Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Preparation of project documentation and implementation of the project entitled ‘Construction of a parking lot at 93 Kobierzyńska Street in Kraków, including drainage, lighting and spacers for conflicting weapons.

Opracowanie dokumentacji projektowej i realizacja inwestycji pn.: „Budowa parkingu przy ul. Kobierzyńskiej 93 w Krakowie wraz z odwodnieniem, oświetleniem oraz przekładkami kolidującego uzbrojenia. — original title

PLPoland · KrakówBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 16 November at 10:00 — 15 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

a) The subject of the contract is a construction work consisting in the preparation of design documentation and execution of construction works for the investment entitled: ‘Construction of a car park at ul. Kobierzyńska 93 in Krakow together with drainage, lighting and spacers of conflicting armaments.’ (b) The task should be carried out in the ‘design and build’ formula. (c) During the design works, it should be taken into account to obtain a location decision (WZ, ULICP), as the scope of the investment is not covered by the Local Spatial Development Plan, but includes the construction of a car park together with the reconstruction, extension of the network of existing underground armaments colliding with the location of parking spaces. The final design documentation should be completed by obtaining a final administrative decision and all necessary documents allowing for the…

Show full description

… implementation of the investment. d) The contracting authority described the subject of the contract using the following documents: - The draft provisions of the contract (PPU) - Annex 2 to the tender specifications, - the Functional and Utility Programme (PFU) and its annexes - Annex 8 to the tender specifications. (e) The Contractor is obliged to provide a quality guarantee for the subject matter of the contract for a minimum period of 36 months, for a maximum period of 60 months. Watch out! Tenders containing a quality guarantee period for the subject of the contract of less than 36 months will be rejected as not complying with the requirements of the tender specification. (f) Where the manufacturer's names, trademarks, standards, approvals, technical specifications and reference systems appear in any annex to the tender specification, the products may be replaced by equivalent ones. The Ordering Party shall consider as equivalent solutions solutions solutions that allow to achieve the effect assumed by the Ordering Party by means of other technical solutions. Equivalent solutions cannot be considered as identical solutions, but only those that in the compared features indicate exactly the same or very similar value in use. By indicating the manufacturer's names, trademarks, standards, approvals or reference systems, the Ordering Party aimed to determine the minimum quality parameters and performance characteristics that goods must meet in order to meet the requirements set by the Ordering Party and constitute only a quality standard of the subject of the contract. By the provision concerning the minimum requirements of quality parameters, the Ordering Party understands the requirements of goods contained in generally available sources, catalogues, manufacturers' websites, and the like. Operating with exemplary names of the manufacturer is only aimed at clarifying the level of expectations of the Ordering Party in relation to a specific solution. g) Subcontracting agreement, the subject of which are construction works, should be in accordance with Annex 2 to the ToR, i.e. PPU. Failure to meet a given condition will cause the Ordering Party to raise objections or objections, respectively. h) The Ordering Party, in accordance with Art. 1 of the Public Procurement Act, requires the employment by the Contractor or Subcontractor on the basis of an employment relationship, of persons performing the following activities, with the exception of persons performing the so-called independent technical functions in construction within the meaning of the Construction Law Act: - lower technical level workers (organisation and execution of construction works), - manual workers (direct execution of construction works). Watch out! The Ordering Party allows for the possibility of personal execution of the order by persons conducting business activity or partners of a commercial law company. i) Before signing the contract and during its implementation, the Ordering Party has the right to control the fulfilment by the Contractor or Subcontractor of the requirement indicated in point 3 in Part 1 of the Terms of Reference, in accordance with the provisions of the PPU. j) up to 21 months from the date of conclusion of the contract, including: Stage I – preparation of the project documentation and issuing it to the Contracting Authority, together with final binding decisions, certificates, declarations (necessary for the execution of construction works) – within 12 months from the date of conclusion of the

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuePLN 2,031,707
Published30 Oct 2026

Type of service

71 · Architecture & engineering45 · Construction work
CPV 71320000-7 · 45000000-7

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (347 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Sweco Polska Sp. z o.o.n = 347
  • 68% of this buyer's awards went to companies that had already won here before (910 awards since 2018, spread over 217 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 910 awards since 2018
  • The award came in at a median 57% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 9
  • The median procedure drew 2 bids (174 procedures with a bid count); 44% ended with a single bidder. Sector: median 4 bids.n = 174
  • 52% of the bids received came from small and medium-sized enterprises (42 procedures with a bid mix). Sector: 84%.n = 42

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 8 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Fdelita Piotr Frosztęga642022–2025
Rafał Matusik BPD412022–2025
Artur Maślanka Zakład Elektroinstalacyjny332021–2025
ELENTECH Daniel Wąsik322021–2026
Marta Mardyła Firma Inżynieryjna TECHMA322021–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

87
2021
112
2022
94
2023
86
2024
119
2025
28
2026
526 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 16 November at 10:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 8 completed awards — not a statement about this procedure.)

This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now