Dostawa flokulantu do wspomagania procesu mechanicznego odwadniania (kondycjonowania) 25 000 Mg s.m. osadu przefermentowanego
Poland · Wrocław · how to bid here →
Your path to submission
- Deadline: 21 October at 23:59 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (25 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Kemipol Sp. z o.o..n = 25
- 24% of this buyer's awards went to companies that had already won here before (239 awards since 2015, spread over 106 companies). That is well below the sector norm (54%) — this buyer switches suppliers more often than others.n = 239 awards since 2015
- 10% of awards went to companies from abroad (239 awards with a known winner country). Sector average: 1%.n = 239
- 92% of the bids received came from small and medium-sized enterprises (43 procedures with a bid mix). Sector: 69%.n = 43
- The median procedure drew 2 bids (164 procedures with a bid count); 32% ended with a single bidder. Sector: median 2 bids.n = 164
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Chemical products, 57 contracts went to foreign companies over the last 3 years (of 7,385 recorded awards) — mostly from Germany, Bulgaria, France.
Submission language: POL.
Typical field: median 1 (from 21 awards).
What the buyer is looking for
The subject of the order is the supply of flocculant to support the process of mechanical dewatering of fermented sludge. Floculant is to be delivered in solid form – powder in packages in so-called big bags (500 to 750 kg) to the Wrocław Wastewater Treatment Plant, used for the dewatering of fermented sludge within 12 months from the date of conclusion of the Agreement.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kemipol Sp. z o.o. | 8 | 2015–2026 |
| AG System Sp. z o.o. | 6 | 2015–2026 |
| Elektrotim S.A. | 6 | 2024–2026 |
| Brenntag Polska Sp. z o.o. | 4 | 2015–2026 |
| Wrocławski Związek Spółek Wodnych | 4 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.