How to bid in this country: portals, deadlines, thresholds →
Execution of works for the task entitled ‘Modernisation and electrification of railway line No 24 on the section Piotrków Trybunalski – Bełchatów with extension to Bogumiłowa’, carried out under the Programme for Complementing Local and Regional Railway Infrastructure - Rail+ until 2032
Wykonanie robót dla Zadania pn.: „Modernizacja i elektryfikacja linii kolejowej nr 24 na odcinku Piotrków Trybunalski – Bełchatów z wydłużeniem do Bogumiłowa” realizowanego w ramach Programu Uzupełniania Lokalnej i Regionalnej Infrastruktury Kolejowej - Kolej+ do 2032 roku — original title
Your path to submission
- Deadline: 13 November at 09:00 — 12 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the Order is: Execution of works for the Task entitled: ‘Modernisation and electrification of railway line No 24 on the section Piotrków Trybunalski – Bełchatów with extension to Bogumiłów’, implemented under the Programme for Complementing Local and Regional Railway Infrastructure – Rail+ until 2032. The entire subject of the Order includes the execution of the following elements: Execution of works for the Basic Scope (Task I): 1) track works, 2) platforms, 3) overhead contact line, 4) power equipment and systems up to 1 kV, 5) road systems, 6) engineering structures, 7) cubic structures, 8) passages and crossings, 9) execution of works consisting in the construction of facilities for environmental protection, 10) dendrology, 11) small architecture, 12) networks, connections and sanitary facilities, 13) land development. Development of projects together with the…
Show full description
… implementation of works for the Basic Scope (Task II): 1) control-command and signalling equipment, 2) telecommunication networks, equipment and systems. Execution of works for Option 1 (Task I): - electrification of railway line No 24 between Piotrków Trybunalski and Bogumiłów. Execution of works for Option 2 (Task I): - construction of the freight part of Bogumiłów station. Development of projects and execution of works for Option 2 (Task II): - networks, interlocking equipment and telecommunication systems. Execution of works for Option 3 (Task I): - construction of a car park at Wola Krzysztoporska station with accompanying infrastructure. Execution of works for Option 4 (Task I): - construction of a parking lot at the Korczew passenger stop with accompanying infrastructure. Execution of works for Option 5 (Task I): - construction of a parking lot at the Bełchatów Miasto passenger stop with accompanying infrastructure. Execution of works for Option 6 (Task I): - construction of a parking lot at the Kurnos passenger stop with accompanying infrastructure. Execution of works for Option 7 (Task I): - construction of a parking lot at the Zarzecze nad Widawka passenger stop with accompanying infrastructure. Execution of works for Option 8 (Task I): - construction of a parking lot at the Trząs passenger stop with accompanying infrastructure. Execution of works for Option 9 (Task I): - construction of a parking lot at Bogumiłów station with accompanying infrastructure. Detailed Description of the subject of the Order has been presented in the scope of: – Task I: in the descriptive and drawing part of the Design Documentation, Technical Specifications for the Execution and Acceptance of Construction Works (STWIORB) constituting Volume III of the Terms of Reference and in the Works Quantity contained in Volume IV of the Terms of Reference, – Tasks II: is presented in the FPU constituting Volume III of the FTZ and in the RCO contained in Volume IV of the FTZ, ‘Option rights: is presented in Volume III of the SWZ and in the Works Quantity and RCO contained in Volume IV of the SWZ. · Information to supplement Section 5.1.3. Estimated duration: Duration of the Order: 28 months from the date of conclusion of the Agreement, in accordance with § 4 of the Terms and Conditions, contained in Volume II of the Terms and Conditions, including: a) completion of all Works (subject to the point below), for the Basic Scope and Options (if they are launched), confirmed by the Ordering Party's Last Final Acceptance, including providing the Ordering Party with complete as-built documentation and providing the Ordering Party with a set of documents related to the certification process – 20 (twenty) months from the date of conclusion of the Agreement, b) providing the Ordering Party with permits for placing in service structural subsystems, in accordance with the Rail Transport Act for the Basic Scope and Options (if they are launched) – no longer than within 8 (eight) months from the date of the Ordering Party's Last Final Acceptance.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (261 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to BUDIMEX S.A.n = 261
- 19% of this buyer's awards went to companies that had already won here before (1,670 awards since 2015, spread over 555 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 1,670 awards since 2015
- The median procedure drew 3 bids (1,231 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 1,231
- 18% of the bids received came from other countries (157 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 157
- 15% of awards went to companies from abroad (1,670 awards with a known winner country). Sector average: 0%.n = 1,670
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
What you must prove — eligibility criteria
W zakresie warunku dotyczącego zdolności technicznej lub zawodowej wymagane jest wykazanie przez Wykonawcę , że w okresie ostatnich 10 (dziesięciu) lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie … read in fullcollapse
Dysponowanie osobami zdolnymi do wykonania Zamówienia, zgodnie z poniższym wyszczególnieniem: 1. Dyrektor kontraktu - 1 osoba - posiada co najmniej 3 (trzy) lata doświadczenia zawodowego na stanowisku dyrektora kontraktu lub zastępcy dyrektora kontraktu* lub n… read in fullcollapse
Dostępności do niżej wymienionych narzędzi i urządzeń technicznych w celu realizacji Zamówienia: a. co najmniej 1 szt. - żuraw samojezdny kolejowy o maksymalnym udźwigu co najmniej 30 t; b. co najmniej 1 szt. - oczyszczarka tłucznia o wydajności co najmniej 60… read in fullcollapse
W zakresie warunku dotyczącego sytuacji ekonomicznej i finansowej wymagane jest wykazanie przez Wykonawcę, że znajduje się w sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: a) posiada w ciągu ostatnich 3 lat obrotowych, a jeżeli o… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| BBF Sp. z o.o. | 11 | 2015–2025 |
| KOLSAM Sp. z o.o. | 11 | 2024–2026 |
| PORR S.A. | 10 | 2021–2025 |
| Orange Polska S.A. | 10 | 2025 |
| Budimex S.A. | 9 | 2015–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 171 completed awards — not a statement about this procedure.)
This procedure allows 14 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now