How to bid in this country: portals, deadlines, thresholds →
Works to reorganize the roundabout of Sant Antoni Street with Sa Pau Avenue
Obras de reordenación de la rotonda de la calle Sant Antoni con la Avenida de Sa Pau — original title
Your path to submission
- Deadline: 11 November at 23:59 — 11 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (27 awards, most recently August 2026) — the next award is due around December 2026 by that rhythm. The last award went to INMEX MENORCA 2023, S.L.n = 27
- 35% of this buyer's awards went to companies that had already won here before (125 awards since 2020, spread over 79 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 125 awards since 2020
- The median procedure drew just one bid (8 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 8
- 93% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 68%.n = 9
- The award came in at a median 90% of the estimated value (110 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Tender for roadworks: reordering of the roundabout at Sant Antoni / Sa Pau (Sant Lluís, Menorca)
The input text concerns a Spanish public works tender launched by the Ajuntament de Sant Lluís (Spain), for the construction/reordering of a road junction into a roundabout in Menorca.
The country point of view is clearly Spain, with explicit references to Spanish procurement law (LCSP), Balearic regulations, and the national online tendering platform (PLACSP / Plataforma de Contratación del Sector Público).
The general background is that this is a works contract (“contracte d’obres”) for road construction and pavement/signage works at the junction of Calle Sant Antoni and Avenida de Sa Pau, near CEIP Sa Garriga.
As indicated, it aims to improve traffic flow and road safety, and to guarantee pedestrian accessibility under Balearic accessibility law.
The project documentation is extensive (memoria, annexes, safety study, technical and administrative clauses, budget and measurements), but the procurement procedure itself is an “procedimiento abierto simplificado” with a single award criterion.
Concerning what the bidder must submit and minimum qualification requirements, the input text states that offers must be submitted electronically via PLACSP in a single envelope (“sobre único”) containing administrative documentation and the automatically quantifiable criterion (price).
As such, the bidder must demonstrate: (i) general capacity to contract and absence of prohibitions or incompatibilities, (ii) compliance with tax and social security obligations, all “según la cláusula 12 del Pliego de cláusulas administrativas”.
For solvency, economic-financial capacity must be proven by turnover: the minimum annual turnover (in the best of the last three closed years) must be 1.5 times the estimated value of the contract, i.e. 102,335.33 EUR.
When the contractor is a newly created company (less than five years old), such technical solvency must be accredited using means b) to f) of article 88 LCSP, and not by executed works under letter a).
Additionally, while classification is not required (value below 500,000 EUR), the text indicates the reference classification category: Group G, Subgroup 4, Category 1 (bituminous road surfaces).
During execution, suppliers must provide documentation for products (origin, supply notes, CE marking, quality marks, guarantees), which the contractor passes to the Director of execution.
Show all 39 statements
Regarding the scope of the contract (what, how much, where, when), the object is “Obras de reordenación de la rotonda de la calle Sant Antoni con la Avenida de Sa Pau”, specifically the construction of a central roundabout with remountable kerb around the existing lamppost, and the adaptation of pavements, kerbs, and elevated pedestrian crossings.
The estimated contract value is 68,223.55 EUR (without VAT), with a tender base budget of 82,550.50 EUR including 21% VAT (82,550.5 EUR in the announcement).
The place of performance is coded ES533 (Menorca), identified as CEIP Sa Garriga area, in Sant Lluís. The execution period is 2 months, starting from the signature of the “acta de comprobación y replanteo” (site check and setting-out).
The project is declared “obra completa”, meaning that once finished and received, the works can be put to public use.
Concerning award criteria and weighting, the contract uses a single criterion: price (execution price without VAT), evaluated with a formula.
The criterion has 100% weighting (100 points).
The score is computed as: Puntuación = 100 × (precio licitación − oferta licitante) / (precio licitación − oferta más baja).
All prices in the formula must include all concepts except VAT.
Thus, the lowest price gets 100 points, and other offers are linearly scored between the tender budget and the lowest offer.
There are no qualitative or non-price criteria and no electronic auction.
On risks and special conditions, the documents underline several points.
A definitive guarantee of 5% of the final offered price (excluding VAT) must be constituted by the successful bidder, following article 107 LCSP; this need for a definitive guarantee is expressly cited as the reason for choosing the ordinary “open simplified” procedure rather than the abbreviated one.
Price revision is expressly not foreseen because the execution term is under one year.
Subcontracting is allowed on a partial basis, as the works are not secret or reserved, and there are no critical tasks; it is stated that coordinated subcontracting should not harm execution or deadlines.
The contract is not divided into lots, with justification that splitting would complicate coordination and technical execution, although article 99 LCSP generally encourages lots.
The technical clauses reference insurance of works, mutual indemnities, treatment of defective units, conservation of the work, and guarantees for material damage due to defects, although detailed penalty regimes are only indicated generically (fiances, indemnitzacions, unitats defectuoses) without specific amounts in the excerpts.
The project notes that the Spanish Building Code (CTE) is not applicable since no buildings are affected, but that a quality control plan is still implemented, aligned with Art. 7 CTE Part I and Decree 59/1994 (Balearic control of quality in construction).
As such, controls include systematic reception of products (documentation, CE marking, quality marks, tests), control of execution and of the finished work.
The contract accepts electronic invoicing and is not co-financed by EU funds.
The deadline for submitting tenders is 11/11/2026 at 23:59; additional information and pliegos can be obtained from the contracting authority until the same date and time.
The opening of the single envelope is scheduled for 12/11/2026 at 11:00, in a private act at the Town Hall.
No mandatory site visit is mentioned in the provided text, nor is any explicit validity period of offers specified in the excerpts (it will presumably be in the full administrative clauses).
Regarding contradictions or corrections within the documents, the main apparent discrepancies are minor and largely reconciled in the text.
For example, the budget appears as 82,550.5 EUR in the announcement and 82,550.50 EUR in the project; given the detailed breakdown in the project (material execution 55,466.30 EUR plus industrial profit, overheads and 21% VAT), the more precise figure 82,550.50 EUR seems the technical base, while the announcement rounds to one decimal place.
Another apparent tension is that the project states “En aquest projecte no és d’aplicació el CTE” (CTE not applicable), yet the attached quality control plan explicitly refers to Art. 7 CTE and its control requirements.
The text itself resolves this by explaining that Decree 59/1994 is in force and partially overlaps CTE, and that the plan covers materials required by the CTE documents even though, strictly, CTE is not mandatory because no buildings are involved.
In practice, where slight numeric rounding differs, the contracting authority will likely apply the detailed figures from the approved project (INF.129-2025 and the project budget) as authoritative.
Only the contracting authority's tender documents are binding. As of: 23/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Alberto Correa Rodríguez de la Torre | 9 | 2024–2025 |
| INMEX MENORCA 2023, S.L. | 9 | 2024–2026 |
| INESPRO, S.L | 5 | 2024–2025 |
| SA XARANGA SC | 4 | 2023–2026 |
| JORDI GORDILLO MONFONTE | 3 | 2024–2025 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 17,996 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now