Design and execution of construction works for the construction of a complete module for the preparation of biodegradable waste for the cofermentation process in WKF at WOŚ
Zaprojektowanie i wykonanie robót budowlanych dot. budowy kompletnego modułu przygotowania odpadów biodegradowalnych do procesu kofermentacji w WKF na WOŚ
Poland · Wrocław · how to bid here →
Your path to submission
- Deadline: 12 October at 23:59 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (73 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to AQUA PARTNER Sp. z o.o..n = 73
- 24% of this buyer's awards went to companies that had already won here before (239 awards since 2015, spread over 106 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 239 awards since 2015
- The median procedure drew 2 bids (165 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 165
- 10% of awards went to companies from abroad (239 awards with a known winner country). Sector average: 0%.n = 239
- 92% of the bids received came from small and medium-sized enterprises (44 procedures with a bid mix). Sector: 84%.n = 44
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 3 (from 42 awards).
What the buyer is looking for
1. The subject of the contract is the design and execution of construction works for the construction of a complete module for the preparation of biodegradable waste for the fermentation process at the WKF at the WOŚ, including: 1.1. The scope of design works includes in particular: 1) preparation of the preliminary design, 2) preparation of the construction design together with obtaining all the required administrative decisions, arrangements and opinions, including the final decision on the building permit, 3) preparation of the technical design, 4) preparation of executive designs, 5) preparation of the commissioning design, 6) preparation of the settlement cost estimate. 1.2. The scope of construction works includes, in particular, the execution of: 1) a building for the preparation of biodegradable waste, 2) tanks for the reception and preparation of biodegradable waste, 3) a buffer…
Show full description
… tank for waste after pasteurization, 4) a malodorous air filter, 5) a car scale, 6) installations that equip facilities, in particular: a) waste transport installations, b) installations for emptying waste barrels, c) installations for emptying waste pallet containers, d) installations for suction hoses with a basket, e) installations for washing/flushing equipment, fittings and pipelines with hot water under pressure, f) installations for washing/flushing equipment, fittings and pipelines with cold water under pressure, g) installations for dispensing chemicals for dissolving fats, h) water supply installations, i) technological water installations, j) , sanitary and rainwater sewage installations k) , process heat installations using energy from cogeneration and backup installations, l) general electrical installations, including power supply, external, internal, emergency lighting, etc. m) CCTV, SSWIN and access control (SKD) installations, n) installation of a fire switch, o) installation of monitoring, 7) electrical technological installations and automation and AKPiA, 8) extension of the existing energy visualization system SYNDIS RV, 9) extension of the existing SCADA system of the EcoStruxure type v. 3.2., 10) complete systems of internal roads and shunting yards, together with the connection with the existing communication system, 11) other facilities, equipment and installations necessary for the proper implementation of the subject of the Agreement. 1.3. The scope of the works also includes the execution of all temporary and associated works and supplies and services necessary to achieve the purpose of the investment and its proper functioning, even if they are not expressly indicated in para. 3 of this paragraph. 1.4. As part of the performance of the subject of the Contract, the Contractor is also obliged to: 1) obtaining a decision on permission to use, 2) performing copyright supervision, 3) ensuring archaeological and sapper supervision - to the extent required by law or the conditions for the execution of works. 2. Detailed requirements of the Ordering Party regarding the subject of the contract have been included in the Description of the subject of the contract, constituting Annex 1 to the ToR, i.e. Functional-Use Programme: ‘Design and construction of a building for the preparation of biodegradable waste for the fermentation process at the WKF, together with tanks and associated infrastructure and the start-up of the process at the Wrocław Sewage Treatment Plant, on plots No: 2/12; 2/15; a.m. 7 area 026401_1.0043 Pracze Odrzańskie, City of Wrocław, developed by E.CORAX Sp. z o.o.. 09.2023, annexed to the Agreement. The Functional and Utility Programme takes into account the changes and additions made by the Contracting Authority before launching the public procurement procedure, aimed at adapting the scope of the investment to the current needs and requirements of the procedure. · 1. The subject of the contract is the design and execution of construction works for the construction of a complete module for the preparation of biodegradable waste for the fermentation process at the WKF at the WOŚ, including: 1.1. The scope of design works includes in particular: 1) Pre-drafting
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kemipol Sp. z o.o. | 8 | 2015–2026 |
| Elektrotim S.A. | 6 | 2024–2026 |
| AG System Sp. z o.o. | 6 | 2015–2026 |
| Brenntag Polska Sp. z o.o. | 4 | 2015–2026 |
| Rurex sp. z o.o. | 4 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.