Performing architectural, construction, electrical and mechanical works on the arrangement and functional modernization of six workshops (halls) for the maintenance of railway vehicles, by groups of procurement items, in five locations: Center Osijek, Center Pula, Center Solin, Center Varaždin and Center Vinkovci

Izvođenje arhitektonsko-građevinskih, elektrotehničkih i strojarskih radova na uređenju i funkcionalnom osuvremenjivanju šest radionica (hala) za održavanje željezničkih vozila, po grupama predmeta nabave, na pet lokacija: Centar Osijek, Centar Pula, Centar Solin, Centar Varaždin i Centar Vinkovci — original title

HRCroatia · Grad Zagreb

Your path to submission

  1. Deadline: 30 November at 10:00 — 29 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Croatian.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the procurement is the execution of architectural, construction, electrical and mechanical works on the arrangement and functional modernization of six workshops (halls) for the maintenance of railway vehicles, by groups, in five locations: Center Osijek, Center Pula, Center Solin, Center Varaždin and Center Vinkovci. The works include the refurbishment of the workshop space at the specified locations, which does not affect the location conditions or the fulfilment of the essential requirements for the building (basic requirements of mechanical resistance and stability, fire safety, hygiene, health and environmental protection, safety and accessibility during use, noise protection, etc.), all in accordance with Article 3. Ordinance on simple and other buildings (OG 31/20, 74/22, 155/23), which stipulates that without a permit and the main design, works may be carried out…

Show full description

… for the purpose of remodelling or adapting the space to the new needs according to which the organization of the space, non-loadbearing partition elements of the building and/or installation changes, and which changes do not affect the fulfilment of mechanical resistance and stability for the building and/or safety in the event of fire, and do not change the conformity of the building with the location conditions in accordance with which it was built. The works shall also cover the delivery, installation and commissioning of the related equipment necessary for the functional modernisation of the workshops identified in this Procurement Document. This open procurement procedure is divided into lots of procurement items, i.e. each location (irrespective of the number of workshops it contains) represents one lot of procurement items. In accordance with the above, the procurement procedure in question was divided into 5 (five) lots. The nature, scope and technical characteristics of the works and equipment for each of the six workshops are set out in detail in the project documentation, technical specifications, drawings and cost statements structured by lot of the subject matter of the procurement, which form an integral part of this Procurement Document and form a single technical unit for the workshop in question and cover: Map 1 – Architectural and thermal protection calculation, Map 2 – Electrical and lightning protection installation project, Map 3 – Mechanical project – Thermotechnical installation project. The project documentation, technical specifications, drawings and cost statements drawn up for each lot of the subject of procurement and the workshop are consistent with each other and form a single technical and performance unit, and relate exclusively to the works and equipment for that workshop. The technical documentation that forms an integral and inseparable part of this Tender documentation contains a description of the current situation for each individual location, includes a description of the existing construction, architectural, mechanical, electrical and functional condition of buildings, existing infrastructure, spatial constraints, as well as all other data necessary for the preparation of the tender and the execution of the works. The scope of the works covers all the activities, works, deliveries, tests and commissioning required for the performance of the contract. If, in the course of the examination of the Tender documentation, an economic operator becomes aware of any lack of conformity, contradiction or ambiguity, it may, within the time limits and in the manner prescribed by the Tender documentation, request clarification from the Contracting Authority. Since the subject-matter of the procurement is contracted under the ‘turnkey’ system and the works are carried out in existing workshops for the maintenance of rolling stock with different construction, installation and functional characteristics, economic operators are obliged to carry out a site survey of the lot of the subject-matter for which they submit a tender before submitting a tender. In accordance with the above mentioned Contracting Authority pursuant to the provisions of Article 238. The Public Procurement Act lays down an adequate time limit for the submission of tenders. The request for inspection of the site/s shall be submitted exclusively through the EOJN RH system with an indication of the group of subject matter for which the economic operator intends to carry out a visit and submit a tender. Detailed conditions for the inspection of the site are regulated by the annex "Technical Specification". · The subject of procurement for lot 1 is the execution of architectural-gr

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€7,400,000
Published28 Oct 2026
ProcedureOpen procedure
5 lotsReserved for SMEs

Type of service

45 · Construction work
CPV 45213000

Clement What the numbers say about this buyer

  • 24% of the bids received came from small and medium-sized enterprises (24 procedures with a bid mix). Sector: 81%.n = 24
  • 56% of this buyer's awards went to companies that had already won here before (429 awards since 2017, spread over 141 companies). That is well below the sector norm (69%) — this buyer switches suppliers more often than others.n = 429 awards since 2017
  • The award came in at a median 123% of the estimated value (335 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 93%.n = 335
  • The median procedure drew just one bid (55 procedures with a bid count); 87% ended with a single bidder. Sector: median 3 bids.n = 55
  • 5% of awards went to companies from abroad (429 awards with a known winner country). Sector average: 2%.n = 429

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

What you must prove — eligibility criteria

›
Trade register enrolment
Detalji opisani u dokumentaciji o nabavi
›
Other economic requirement
Detalji opisani u dokumentaciji o nabavi
›
References: works
Detalji opisani u dokumentaciji o nabavi
›
Technical staff for execution
Detalji opisani u dokumentaciji o nabavi
›
Trade register enrolment
Detalji opisani u dokumentaciji o nabavi
›
Other economic requirement
Detalji opisani u dokumentaciji o nabavi
›
References: works
Detalji opisani u dokumentaciji o nabavi
›
Technical staff for execution
Detalji opisani u dokumentaciji o nabavi
›
Trade register enrolment
Detalji opisani u dokumentaciji o nabavi
›
Other economic requirement
Detalji opisani u dokumentaciji o nabavi
›
References: works
Detalji opisani u dokumentaciji o nabavi
›
Technical staff for execution
Detalji opisani u dokumentaciji o nabavi
›
Trade register enrolment
Detalji opisani u dokumentaciji o nabavi
›
Other economic requirement
Detalji opisani u dokumentaciji o nabavi
›
Security/guarantee required
Requirement texts are quoted in the notice's original language — only the official wording is binding.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
KING ICT d.o.o.292018–2026
ČAZMATRANS PROMET d.o.o.202018–2024
TVORNICA ŽELJEZNIČKIH VOZILA GREDELJ d.o.o.182018–2023
Comping d.o.o.142018–2024
HEMCO d.o.o.132018–2023
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Monday 30 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 2,345 completed awards — not a statement about this procedure.)

This procedure allows 33 days between publication and deadline — typical in this country is 30 (median of 387 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Croatia · Construction work, 14 contracts went to foreign companies over the last 3 years (of 2,224 recorded awards).

Submission language: Croatian.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Croatian
The 14 criteria on the left, plus your price.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now