How to bid in this country: portals, deadlines, thresholds →
Works of replacement and removal of the asbestos cover of the ship of the cooperative of Sant Lluís
Obras de sustitución y retirada de la cubierta de amianto de la nave de la cooperativa de Sant Lluís — original title
Your path to submission
- Deadline: 17 November at 23:59 — 17 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (27 awards, most recently August 2026) — the next award is due around December 2026 by that rhythm. The last award went to INMEX MENORCA 2023, S.L.n = 27
- 35% of this buyer's awards went to companies that had already won here before (125 awards since 2020, spread over 79 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 125 awards since 2020
- The median procedure drew just one bid (8 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 8
- 93% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 68%.n = 9
- The award came in at a median 90% of the estimated value (110 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Contract for asbestos roof removal and replacement in Sant Lluís
The input text concerns a public works contract in Spain (Ajuntament de Sant Lluís, Illes Balears) for the substitution and removal of an asbestos-containing roof in a municipal warehouse.
It is drafted under Spanish public procurement law (Ley 9/2017 de Contratos del Sector Público) and Spanish technical building regulations (Código Técnico de la Edificación), with references to Spanish Royal Decrees on safety, health, and asbestos handling.
The country point of view is clearly Spanish, with a local municipal authority as contracting entity and requirements tied to Spanish legal and administrative frameworks.
As background, the project “PROYECTO BÁSICO Y DE EJECUCIÓN PARA ADECUACION Y SUSTITUCION DE CUBIERTA” defines the technical scope and conditions of the works, while the municipal “Informe raonat de la necessitat del contracte” and contracting resolutions define the legal framework, procedure, and solvency requirements.
The contract is classified as a works contract, tendered using the open simplified procedure (procediment obert simplificat) because the estimated contract value (around 86,343.40 € without VAT, updated licitation price 89,245.70 €) exceeds the thresholds for minor contracts and for the abbreviated simplified open procedure.
Regarding what the bidder must submit and minimum qualification requirements, the input text specifies, for example, that classification of contractors is not required because the estimated value is under 500,000 €; therefore no official contractor classification is demanded, even though the project notes it would fall under Group C (Edificacions) in RD 773/2015.
Instead, bidders must evidence technical solvency by a list of works executed in the last three years, backed by certificates of good execution, such as works on industrial roofs, sandwich panels, structural rehabilitation, or asbestos removal (CPV 45261000-4 and/or 45262660-5).
The minimum amount of similar works in the best of the last three years must reach at least 70% of the estimated contract value (60,440.38 €).
Economic and financial solvency must be accredited through annual turnover: the best year in the last three available must be at least 1.5 times the contract’s estimated value (129,515.10 €).
Furthermore, since the work includes removal of asbestos cement sheets, the bidding company must be registered in the regional RERA (Registro de Empresas con Riesgo de Amianto) and, before starting work, must have an asbestos work plan approved by the competent Labour Authority.
After award, and before starting the works, the contractor must supply CE certificates of materials, product certificates, and technical data sheets, subject to approval by the project’s site management (dirección facultativa).
Concerning the scope of the contract—what, how much, where, and when—the documents explain that the object covers all works needed to adapt a warehouse used as municipal storage in Sant Lluís, located at Carrer Sol nº 7. The works include, such as: dismantling and removing the current fibrociment roof with asbestos, gutters and translucent panels; supplying and installing a new 40 mm thick sandwich panel roof with new metal gutters; repairing and consolidating the existing structure, including replacement of fixing plates, cleaning of concrete pillars, and anticorrosive treatment of steel beams; and adapting the electrical distribution board and replacing lighting with high-efficiency LED “campanas”.
Show all 24 statements
The works start with signature of the “acta de comprobación del replanteo” and finish upon reception and settlement; the execution period is fixed at 3 months from that act.
The project is defined as a complete unit of work that, once finished, can be delivered to public use, and it explicitly states no geotechnical study is needed due to the nature of the interventions.
As to award criteria and weighting, the input text makes clear that the procedure is open simplified with a single award criterion: price.
For example, the municipal report highlights that technical specifications, quality parameters, materials and guarantees are rigidly fixed in the technical project, leaving no room for qualitative or technical variants that would add substantial benefit.
Therefore, the best quality-price ratio for the municipality is obtained solely by evaluating the most economically advantageous offer, i.e. the lowest price.
The e-procurement platform description confirms a single envelope (“Sobre único”) containing administrative documentation and automatically quantifiable criteria, with price as the only criterion, weighted at 100%, evaluated by a formula of the form: 100 × (precio licitación – oferta solicitante)/(precio licitación – oferta más baja).
On risks and special conditions, the documents mention, such as, several key elements.
A definitive performance guarantee (garantía definitiva) equal to 5% of the final offered price (excluding VAT) must be provided by the awarded contractor, according to article 107.1 LCSP.
However, details on penalties for delay, validity period of offers, deadlines for questions, or mandatory site visits are not explicitly quoted in the provided excerpts and would likely be detailed in the missing administrative clauses (pliego de cláusulas administrativas) referenced but not reproduced.
For example, both the project and the municipal report confirm that official contractor classification is not required because the estimated value is under 500,000 €; no contrary statement is given, even though the project notes the theoretical classification group (Group C: Edificacions) under RD 773/2015.
Both sources agree on the 3‑month execution period, on the use of the open simplified procedure, and on price as the sole award criterion.
The only minor discrepancy is that the project memory speaks of an estimated contract value of 86,343.40 € (excluding VAT), while the informed need report sets the licitation price at 89,245.70 € (excluding VAT) after an addenda updating prices approved by the Junta de Govern Local; in practice, the latter (updated licitation price) would be the binding figure for bidders.
Only the contracting authority's tender documents are binding. As of: 30/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Alberto Correa Rodríguez de la Torre | 9 | 2024–2025 |
| INMEX MENORCA 2023, S.L. | 9 | 2024–2026 |
| INESPRO, S.L | 5 | 2024–2025 |
| SA XARANGA SC | 4 | 2023–2026 |
| JORDI GORDILLO MONFONTE | 3 | 2024–2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 17,996 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now