Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Spółka Akcyjna
Poland · 11 open tenders · 164 documented awards
Current tenders
Design and execution of construction works for the construction of a complete module for preparing biodegradable waste for the co-fermentation process in WKF at WOŚ
Deadline 5 Oct ·
Property insurance in 2026-2028.
Deadline 6 Oct ·
Technical expertise of lock No. 1 (polder Oławka) and lock No. 2 (Blizanowice - Trestno)
BELOW THRESHOLDDeadline 12 Oct ·
Property insurance in 2026-2028.
Deadline 12 Oct ·
Preparation of design documentation, specifications and cost estimates for the construction of settlers and oil derivative separator at stormwater sewer outlets.
BELOW THRESHOLDDeadline 12 Oct ·
Design and execution of construction works for the construction of a complete module for the preparation of biodegradable waste for the cofermentation process in WKF at WOŚ
Deadline 12 Oct ·
Design and execution of construction works related to rainwater and snowmelt management at the PILCZYCKI POND facility
BELOW THRESHOLDDeadline 14 Oct ·
Supply of 12 weighing rain gauges together with their comprehensive installation, commissioning and calibration
BELOW THRESHOLDDeadline 15 Oct ·
Supply of aluminum coagulants in solution form for the needs of Wrocław Wastewater Treatment Plant
Deadline 19 Oct ·
Maintaining cleanliness in MPWiK S.A. facilities
Deadline 20 Oct ·
Dostawa flokulantu do wspomagania procesu mechanicznego odwadniania (kondycjonowania) 25 000 Mg s.m. osadu przefermentowanego
Deadline 21 Oct ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
201850
201926
202025
20213
20221
20234
2024129
2025161
2026114
Clement What the numbers say about this buyer
- 24% of this buyer's awards went to companies that had already won here before (239 awards since 2015, spread over 106 companies). That is well below the national norm (39%) — this buyer switches suppliers more often than others.n = 239 awards since 2015
- 92% of the bids received came from small and medium-sized enterprises (44 procedures with a bid mix). Country: 65%.n = 44
- The median procedure drew 2 bids (165 procedures with a bid count); 33% ended with a single bidder. Country: median 2.2 bids.n = 165
- 10% of awards went to companies from abroad (239 awards with a known winner country). National average: 5%.n = 239
- 0% of the bids received came from other countries (44 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 44
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 25% of 9,975 closed expectation windows produced a notice.
- Nov 2026Construction work
about every 2 months · 73 awards · last Sept 2026 to AQUA PARTNER Sp. z o.o. - Nov 2026Chemical products
about every 1 months · 25 awards · last Sept 2026 to Kemipol Sp. z o.o. - Nov 2026Architecture & engineering
about every 6 months · 6 awards · last Jun 2026 to DHI POLSKA Sp. z o.o. - Nov 2026Laboratory & optical equipment
about every 3 months · 3 awards · last Aug 2026 to AquaRD Sp. z o.o. - Dec 2026Transport equipment
about every 6 months · 4 awards · last Jul 2026 to Pojazdy Komunalne Tymborowscy Sp. z o.o. - Jan 2027Construction materials
about every 4 months · 8 awards · last Sept 2026 to RUREX Sp. z o.o. - Feb 2027Industrial machinery
about every 6 months · 5 awards · last Aug 2026 to POH WOD BUD MARTA LACHOWICZ - ZONTEK SPÓŁKA JAWNA
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kemipol Sp. z o.o. | 8 | 2015–2026 |
| Elektrotim S.A. | 6 | 2024–2026 |
| AG System Sp. z o.o. | 6 | 2015–2026 |
| Brenntag Polska Sp. z o.o. | 4 | 2015–2026 |
| Rurex sp. z o.o. | 4 | 2024–2026 |
| Wrocławski Związek Spółek Wodnych | 4 | 2023–2026 |
| Inżynieria Rzeszów S.A. | 4 | 2024–2026 |
| Brenntag Polska Spółka z o.o. | 3 | 2024–2026 |
| Omega – Zakład Sieci Wodno-Kanalizacyjnych Iwona Irzyk – lider konsorcjum | 3 | 2015 |
| Firma Handlowo-Usługowa INSTBUD Stanisław Boguta Sp. J. (lider konsorcjum) | 3 | 2015 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.