Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Execution of budget task No 119 ‘Construction of a gym with street workout equipment’, i.e. Supply and installation of equipment for an outdoor gym with variable load and 1 information board(...)

Wykonanie zadania budżetowego nr 119 „Budowa siłowni z urządzeniami do street workout” tj. Dostawa i montaż urządzeń siłowni plenerowej ze zmiennym obciążeniem oraz 1 tablicy informacyjno(...) — original title

PLPoland · OtwockBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 5 November at 10:00 — 4 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1) The subject of the order includes the delivery, transport, assembly and commissioning of 9 factory-new outdoor gym equipment with variable load and information and regulation board, along with the required accompanying works and acceptance, at ul. Karczewska / Tadeusz Ślusarski in Otwock, on plot No. 6/10, area 140. 2) Supply, transport and installation of brand new, complete 9 devices listed in the table below, together with mountings, guards and elements necessary for safe use, and 1 external information and regulation board. The board is an additional element and is not counted as one of the 9 training devices. 3) Local vision, verification of boundaries and terrain conditions, arrangement of assembly access and verification of collisions with land armament based on the information of the Ordering Party. 4) Development by the Contractor of a situational drawing of devices with…

Show full description

… their dimensions, safe zones, walkways, foundations and required types of surfaces. The drawing requires the acceptance of the Ordering Party before the commencement of works. 5) Execution of earthworks necessary for assembly, securing and ordering the area and handing over as-built documentation. 6) Delivery and construction of a safety surface under the equipment and in their safety zones, if it is required by the equipment documents or appropriate safety requirements. The surface shall have parameters appropriate to the drop height indicated for the device. 7) The final synthetic grass outside the areas requiring the cushioning surface will be made by the Ordering Party on its own after acceptance. The contractor must coordinate the levels, drainage, flanges and contacts of the pavement so that the subsequent construction of the grass does not compromise the safety or availability of the equipment. 8) Providing instructions for use and maintenance in Polish, permanent utility markings, contact details of the service, documents confirming the properties and safety and training of the indicated employees of the Ordering Party. Functional requirements of the equipment: The scope includes the delivery and installation of nine training devices with a load for outdoor use. The required quantity is one piece of each device, a total of 9 pieces. Principles of equivalence. Names and descriptions indicate the expected types of exercise and functions. Equivalent devices, including those of a different design, appearance, dimensions and technical solutions, are permitted if they provide all the required functions, resistance control, safety and durability under external conditions. The assessment of equivalence will be based on technical sheets or equivalent documentation of the equipment offered. The mere convergence of muscle names or groups is not enough if the device does not allow the described movements. The detailed scope of the contract, functional requirements of the equipment, quality and safety requirements, rules for the placement and performance of substrates, requirements for the offer and acceptance criteria are specified in the Description of the Subject of the Contract (OPZ), constituting Appendix No. 1 to this Application.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published22 Oct 2026

Type of service

37 · Musical & sports goods
CPV 37440000-4

Clement What the numbers say about this buyer

  • 44% of this buyer's awards went to companies that had already won here before (246 awards since 2015, spread over 118 companies). That is well above the sector norm (23%) — newcomers have a harder time here than elsewhere.n = 246 awards since 2015
  • The median procedure drew just one bid (39 procedures with a bid count); 51% ended with a single bidder. Sector: median 2 bids.n = 39
  • 1% of awards went to companies from abroad (246 awards with a known winner country). Sector average: 1%.n = 246

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In comparable contracts in this sector nationwide (141 with a known bid count), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
TOMIRAF Sp. z o.o. Sp. k.442021–2026
„LAS s.c.”132023–2026
Remondis Otwock Sp. z o.o.132021–2026
SPECBRUK Magdalena Laskus62021–2023
PreZero Service Centrum Sp. z o.o.52021–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2023
2
2024
2
2026
5 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 5 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 141 completed awards — not a statement about this procedure.)

This procedure allows 14 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Musical & sports goods, 11 contracts went to foreign companies over the last 3 years (of 2,821 recorded awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now