Design and execution of construction works related to rainwater and snowmelt management at the PILCZYCKI POND facility
Zaprojektowanie i wykonanie robót budowlanych związanych z zagospodarowaniem wód opadowych i roztopowych na obiekcie STAW PILCZYCKI
Poland · Wrocław · how to bid here →
Your path to submission
- Deadline: 14 October at 23:59 — 11 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (73 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to AQUA PARTNER Sp. z o.o..n = 73
- 24% of this buyer's awards went to companies that had already won here before (239 awards since 2015, spread over 106 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 239 awards since 2015
- The median procedure drew 2 bids (165 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 165
- 10% of awards went to companies from abroad (239 awards with a known winner country). Sector average: 0%.n = 239
- 92% of the bids received came from small and medium-sized enterprises (44 procedures with a bid mix). Sector: 84%.n = 44
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Typical field: median 3 (from 42 awards).
What the buyer is looking for
4.1. The subject of the contract is the execution of construction works consisting in the design and execution of construction works related to the management of rainwater and meltwater at the STAW PILCZYCKI facility.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kemipol Sp. z o.o. | 8 | 2015–2026 |
| Elektrotim S.A. | 6 | 2024–2026 |
| AG System Sp. z o.o. | 6 | 2015–2026 |
| Brenntag Polska Sp. z o.o. | 4 | 2015–2026 |
| Rurex sp. z o.o. | 4 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.