Development of design and cost estimation documentation for the renovation of building no. 10 in the military complex in Gdynia.
Opracowanie dokumentacji projektowo – kosztorysowej dotyczącej remontu budynku nr 10 w kompleksie wojskowym w Gdyni.
Poland · Gdynia · how to bid here →
Your path to submission
- Deadline: 21 September at 08:30 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 54% of the bids received came from other countries (5 procedures with a bid mix) — all bidders, not just the winners. Sector: 4%.n = 5
- In this sector the buyer awards roughly every 6 months (5 awards, most recently March 2026) — by that rhythm the next award was due around September 2026. The last award went to Instytut Techniczny Wojsk Lotniczych.n = 5
- 28% of this buyer's awards went to companies that had already won here before (97 awards since 2021, spread over 69 companies). 72% went to new names.n = 97 awards since 2021
- The award came in at a median 70% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 8
- The median procedure drew 4 bids (37 procedures with a bid count); 5% ended with a single bidder. Sector: median 4 bids.n = 37
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Poland · Architecture & engineering, 109 contracts went to foreign companies over the last 3 years (of 39,380 recorded awards) — mostly from Germany, France, Switzerland.
Typical field: median 4 (from 4,509 awards).
What the buyer is looking for
Opracowanie dokumentacji projektowo – kosztorysowej dotyczącej remontu budynku nr 10 w kompleksie wojskowym w Gdyni.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PPUH SUPRON 3 SP. Z O.O. | 4 | 2024–2025 |
| CADABRA Tomasz Przybył | 4 | 2024–2025 |
| Cadabra Tomasz Przybył | 3 | 2026 |
| Przedsiębiorstwo Usługowe POŻ- PLISZKA sp. z o.o. | 3 | 2024–2026 |
| Polska Inżynieria Artur Klejna | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.