How to bid in this country: portals, deadlines, thresholds →
PV Zrt. no-dig reconstruction works 2026-2027
PV Zrt. no-dig rekonstrukciós munkák 2026-2027 — original title
Your path to submission
- Deadline: 1 December at 12:00 — 30 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Part 1: Pannon-Víz Zrt. No-dig reconstruction works in the area of Győr Plant Engineering with on-site curing epoxy resin-bonded liner, 5 locations total 2.692 fm (drinking water: 490 fm, sewage: 2.202 fm) in length: - Lining of the NA 400 steel drinking water conduit in the floodplain of Holt Rábca, Győr, 240 fm length - Lining of the NA400 drinking water conduit in the length of 250 fm - section between Szent István u. Jókai u. and Benczúr u. NA350 concrete sewer liner in the length of 63 fm, lining of the NA400 concrete sewer liner in the length of 243 fm with domestic connections, sinks, roof water drain liner in a total length of 20 fm - Szent István u. - Bisinger promenade between Aradi Vértanúk u. NA350 concrete sewer liner in the length of 536 fm, lining of the NA30/45 concrete sewer liner in the length of 144 fm, lining of the NA40/60 concrete sewer in the length of 44 fm,…
Show full description
… domestic connections, sinks, roof water sinks, roof water drainage with drainage liner in a total length of 52 667 fm. - Zrínyi u. - NA400 concrete sewer liner with a length of 37 fm, NA40/60 concrete sewer liner liner with a length of 125 fm, domestic connections, sinkholes, roof water drain liner with a total length of 16 pieces of 174 fm. Part 2: Pannon-Víz Zrt. No-dig reconstruction works in the area of Kapuvár- Csorna Plant Engineering with on-site curing epoxy resin-bonded liner or on-site shaped PE liner technology, 3 locations totalling 435.4 fm (drinking water: 145 fm, sewage: 290,7 fm) in length: - Pali sewage treatment plant NA 214 KO purified sewage line line liner with a length of 17.4 fm, 2 pneumatic butterfly valve replacements NA 214 and 2 manual butterfly valve replacements NA 214; - Csorna centre, internal lining of drinking line NA300 with a length of 145 fm; - Renovation of the NA300 concrete sewer in Csorna, Erzsébet királyné utca with a length of 273 fm and renovation of the inner surface of the existing 16 NA100 concrete treatment shafts with a sewage-resistant coating system. The pipelines/channels affected by the reconstruction in both parts of the call are located in the inner city area. The basis for the ability to carry out No-Dig construction work is the minimization of on-site demolition tasks! There are decorative coverings in several locations, the possible demolition of which can generate unrealistically high additional costs! · Part 1: Pannon-Víz Zrt. No-dig reconstruction works in the area of Győr Plant Engineering with on-site curing epoxy resin-bonded liner, 5 locations total 2.692 fm (drinking water: 490 fm, sewage: 2.202 fm) in length: - Lining of the NA 400 steel drinking water conduit in the floodplain of Holt Rábca, Győr, 240 fm length - Lining of the NA400 drinking water conduit in the length of 250 fm - section between Szent István u. Jókai u. and Benczúr u. NA350 concrete sewer liner in the length of 63 fm, lining of the NA400 concrete sewer liner in the length of 243 fm with domestic connections, sinks, roof water drain liner in a total length of 20 fm - Szent István u. - Bisinger promenade between Aradi Vértanúk u. NA350 concrete sewer liner in the length of 536 fm, lining of the NA30/45 concrete sewer liner in the length of 144 fm, lining of the NA40/60 concrete sewer in the length of 44 fm, domestic connections, sinks, roof water sinks, roof water drainage with drainage liner in a total length of 52 667 fm. - Zrínyi u. - NA400 concrete sewer liner with a length of 37 fm, NA40/60 concrete sewer liner liner with a length of 125 fm, domestic connections, sinkholes, roof water drain liner with a total length of 16 pieces of 174 fm. The pipelines/channels affected by the reconstruction in both parts of the call are located in the inner city area. The basis for the ability to carry out No-Dig construction work is the minimization of on-site demolition tasks! There are decorative coverings in several locations, the possible demolition of which can generate unrealistically high additional costs! · Part 2: Pannon-Víz Zrt. No-dig reconstruction works in the area of Kapuvár- Csorna Plant Engineering with on-site curing epoxy resin-bonded liner or on-site shaped PE liner technology, 3 locations totalling 435.4 fm (drinking water:
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (11 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to AGRIAPIPE Csőtisztító, Építő és Szolgáltató Korlátolt Felelősségű Társaság.n = 11
- 18% of this buyer's awards went to companies that had already won here before (34 awards since 2021, spread over 17 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 34 awards since 2021
- The median procedure drew 3 bids (27 procedures with a bid count); 7% ended with a single bidder. Sector: median 5 bids.n = 27
- 12% of awards went to companies from abroad (34 awards with a known winner country). Sector average: 4%.n = 34
- 55% of the bids received came from small and medium-sized enterprises (23 procedures with a bid mix). Sector: 68%.n = 23
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/10/2026.
