen) under §5 VOB/B, supplemented by further Einzelfristen from a Bauzeitenplan.

Quantities and technical details are contained in the Leistungsverzeichnis (not reproduced here but referenced as 2.02 LV).

Multiple Hauptangebote are expressly allowed; Nebenangebote are allowed for the entire scope, provided they meet qualitative/quantitative equivalence and are fully broken down in quantities and unit prices, including Gleichartigkeitsnachweis for alternative products or variants.

Offers may be submitted electronically (Vergabemarktplatz Brandenburg via Bietertool) or in writing; for any postal components, an “Angebotskennzettel” with the deadline (20.11.2026, 11:00, opening 11:05) is provided.

Such as regarding award criteria and weighting, the text mainly sets formal framework but does not explicitly list detailed point-based award criteria or their weighting.

It confirms that VOB/B and VOB/C form part of the contract and that Urkalkulation, price breakdowns (Formblätter 221/222/223) will be used in evaluation and for later contractual control.

Nebenangebote must be qualitatively and quantitatively equal to the base description; this implicitly affects their evaluation.

There is no explicit mention of qualitative scoring criteria (e.g. concept, quality, sustainability) or numeric weighting between price and quality in the provided excerpts; thus, it can be inferred that, under typical VOB/A practice, price will be central, but the documents here mostly regulate admissibility and transparency of offers rather than a detailed scoring system.

Such as concerning risks and special conditions, the “Besondere Vertragsbedingungen” and the BbgVergG‑Mindestentgeltvereinbarungen impose several obligations.

Contractual penalties (Vertragsstrafen) apply for delay: per §11 VOB/B and the special clause, a daily percentage of the objectively correct Abrechnungssumme (net) is payable for each day of delay in contractual interim milestones and completion; total penalties are capped at 5 % of the net settlement sum, or 3 % if only interim deadlines are breached but the final completion date is met.

Additional, separate contractual penalties under BbgVergG apply: for each proven case of underpayment or refusal of controls, a penalty of 1 % of the Auftragssumme (max. 25,000 € per case; overall max. 5 %, 250,000 €) can be claimed, also mirrored for Nachunternehmer/Verleiher.

The authority may impose an Auftragssperre (exclusion from competitions up to three years) and reports to a central Sperrliste; self-cleaning may reduce this.

Security for contract performance: generally waived, but if the Auftragssumme is ≥ 250,000 € (net), a 5 % performance security is required (§17 VOB/B) using the authority’s standard Bürgschaft form; for defects, a 3 % security is always required above an Abrechnungssumme of 35,000 € brutto, via retention or Mängelansprüchebürgschaft.

The contractor must accept a pauschaler Schadensersatz of 15 % of the gross contract sum if proven to have participated in anticompetitive collusion, save for evidence of lower damage.

Further special cost risks: a 0.34 % surcharge on the gross settlement sum for Baustrom/Bauwasser consumption and a 0.12 % share of the Bauleistungsversicherung, both deducted in the final invoice.

Labour‑law risks include strict minimum wage obligations (MiLoG 13.90 €/h from 1.1.2026, BbgVergG minimum 13.00 €/h), extensive documentation, acceptance of on‑site inspections, monthly bank payment of wages, and cascading obligations to Nachunternehmer and labour lenders.

Subcontracting is allowed but controlled: Einsatz and later replacement of Unterauftragnehmer requires prior written consent; all subcontractors must meet reliability, capability and compliance, and must sign parallel BbgVergG agreements and Eigenerklärungen; any Nachunternehmer with Auftragssperre must be promptly replaced.

Eignungsleihe is allowed but requires FB‑3‑05 and FB‑4‑05; where financial capacity is borrowed, joint liability with the lending firm is agreed.

The documents also emphasise that submission deadlines are binding and that missing documents requested with the offer will generally be nachgefordert; failure to supply requested confirmations within the set time leads to exclusion.

Such as regarding contradictions or corrections, the input text shows some differing thresholds and references that bidders must interpret in line with the most specific document.

For example, one Eigenerklärung refers to Wettbewerbsregister queries from 30,000 € net, another from 50,000 € net; similarly, one passage mentions queries to the Gewerbezentralregister pursuant to §150a GewO and Schwarzarbeitsbekämpfungsgesetz at 30,000 € (net).

These are not necessarily contradictions but reflect different legal instruments and template versions; in practice, the stricter (lower) threshold will apply whenever the authority is legally obliged to check.

Additionally, there are duplicate or slightly varied text blocks for Eigenerklärungen, BbgVergG‑Vereinbarungen and Besondere Vertragsbedingungen, but they consistently point to the same overall obligations (e.g. self‑cleaning possibility, Sperrliste, cascading obligations to Nachunternehmer).

Where forms distinguish between “mit dem Angebot einzureichen” and “auf Anforderung einzureichen”, the Verzeichnis 1.02 and the Anlage list clarify which statement applies: core forms (Angebotsschreiben, LV, FB‑2‑02, FB‑3‑06, and, if applicable, FB‑3‑03/‑04/‑05) must be submitted with the bid; subcontractor and Eignungsleihe commitment forms (FB‑4‑03/‑04/‑05/‑06) and many certificates are only required upon separate request by the Vergabestelle.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 25/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
WSD Security GmbH72024–2025
Internationaler Bund (IB), IB Berlin-Brandenburg gGmbH, Region Nordwest · Berlin52024–2025
Taxifuhrbetrieb Fred Meier GmbH · Rathenow42013–2024
Georg v. Gayl - Landschaftsarchitekten · Berlin42026
NEWTEN Gebäudetechnik GmbH42026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

7
2022
17
2023
48
2024
2
2025
69
2025
27
2026
170 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Friday 20 November at 11:00

Tactics

When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 22 completed awards — not a statement about this procedure.)

This procedure allows 29 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.

Foreign bidders

In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on service.bund.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via service.bund.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now