How to bid in this country: portals, deadlines, thresholds →
Design and comprehensive execution of construction works on railway lines No 623 and No 628 on the I+K section of Fornale – Szczyrzyc and Porąbka – Stróża as part of the project entitled ‘Construction of a new railway line Podłęże – Szczyrzyc – Tymbark / Mszana Dolna and modernisation of the existing railway line No 104 Chabówka – Nowy Sącz – Stage II’
Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 623 i nr 628 na odcinku I+K podg. Fornale – Szczyrzyc i podg. Porąbka – podg. Stróża w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II” — original title
Your path to submission
- Deadline: 13 November at 10:00 — 12 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
1. The subject of the Order is the execution of the following elements: Design and execution of works for the task entitled: ‘Construction of a building: railway line No 623 Fornale – Szczyrzyc, section I from km 0+042 to km 9+668 together with the technical infrastructure along railway line No 623 on the section from km 0+024 to km 9+934 and construction of a building entitled: railway link No 628 Porąbka – Stróża na odc. K from km 0+000 to km 1+452 with technical infrastructure along railway link No 628 from km 0+000 to km 1+517’. The entire subject of the Order includes the execution of the following elements: 1) Design documentation, including: a) preparation of the executive design, b) preparation of as-built documentation, including geodetic as-built documentation, 2) and works in the scopes described in the OPZ and PFU: (a) pavement and sub-platter, (b) drainage and hydrotechnical…
Show full description
… works, (c) external networks, (d) roads, (e) control-command and signalling equipment, (f) telecommunication equipment and systems, (g) overhead contact line and power and control system, (h) line of non-traction needs (LPN); i) electrical power equipment and systems up to 1 kV, j) engineering structures and associated works, including railway tunnels, k) platforms, passenger service facilities and cubature facilities, l) passages and crossings, m) geological and geotechnical works, n) works related to the execution of small architecture elements, o) felling of trees and shrubs and environmental industry works, p) any other works necessary to perform the task in accordance with applicable regulations. 3) works involving the construction of facilities for environmental protection. 4) carrying out the conformity assessment process for structural subsystems within the scope of the contract at each stage (design, construction and final testing of the subsystem) and providing the relevant ‘EC’ declarations of verification and ‘EC’ certificates of verification for the subsystems. The option for the interface includes the implementation of cooperation with other contractors performing construction works or deliveries to the Ordering Party, which require association with rail traffic control devices built-in as part of this task. Cooperation will take place through the Ordering Party and/or the Engineer. The Ordering Party anticipates that the scope of work carried out under other Contracts affects the need to make, among others, changes in the scope of interfaces (i.e. to implement the Option for the Interface as part of this task). The detailed scope of the Options for the Interface is specified in Chapter 5 of TOMU IV — PFU entitled: ‘Expected interface changes’, which concern the interlocking equipment to be built in under this contract. 2. Detailed Description of the Subject of the Order is presented in the Description of the Subject of the Order constituting Volume III of this Terms of Reference and the Functional-Use Program (PFU) constituting Volume IV of this Terms of Reference. 3. The Contracting Authority shall provide for the award of contracts referred to in Article 388(2)(c) of the Act. The scope of contracts referred to in Article 388(2)(c) of the Act and the conditions under which they will be awarded shall be determined by OPZ and PFU. A similar contract may be awarded by direct agreement, after prior negotiations with the Contractor, in particular as regards the terms of the contract, including price, performance period, warranty period/warranty period, and will consist in the repetition of similar implementation projects of the trade union industry and comprehensive construction works consistent with the subject of the contract, in particular in the following areas: a) dismantling and liquidation of railway infrastructure in poor technical condition, devastated, unused cubic facilities as well as elements interfering with design solutions, b) execution of construction works covering the track industry with drainage, engineering structures industry (including tunnels) along with hydrotechnical works in their vicinity, road industry, power industry, overhead contact line industry, overhead contact line supply industry
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (261 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to BUDIMEX S.A.n = 261
- 19% of this buyer's awards went to companies that had already won here before (1,670 awards since 2015, spread over 555 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 1,670 awards since 2015
- The median procedure drew 3 bids (1,233 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 1,233
- 18% of the bids received came from other countries (159 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 159
- 15% of awards went to companies from abroad (1,670 awards with a known winner country). Sector average: 0%.n = 1,670
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
1. W zakresie warunku określonego w punkcie 8.2.2 IDW wymagane jest wykazanie przez Wykonawcę, że w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie wykonał: a) robotę budowlan… read in fullcollapse
I. W zakresie warunku określonego w punkcie 8.2.2 IDW wymagane jest wykazanie przez Wykonawcę dysponowania osobami zdolnymi do wykonania Zamówienia: 1. Kierownik Budowy – 1 osoba (Uprawnienia-kwalifikacje zawodowe) uprawnienia budowlane bez ograniczeń do kiero… read in fullcollapse
cd. Kryteria kwalifikacji/ odpowiednie kwalifikacje edukacyjne i zawodowe: 5. Kierownik robót tunelowych - 1osoba (Uprawnienia -kwalifikacje zawodowe) uprawnienia budowlane bez ograniczeń do kierowania robotami budowlanymi w specjalności inżynieryjnej mostowej… read in fullcollapse
1. W zakresie warunku określonego w punkcie 8.2.2 IDW wymagana jest dostępność do niżej wymienionych narzędzi i urządzeń technicznych w celu realizacji Zamówienia: a. co najmniej 4 szt. - żuraw samojezdny kolejowy o maksymalnym udźwigu co najmniej 30 t; b. co … read in fullcollapse
1. W zakresie warunku określonego w punkcie 8.2.1 IDW wymagane jest wykazanie przez Wykonawcę, iż znajduje się w sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: a) posiada w ciągu ostatnich 3 lat obrotowych, a jeżeli okres prowadz… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| BBF Sp. z o.o. | 11 | 2015–2025 |
| KOLSAM Sp. z o.o. | 11 | 2024–2026 |
| PORR S.A. | 10 | 2021–2025 |
| Orange Polska S.A. | 10 | 2025 |
| Tabor Dębica Sp. z o.o. | 9 | 2015–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 171 completed awards — not a statement about this procedure.)
This procedure allows 14 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now