Onderhoud E&W-installaties
Netherlands · how to bid here →
Your path to submission
- Deadline: 16 October at 11:00 — 39 days left.
- You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 2 bids (14 procedures with a bid count); 43% ended with a single bidder. Country: median 5.3 bids.n = 14
- 0% of this buyer's awards went to companies that had already won here before (19 awards since 2024, spread over 19 companies). That is well below the national norm (15%) — this buyer switches suppliers more often than others.n = 19 awards since 2024
- 111% of the bids received came from small and medium-sized enterprises (14 procedures with a bid mix). Country: 68%.n = 14
- 5% of awards went to companies from abroad (19 awards with a known winner country). National average: 7%.n = 19
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Netherlands, 1,964 contracts went to foreign companies over the last 3 years (of 34,407 recorded awards) — mostly from Germany, France, Belgium.
What the buyer is looking for
Aanleiding voor deze aanbesteding is het aflopen van de huidige onderhoudsgarantie die AQUON heeft met de dienstverleners voor de E&W-installaties. Er is behoefte aan een of meerdere betrouwbare partner(s) voor het verzorgen van het onderhoud aan E&W-installaties. Binnen de scope van deze aanbesteding vallen: Het correctief en preventief onderhoud van alle in het gebouw aanwezige E&W-installaties, uitgezonderd de specifieke (maatwerk) apparatuur in het laboratorium. Zie verder aanbestedingsleidraad.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ATKB B.V. | 1 | 2024 |
| Balans Selective B.V. | 1 | 2024 |
| Bureau Waardenburg B.V. | 1 | 2024 |
| Driessen B.V. | 1 | 2024 |
| Ecofide | 1 | 2025 |