Paving Calle Santa Vera Cruz II Phase in Osorno la Mayor
Pavimentación Calle Santa Vera Cruz II Fase en Osorno la Mayor — original title
Your path to submission
- Deadline: 16 November at 23:59 — 15 days left.
- You submit on PLACSP — Plataforma de Contratación del Sector Público — not here and not by e-mail. ↗ Submission via the Plataforma de Contratación (PLACSP): registration plus a recognised digital certificate / eIDAS signature — as an EU bidder, arrange this early; it typically takes days. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (190 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to OBRAS HERZACO S.L.n = 190
- The median procedure drew just one bid (725 procedures with a bid count); 74% ended with a single bidder. Sector: median 3 bids.n = 725
- 52% of this buyer's awards went to companies that had already won here before (1,194 awards since 2018, spread over 546 companies). 48% went to new names.n = 1,194 awards since 2018
- The award came in at a median 88% of the estimated value (416 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 416
- 84% of the bids received came from small and medium-sized enterprises (106 procedures with a bid mix). Sector: 68%.n = 106
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents at a glance
The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
✓ found in the documents · ❓ not found in the documents or general statement
Contracting of Pavement Works in Calle Santa Vera Cruz (2nd Phase), Osorno la Mayor
The input text concerns a public works contract promoted by the Diputación Provincial de Palencia in Spain for the “Pavimentación Calle Santa Vera Cruz 2ª Fase en Osorno la Mayor”.
It is clearly an EU‑context public procurement (mentions DEUC and NextGenerationEU) but from the specific Spanish local‑authority point of view (Ley 9/2017 de Contratos del Sector Público and Ley 7/1985 de Bases de Régimen Local).
The text compiles several tender‑related documents: a technical/financial justification (memoria), the initiation decree, the approval of the expediente, and the structured tender notice and pliego information published on the Spanish Plataforma de Contratación del Sector Público.
Such as described in the memoria justificativa, the scope of the contract is the execution of pavement works on Calle Santa Vera Cruz, second phase, in the municipality of Osorno la Mayor (Province of Palencia, ES414).
The type of contract is “Obras”, subtype “Construcción de autopistas, carreteras, campos de aterrizaje, vías férreas y centros deportivos”.
The contract is not divided into lots (“sin lotes”) for technical and coordination reasons.
The estimated value of the contract is 64.462,82 EUR (without VAT), with a presupuesto base de licitación of 78.000,00 EUR (IVA incluido), broken down into execution material, general expenses, industrial profit and VAT.
The execution period is 4 months, the place of performance is Osorno la Mayor / Palencia, and the works form part of the 2024‑2025 provincial cooperation plans, financed by the local entity (41.202,50 EUR) and the Diputación (36.797,50 EUR), with reference to EU NextGenerationEU funding codes.
Such as set out under “Condiciones de Licitación” and “Preparación de oferta”, bidders must submit three separate “sobres” electronically via PLACSP.
Sobre A contains documentation administrativa: (1) a Declaración Responsable (Annex I of the PCAP) and (2) the Documento Europeo Único de Contratación (DEUC.xml) downloaded from the tender’s annexes.
These documents are used to declare that the bidder has capacity to act, is not prohibited from contracting, is not subject to incompatibilities, and complies with tax and Social Security obligations, as well as meeting the economic‑financial and technical‑professional solvency criteria “detallada en Pliegos” (the detailed thresholds are not in the excerpt, but must be checked in the PCAP).
Show all 27 statements
Sobre B contains the technical offer, a single “memoria” covering the aspects listed in section H4 of the Cuadro de Características Particulares of the PCAP (for example process of execution, programming, and environmental measures).
Sobre C contains the economic offer, structured according to Annex II of the PCAP; in case of discrepancy between the amount typed in the electronic tool and the PDF/attached economic offer, the latter prevails.
Such as defined in the “Condiciones de adjudicación”, the award criteria are mixed: 60 points for the price criterion (formula‑based), 34 points for “Proceso de ejecución y programación de las obras” (evaluated by judgment of value), and 6 points for “Minimización de los efectos negativos en aquellos factores del medio ambiente afectados por la obra” (environmental improvements, also by judgment of value).
Thus, price is heavily weighted but the qualitative programming and environmental proposals together represent 40% of the score.
The contract requires a 5% “Garantía definitiva” over the contract amount, to be constituted by the awardee as per the PCAP.
Payments will be made monthly, against work certificates (“mensual, mediante certificación de obra”).
The procedure is “Abierto”, “ordinario” and “anticipado”; offers must be submitted electronically through PLACSP until 16/11/2026 at 23:59, and the same deadline applies for obtaining the pliegos.
Such as is typical in Spanish public works tenders, the PCAP (Pliego de Cláusulas Administrativas Particulares) will contain further risk‑related conditions not fully quoted here: penalties for delay or defective performance, rules on subcontracting, validity period of offers and possible site visit obligations.
The excerpt explicitly mentions only the definitive guarantee (5%), the monthly certification payment regime, and the absence of harmonized regulation applicability (not subject to EU procurement directives threshold regime).
It also notes that there is a technical project and acta de replanteo incorporated into the expediente, and that a supervision report exists but a formal high‑level supervision report is not required because the budget is below 500.000 EUR and the works do not affect stability, safety or watertightness.
No explicit question deadline is given beyond the general pliego‑obtention period, and no mandatory site visit is mentioned in this excerpt, so any such obligations must be verified directly in the PCAP and PPT.
Contradictions or corrections within the documents are minimal in the provided text: the contract value is consistently stated as 64.462,82 EUR (importe sin impuestos / valor estimado) and 78.000,00 EUR (importe con IVA / presupuesto de proyecto).
The procedure is consistently “abierto”, execution period 4 months, and guarantee 5% definitive.
Where the text says “Criterio de Solvencia Técnica‑Profesional: Otros – detallada en Pliegos” and similarly for economic solvency, this is not a contradiction but a cross‑reference to missing detailed requirements.
In case of discrepancies in the offered price between the electronic tool and the formal economic offer document, the pliegos explicitly state that the latter (the document in Sobre C according to Annex II PCAP) prevails, which resolves any internal contradiction on pricing data entry.
Only the contracting authority's tender documents are binding. As of: 23/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| HORMIGONES SIERRA, SLU | 40 | 2023–2026 |
| CONSTRUCCIONES HERMANOS SASTRE, SA | 23 | 2021–2026 |
| Viveros Pisuerga SL · Herrera de Pisuerga | 23 | 2023–2026 |
| JULIETMA, OBRAS Y CONTRATAS, S.L. | 19 | 2023–2026 |
| LUCIANO GARRIDO E HIJOS, SL | 17 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 21 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 26 (median of 7,730 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Spain · Construction work, 90 contracts went to foreign companies over the last 3 years (of 100,814 recorded awards) — mostly from Portugal, Italy, France.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now