How to bid in this country: portals, deadlines, thresholds →
Repair of military railway sidings No. 606 Duninów, 712 Żagań-Karliki, 713 Potok, 718 Żagań
Remont wojskowych bocznic kolejowych nr 606 Duninów, 712 Żagań-Karliki, 713 Potok, 718 Żagań — original title
Your path to submission
- Deadline: 10 November at 08:00 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The scope of construction works includes: 1) TORY: Track No. 103 - Remove two short inserts with a length of 2m for inserts with a length of min. 6m (insert between Row No. 104 and Row No. 105), Track No. 104 - Replace 60 pcs. of wooden sleepers Track No. 105 - For the length of ramp No. 225 complete the ballast ballast approx. 15m3 2) PROJECTS Turnout No. 102 - Repaint the lantern, counterweight and turnout No. Turnout No. 108 - Repaint the lantern, counterweight, turnout No. and turnout No. Turnout No. 109 - Repaint the lantern, counterweight and turnout No. Turnout No. 110 - Repaint the selection of turnouts, Repaint the lantern, counterweight and turnout No. Turnout No. 111 - Replace the wooden crossovers under the entire crossing and 4 long crossovers behind the turnout and 10 short ones behind the turnout, Repaint the lantern, counterweight and turnout No. and…
Show full description
… turnout 3) SIGNALS AND INDITIONS 4) PROTECTION OF TOR ENDS (resistance goats) Renew the beam on the retaining goat and form the correct gravel backfill Repaint the beam on the retaining goat and indicator Z-1 5) CONTROL FACILITIES WITH TOR Renew the edge of the so-called safety belts in yellow and black 2. The scope of construction works includes: 1) TORY: Track No. 1001 - Replace 25 pieces of wooden sleepers in km from 0,100 to 0,200 (to replace accept 100% of screws), Replace 20 pieces of wooden sleepers in km from 0,200 to 0,300 (to replace accept 100% of screws), Over the entire length of the siding renew the kilometre and hectometre pillars Track No. 1003 - Over the entire length of the siding renew the kilometre and hectometre pillars Track No. 1004 - Replenish indicator Z1 (absence) 2) PROVISIONS Turnout No. 1001 - Repaint the lantern, counterweight and turnout number Turnout No. 1002 - Repaint the lantern, counterweight and turnout number 3) SIGNALS AND SKAZI Replace the signs G-3 (Cross of St. Andrzeja) - 2 pcs. Exchange the signs G-4 (double cross of St. John the Baptist) Andrzeja) - 2 pcs. 4) WORKING FACILITIES WITH TOR A side front ramp at track 1002 - paint the safety belts in black and yellow along the entire length. 3. The scope of construction works includes: 1) Track No. 101 - Adjust the track in the plan and profile for a length of 45 m (the track was raised by the root system of the trees). 2) Track 104 - Replace 340 sleepers and 8 contact sleepers (in km from 0,600 to 0,848), Plan the development of the third rail (rail) in accordance with § 25.2 of the Regulation of the Minister of Transport and Maritime Economy of 10.09.1998 on the technical conditions to be met by railway structures and their location. In track No 104, in a curve of R 100m - from km 0,608 to km 0,829, exclude the above-mentioned section from the use of rolling of coupled wagons - §32 pt. 5 and 6 of the Regulation of the Minister of Transport and Maritime Economy of 10 September 1998 on the technical conditions to be met by railway structures and their location. 3) Track No. 107 - At a distance of 45m from the beginning of turnout No. 110 on the curve there is no facing of the rails (curvature in the plan at the contact. Slip the track and at the contact put on 6 holes reinforced (2kpl). 4) turnout No. 102 - Renovate the beacon, counterweight and turnout No. turnout No. 103 - Renovate the beacon, counterweight and turnout No. turnout No. 105 - Renew the beacon, counterweight and turnout No. turnout No. 104 - Renew the beacon, counterweight and turnout No. turnout No. 106 - Renew the beacon, counterweight and turnout No. turnout No. 107 - Renew the beacon, counterweight and turnout No. turnout No. 108 - Renew the beacon, counterweight and turnout No. turnout No. 109 - Replace the entire selection of turnouts counterweight and turnout number Turnout No 118 - Renovate the lantern, counterweight and turnout number, conquer the pre-needle contact and 3 pcs. sleepers in front of the contact and 3 pcs. sleepers behind the contact 5) RAIL JOURNEY Drive in km 0+225 in track No 1
Contract
Type of service
Clement What the numbers say about this buyer
- 64% of the bids received came from other countries (9 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 9
- In this sector the buyer awards roughly every 2 months (152 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to PHUP TOKAREX Jerzy Tokarczyk.n = 152
- The median procedure drew 3 bids (162 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 162
- 53% of this buyer's awards went to companies that had already won here before (670 awards since 2015, spread over 304 companies). 47% went to new names.n = 670 awards since 2015
- 100% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 84%.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Firma "DOMEX" Dariusz Rudak | 17 | 2021–2026 |
| MPJ INVEST Sp. z o.o. | 14 | 2025–2026 |
| EUROBUD Sp. z o.o. , | 13 | 2023–2026 |
| MS Budownictwo Maciej Stocki, Michał Stocki Spółka Jawna | 11 | 2021–2026 |
| 105 Kresowy Szpital Wojskowy z Przychodnią Samodzielny Publiczny Zakład Opieki Zdrowotnej w Żarach | 10 | 2022–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now