Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Development of project documentation for the investment entitled ‘Construction, reconstruction, extension of the warehouse for the needs of OLiOC together with the administrative building and facilities for the ZGZiR in Nowy Targ’.

Opracowanie dokumentacji projektowej dla inwestycji pn.: „Budowa, przebudowa, rozbudowa magazynu na potrzeby OLiOC wraz z budynkiem administracyjnym i zapleczem dla ZGZiR w Nowym Targu”. — original title

PLPoland · Nowy TargBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 5 November at 09:30 — 4 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the preparation of project documentation for the investment entitled: ‘Construction, reconstruction, extension of the warehouse for the needs of OLiOC, together with the administrative building and facilities for the ZGZiR in Nowy Targ’. 2. The place of performance of the subject of the contract is located at ul. Targowa 6 and ul. Targowa 8, 34-400 Nowy Targ. The detailed location of the cadastral parcels is set out in graphic Annex No 10 to the ToR. The contract does not cover entire cadastral parcels, but only parts of them that have been visibly marked with a red line. 3. The investment task includes, in particular, the execution of complete multi-discipline design and costing documentation and STWiORB. 1/ Activities related to the performance of the subject of the contract include: a) development of three variants of the concept to be accepted by the…

Show full description

… contracting authority, one variant to further process the contract, b) development of the construction design on the basis of the accepted variant of the concept together with other required for obtaining the construction permit and all necessary documents and arrangements, c) development of the executive design for the purpose of carrying out the works together with the equipment developed taking into account the conditions of the approved construction design and the conditions contained in the opinions and arrangements obtained, as well as in the requirements of the contracting authority. 4. The material scope of the subject matter of the contract includes in particular: 1/ concept 2/ land or land development project, 3/ architectural and construction project, 4/ final building permit decision, 5/ technical design – by industry, 6/ technical specifications for the execution and acceptance of construction works, 7/ executive design – by industry, 8/ bill of quantities – by industry, 9/ investor’s cost estimate – by industry, (pdf, xlsx), 10/ visualisation. The above study should be prepared to the extent and in the form required by the Public Procurement Act of 11 September 2019 (consolidated text: Journal of Laws [Dz. of Laws 2026, item 793) used to describe the subject of the contract for construction and assembly works for which it is required to obtain a building permit decision or a notification of works not requiring a building permit and to the extent sufficient to perform these works. 5. Detailed assumptions for the scope covered by the design work: 1/ the contractor determines the scope of the map for design purposes and obtains it together with its possible necessary extensions and necessary updates, bearing all related costs, 2/ the contracting authority undertakes to make available documents and data related to the execution of design works in its possession, which may have an impact on the facilitation of design works and on improving their quality, 3/ design solutions and scope of documentation, also in the cost estimate part should be consulted with the contracting authority during the design works and obtain for them the approval of the contracting authority, 4/ the obtained industry conditions on the basis of which the contractor will perform the project should be presented to the contracting authority immediately after receipt and obtain its approval, 5/ all necessary materials and studies for the implementation of the full scope of development are secured at the contractor's own expense, 6/ the contractor accepts all activities required to perform the contract, and the quoted price includes all costs within the scope of the contract, 7/ the contractor will obtain all: conditions for design, consent, statements, provisions, decisions (including water permits), industry agreements, opinions, agreements of the Project Documentation Reconciliation Team, etc., 8/ the scope of the contract includes two updates of investor's cost estimates, 9/ the contractor will be responsible for defects in the design works. The term of the warranty will end with the expiry of the term of liability under the warranty for defects in construction works carried out on the basis of the design works subject to this invitation, 10/ as part of the implementation of the

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026

Type of service

71 · Architecture & engineering
CPV 71220000-6 · 71221000-3

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (22 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Tadeusz Pękala Biuro Inwestycyjne INBUD.n = 22
  • The median procedure drew 2 bids (50 procedures with a bid count); 28% ended with a single bidder. Sector: median 4 bids.n = 50
  • 42% of this buyer's awards went to companies that had already won here before (227 awards since 2015, spread over 104 companies). 58% went to new names.n = 227 awards since 2015
  • Across 8 procedures with structured selection criteria, this buyer most often required: References: supplies (3 of 8), Special authorisation or membership required (3 of 8), Equipment, plant and technical facilities (2 of 8), Professional register enrolment (1 of 8).n = 8
  • 1% of awards went to companies from abroad (227 awards with a known winner country). Sector average: 0%.n = 227

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
KAL-TRANS A. Kalata Spółka Komandytowa192021–2026
Bartłomiej Majerczyk SOLID-BRUK132021–2026
Podhalańskim Przedsiębiorstwem Drogowo – Mostowym S. A.102021–2026
Jan Adamczyk Roboty Ziemne, Usługi Sanitarne i Pokrewne,82022–2026
OMYLAK PIOTR SONA42024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

5
2021
4
2022
1
2023
4
2024
3
2025
4
2026
21 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 5 November at 09:30

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)

This procedure allows 20 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now