Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Works for the replacement of the roof of the building that houses the fire group (GCI) of the biomethanization area and its interior sectorization, located in the COGERSA waste treatment center.

Obras para la sustitución de la cubierta del edificio que alberga al grupo contra incendios (GCI) del área de biometanización y su sectorización interior, ubicado en el centro de tratamiento de residuos de COGERSA. — original title

ESSpain · OviedoBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 23 November at 14:00 — 22 days left.
  2. You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated value€78,882
Published28 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45261000 · 45262520

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (8 awards, most recently January 2026) — by that rhythm the next award was due around May 2026. The last award went to SOLVESER SL.n = 8
  • 28% of this buyer's awards went to companies that had already won here before (836 awards since 2020, spread over 494 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 836 awards since 2020
  • The median procedure drew just one bid (479 procedures with a bid count); 54% ended with a single bidder. Sector: median 3 bids.n = 479
  • The award came in at a median 78% of the estimated value (323 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 323
  • 0% of the bids received came from other countries (210 procedures with a bid mix) — all bidders, not just the winners. Sector: 9%.n = 210

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Contract for roof replacement and fire sectorization at Cogersa’s biometanization area

The input text concerns a Spanish public works contract promoted by COGERSA S.A.U.

(Compañía para la Gestión de Residuos Sólidos en Asturias) for construction works at its waste treatment centre in Serín (Gijón, Asturias, Spain).

The perspective is clearly that of Spanish public procurement law, specifically the Ley 9/2017 de Contratos del Sector Público (LCSP).

It sets out the justification, scope, solvency requirements, award criteria, special execution conditions and penalty regime for the tender “expediente 114/2026”.

Such as regards bidder submissions and minimum qualifications, the documents require three separate “sobres”: Sobre 1 (administrative documentation) must contain evidence of capacity to contract and not being subject to exclusion grounds under the LCSP, plus proof of solvency or, alternatively, official classification.

Economic and financial solvency is proven by a responsible declaration of annual turnover for the last three closed financial years, showing at least 1.5 times the estimated contract value (78,882.44 €), i.e. a minimum of 118,323.66 € in the best year.

Technical solvency requires a declaration that the bidder has executed at least two equivalent works in the last five years, with references describing main technical aspects, location, execution period and certificates of good execution from the client (“la Propiedad”).

As an alternative to these specific solvency proofs, bidders can present official classification as works contractor: Group C (edifications), subgroups C‑7 (insulations and waterproofing) and C‑4 (masonry, rendering and finishes), category 1. Sobre 2 (technical offer) contains the documentation for qualitative criteria, notably an environmental memorandum, while Sobre 3 (economic offer) contains the price and quantitative improvements.

No specific insurance requirements are mentioned in the excerpts; standard obligations under LCSP and sectoral safety/health rules apply but there is no separate minimum insurance sum stated.

Such as for the scope of the contract, the object is the “sustitución de la cubierta y sectorización interior” of the building housing the fire‑fighting group (GCI) in the biometanization area.

The estimated value is 78,882.44 € (without VAT) and the tender base budget is 95,447.75 € (including VAT).

The CPV codes are 45261000 (roofing and enclosure structures) and 45262520 (masonry works).

Show all 33 statements

Place of performance is the Centro de Tratamiento de Residuos de Cogersa in La Zoreda, Serín (Gijón, Asturias), with postal address Carretera de Cogersa, 1125, 33697 Serín (Gijón).

The contractual execution period is 3 months, although the adjudicatario can offer a shorter period, which is then part of the award scoring.

No options or extensions (“prórrogas”) are foreseen.

Such as concerns award criteria and weighting, the contract is awarded on best quality‑price ratio under article 145 LCSP, combining economic and qualitative elements.

Quantifiable criteria (up to 97 points) are: price (criterion A, up to 92 points, scored by PO = (MO × VM) / OF, ensuring the lowest price gets 92 points), reduction of execution period (criterion B, up to 2.5 points, granting 2.5 points for one full month reduction from the 3‑month maximum; smaller reductions are not valued), and extension of contractual guarantee period (criterion C, up to 2.5 points, granting 1.25 points per full extra year beyond the minimum one‑year guarantee, up to 2.5 points total; partial years are not valued and the extension is capped at 3 years overall).

Qualitative criteria (up to 3 points) consist of the environmental resources memorandum (criterion D), rated 0, 1.5 or 3 points depending on sufficiency, detail and technical quality.

Offers are considered abnormally low if the offered amount is less than 70% of the average of all bids.

No variants are permitted.

Such as in relation to risks and special conditions, the PCAP includes an environmental special execution condition under article 202 LCSP: at the start of the works the contractor must present a waste minimization plan ensuring on‑site segregation of fractions and avoiding mixes that hinder reuse or recycling, supervised by the site management.

Non‑compliance triggers a specific penalty.

Payment regime is monthly certificates based on actually executed work and unit prices.

A definitive guarantee of 5% of the contract amount is required pursuant to the notice, and there is a contractual performance guarantee period of 1 year from reception, which may be voluntarily extended for scoring purposes.

Penalties cover delay in execution (by reference to article 193 LCSP), breach of the environmental/waste plan (1,000 € per infringement), defective execution (1,000 € per defect) and serious safety and health breaches (2,000 € per infringement), plus the general obligation to compensate damages.

No price revision is allowed (article 103 LCSP), and no modifications are foreseen during execution.

Subcontracting is implicitly possible under LCSP, but Cogersa explicitly disclaims any employment‑related responsibility: all staff assigned to the contract are exclusively dependent on the contractor, and there is no labour contract subrogation.

The tender documentation sets a validity period of the offer of 2 months (“Plazo de Validez de la Oferta: 2 Meses”).

The excerpts do not mention a specific question/clarification deadline or mandatory site visit; unless stated elsewhere in the full dossier, no special conditions on these points apply beyond general LCSP rules.

The place of performance appears both as “CTR de Cogersa” and “Centro de Tratamiento de Residuos de La Zoreda, en Serín (Gijón)”; these refer to the same facility, so there is no real conflict.

The guarantee regime shows a minimum one‑year contractual guarantee (section 11) and an award criterion allowing up to three years of total guarantee; this is complementary, not contradictory: the binding minimum is 1 year, with voluntary extensions to obtain extra points.

The solvency requirements are consistently described both in the PCAP and in the tender notice: bidders may choose between meeting the specific turnover and reference thresholds or presenting the stated official classification (Group C, subgroups 7 and 4, category 1).

Where minor wording differences appear (e.g. generic “CTR de Cogersa” versus full postal address), the more detailed notice description should be followed for practical purposes, but legally the PCAP and published notice together govern, and no excerpt provided indicates mutually incompatible obligations.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 30/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Proyecto.pdf
Technical specification
›
Security deposit: 2 5

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
APPLUS NORCONTROL SLU · SADA92021–2026
BELVAL SERVICIOS Y VENTAS SL · Lugones92022–2026
KEMEN RECAMBIOS Y SERVICIOS, S.L.82022–2026
Eulen S.A. · Coruña, A82023–2025
JCOPLASTIC IBÉRICA 2000 SL72022–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

5
2023
3
2025
4
2026
12 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 23 November at 14:00

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 17,996 completed awards — not a statement about this procedure.)

This procedure allows 26 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on PLACSP — Plataforma de Contratación del Sector Público. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via PLACSP — Plataforma de Contratación del Sector Público before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now