What you must prove — eligibility criteria
G1. Alkalmatlan az ajánlattevő, ha a felhívás feladása napját megelőző 3 mérlegfordulónappal lezárt üzleti évben szennyvíz- és/vagy ivóvízhálózaton végzett javítási és/vagy felújítási és/vagy rekonstrukciós munkákból származó nettó árbevétele összesen nem éri … read in fullcollapse
M1. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik - a 321/2015. (X.30.) Korm. rendelet 21. § (2) bekezdés a) pontja alapján - a felhívás feladása napjától visszafelé számított öt évben (60 hónapos időszakban) teljesített legalább NA 300 mm átmérővel ö… read in fullcollapse
M2. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik - a 321/2015. (X.30.) Korm. rendelet 21. § (2) bekezdés a) pontja alapján - a felhívás feladása napjától visszafelé számított öt évben (60 hónapos időszakban) teljesített legalább NA 20 cm átmérővel ös… read in fullcollapse
M3. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik legalább 1 fő szakemberrel, aki a) a feladat ellátásához a 266/2013. (VII. 11.) Korm. rendelet 1. melléklet VI./3. rész 7. pontjában meghatározott, „MV-VZ” kategóriás felelős műszaki vezetői jogosultsá… read in fullcollapse
G1. Alkalmatlan az ajánlattevő, ha a felhívás feladása napját megelőző 3 mérlegfordulónappal lezárt üzleti évben szennyvíz- és/vagy ivóvízhálózaton végzett javítási és/vagy felújítási és/vagy rekonstrukciós munkákból származó nettó árbevétele összesen nem éri … read in fullcollapse
M1. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik - a 321/2015. (X.30.) Korm. rendelet 21. § (2) bekezdés a) pontja alapján - a felhívás feladása napjától visszafelé számított öt évben (60 hónapos időszakban) teljesített legalább NA 300 mm átmérővel ö… read in fullcollapse
M2. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik - a 321/2015. (X.30.) Korm. rendelet 21. § (2) bekezdés a) pontja alapján - a felhívás feladása napjától visszafelé számított öt évben (60 hónapos időszakban) teljesített legalább NA 30 cm átmérővel ös… read in fullcollapse
M3. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik legalább 1 fő szakemberrel, aki a) a feladat ellátásához a 266/2013. (VII. 11.) Korm. rendelet 1. melléklet VI./3. rész 7. pontjában meghatározott, „MV-VZ” kategóriás felelős műszaki vezetői jogosultsá… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| KULTÚRMÉRNÖK Építőipari és Kereskedelmi Korlátolt Felelősségű Társaság | 3 | 2025–2026 |
| BONEX Építőipari Korlátolt Felelősségű Társaság | 2 | 2025–2026 |
| Szer-Víz-Tech Kft. | 2 | 2025–2026 |
| AGRIAPIPE Csőtisztító, Építő és Szolgáltató Korlátolt Felelősségű Társaság | 2 | 2025–2026 |
| Betonutépitő Zrt. | 2 | 2025–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 11 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 30 (median of 664 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now